Information

  • Document No.

  • Structure No.

  • Area

  • Lot No.

  • Conducted on

  • Date of installation

  • Prepared by

  • Location

Structure checklist

  • Bolt hole <6mm greater or washer used

  • Structure correct to IFC

  • Fasteners correct to IFC

  • Structure levelling nuts & double nuts used and tightened correctly

  • Rake direction as per drawing

  • Design rake:

  • Unit of rake

  • Actual rake:

  • Unit of rake

  • Bridge installed and tightened correctly

  • Drop verticals installed correctly

  • Structural fasteners (drop verticals, bridges, etc.) used correctly (bolt heads up, double nutted, etc.)

  • Structure grouted correctly

  • Structure label installed correctly (toward driver)

  • Sufficient clearance to existing electrical structures

Defects

  • Any additional defects present?

Photos

  • Add media

As-Built Inspection

  • Non compliance?

  • NCR No.

Sign Off

  • Project Engineer/Supervisor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.