Title Page

  • Document No.F82-26-01

  • Walk through audit

  • Conducted on

  • Champion Supervisor

  • Shifts audited

  • Scoring Criteria

  • Grade Scale

  • Prepared by

Sort

  • Every Item in area needed for regular work (no unnecessary)<br>

  • No Junk in drawers

  • Non value added process steps removed?

  • Evidence of regular sorting exists

Systemize/Standardize

  • Tools and gage locations marked; place for everything, everything in its place if not in use

  • No misc items along walls, top of equipment

  • Work stations and machine areas free of personal items

  • Cleaning supplies and equipment in place and properly marked <br>

  • Air hoses in properly marked place and free of any leaks

  • Aisles clearly marked and clear of obstruction<br>

Sanitize

  • Machines are free of any leaks

  • Area free of chips and other contaminants outside machining area

  • Spill kit barrels properly identified located and contents available

  • Work instructions in proper location and easily accessible

Safety

  • PPE available and used when required

  • All spray bottles properly labeled

  • Fire extinguishers present in designated locations not blocked

  • Safety devices not bypassed

  • Floors clean and no coolant slip areas

  • No accidents for a month

  • Lockout tag out equipment in work condition/ evidence of use workers trained

  • Electrical cords in proper place,in good condition,not a trip hazard

  • Area properly lighted

  • Equipment wiring properly enclosed

5S Sustain

  • Compare prior audit of this area

Stray Parts

  • Proper identification / tagging / segregation of suspect from good. Raw/WIP/PTR/Special runs. Also review Quarantine area (MRB) for this product.

  • Disposition of non conforming product per p83 control of NCP

  • Suspect and scrap material properly recorded

Process Flow /control

  • Current Process Flow Matches control plan

  • Review reaction plan when process or product is out of spec

  • Continual Improvements made in last year

  • Coolant logs properly completed

  • No outdated copies of controlled documents-sample 3 to compare to DC database. Note doc # and rev #

Training

  • Sample employees for proper training in area where they're working -Job training sheet started/up to date.

  • 10 commandments of shop floor quality - Ask employee to describe them.

  • Open quality alerts known by employees, no closed alerts in cell.

  • Employee knows where instructions are located.

Inspections

  • Gages are used within calibration due dates-sample 3, record gage #and due date to compare to GAGETrak.

  • Employee demonstrates proper use of gages

  • LPA completed

  • Records of inspection are available and in proper format

  • LPA filled out without pencil whipping

  • No sign offs by yellow status employees in training.

  • Scrap areas not overflowing

  • First Article & Containment forms filled out correctly- review completed records in QC Lab.

Process Sustain

  • Compare pior audit of this area, prior score.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.