Mubadala tower
-
Site name
-
Inspection purpose
-
Prepared by
-
Add location
CO-WORKING LOUNGE AREA-027
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marbles in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electrical
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Area#1
Open workstation-046
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electrical
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Meeting room-045
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Store-044
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Corridor between business center & hard focus room
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Store-047
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Roastery-039
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Corridor between Roastery & washroom
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Male toilet-001 and disable toilet
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?
-
Are all cubicles doors in good condition in terms of hinges, alignment, accessories, scratches,…etc?
-
Are all mirrors and glass partitions in good condition?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Plumping
-
Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?
-
Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?
-
Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking
-
Are drain floor free of clogs, installed in good way and compatible with approved layouts?
Female toilet-001
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?
-
Are all cubicles doors in good condition in terms of hinges, alignment, accessories, assets labeling …etc?
-
Are all mirrors and glass partitions in good condition?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Plumping
-
Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?
-
Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?
-
Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking
-
Are drain floor free of clogs, installed in good way and compatible with approved layouts?
Pantry-001
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?
-
Are all cabinets doors in good condition in terms of hinges, alignment, accessories, scratches, assets labeling,..etc?
-
Are all mirrors and glass partitions in good condition?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Plumping
-
Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?
-
Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?
-
Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking
-
Are drain floor and sink trap free of clogs, installed in good way and compatible with approved layouts?
Unit head office -063
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Hard focus room-064
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Huddle room-065
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Soft focus room-040
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Huddle room-041
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Hard focus room-042
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Business center-048
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Long corridor between workstations area and closed rooms
Civil part
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Electrical room-504
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Open Workstation area-053
Civil part
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Phone booth-055
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Store-062
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Huddle room-054
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Soft focus-057
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Open workstation area-058
Civil part
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Phone booth-056
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Soft focus room -059
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Open workstation area-060
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Director office-062
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Majlis
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Area #2
Formal meeting room-031
Civil part
-
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
The corridor between formal meeting room & waiter room
-
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Waiter room -007
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Huddle room-006
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Director office-005
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Long corridor between & formal meeting room & IDF room
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Pantry next of store
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?
-
Are all cabinets doors in good condition in terms of hinges, alignment, accessories, scratches, assets labeling,..etc?
-
Are all mirrors and glass partitions in good condition?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Plumping
-
Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?
-
Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?
-
Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking
-
Are drain floor and sink trap free of clogs, installed in good way and compatible with approved layouts?
POD toilet
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?
-
Are all cubicles doors in good condition in terms of hinges, alignment, accessories, assets labeling …etc?
-
Are all mirrors and glass partitions in good condition?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Plumping
-
Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?
-
Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?
-
Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking
-
Are drain floor free of clogs, installed in good way and compatible with approved layouts?
Store-024
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Huddle room-023
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Corridor between huddled room & rejuvenation lounge
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Rejuvenation lounge-022
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Electrical cabinet-503
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Corridor between rejuvenation room & IDF room
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
IDF room-704
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Director office-020
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Open workstation area-008
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Archive room-004
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Store-003
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Unit head-002
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Phone booth-009
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
- Yes
- No
- N/A
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Phone booth-010
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Director office-019
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Director office-018
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Director office-017
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Director office-016
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Female toilet
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?
-
Are all cubicles doors in good condition in terms of hinges, alignment, accessories, scratches,…etc?
-
Are all mirrors and glass partitions in good condition?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Plumping
-
Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?
-
Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?
-
Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking
-
Are drain floor free of clogs, installed in good way and compatible with approved layouts?
Male toilet
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?
-
Are all cubicles doors in good condition in terms of hinges, alignment, accessories, scratches,…etc?
-
Are all mirrors and glass partitions in good condition?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Plumping
-
Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?
-
Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?
-
Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking
-
Are drain floor free of clogs, installed in good way and compatible with approved layouts?
Huddle room-012
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Hard focus-011
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Phone booth-014
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Phone booth-015
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction
Open workstation area at phon booth 014 & 015
Civil part
-
Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?
-
Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?
-
Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?
-
Are there access panels on the ceiling for maintenance purposes?
-
Are shelfs, racks, cabinets…etc installed as designed and in goods condition?
-
Is the raised floor in good condition in terms of leveling, installation and finishing?
-
Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?
-
Drag general photos in this suction.
HVAC
-
-
Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?
-
Are all FCUs in good condition in terms of installation and functionality?
-
Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations
-
Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?
-
Are all chilled water lines and duct insulated properly and free from any fungus
-
Are all VAV’s are brand new and working functionally?
-
Are all thermostats/ touch screen are brand new and working functionally ?
-
Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?
-
Are all HVAC system interfacing with BMS? If yes, is it working functionally?
-
Drag general photos in this suction
Electric
-
Are all floor boxes in good condition?
-
Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?
-
Are all lights working functionally?
-
Did all illuminations locate as per design and compatible with approved layouts?
-
Are all lights switch/ screen control is working properly and labeled as per agreed approach?
-
Are all lighting interfacing with BMS? If yes, it working functionally?
-
Drag general photos in this suction
FLS
-
Are all FA detectors in good condition and interfacing with main FACP?
-
Did all FA detectors installed as per approved layouts?
-
Are all FA detectors cleaned and blinking?
-
Did all sprinklers in good condition?
-
Did all sprinklers installed as per approved layouts?
-
Are all FF pipelines and the connections free of leakage and in good condition?
-
Did all FLS assets labeled as per agreed approach?
-
Is zone control valve energized and in good condition?
-
Drag general photos in this suction