Title Page
MU W807 Weekly Water Treatment Facility Checklist
-
Month and Year:
-
1) Clean and calibrate P.H. probe.
-
2) Check air blower intake filter, clean or replace.
-
3) Grease air blower bearings (2 grease fittings).
-
a. Air blower#1
-
b. Air blower #2
-
4) Check air blower gear house oil.
-
a. Air blower #1
-
b. Air blower #2
-
5) Check nozzle spray pattern for proper pattern and shape.
-
a. Backwash tank A
-
b. Backwash tank B
-
6) Operate all chemical feed line values to prevent sticking.
-
a. KMnO4
-
b. Fluoride
-
c. Polymer
-
d. Chlorine
-
7) Recharge filter media by overfeeding KMnO4 until pink color.
-
8) Known positive colliery test. Test first Tuesday, send copy to John.
-
9) Dump water down floor drain in women's bathroom.
-
10) Check and Date all fire extinguishers, per Federal law.
-
11) Lubricate and exercise hinge covers on 18" overflow pipes at WTF. (Located near driveway by southeast corner of fence.)
-
12) Check radio communications by disconnecting Ethernet. (Port #9 in electrical room.)
-
13) Check and clean UV lamp in lab.