Mubadala tower

  • Site name

  • Inspection purpose

  • Prepared by

  • Add location

CO-WORKING LOUNGE AREA-027

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marbles in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electrical

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Area#1

Open workstation-046

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electrical

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Meeting room-045

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Store-044

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Corridor between business center & hard focus room

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Store-047

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Roastery-039

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Corridor between Roastery & washroom

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Male toilet-001 and disable toilet

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?

  • Are all cubicles doors in good condition in terms of hinges, alignment, accessories, scratches,…etc?

  • Are all mirrors and glass partitions in good condition?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Plumping

  • Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?

  • Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?

  • Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking

  • Are drain floor free of clogs, installed in good way and compatible with approved layouts?

Female toilet-001

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?

  • Are all cubicles doors in good condition in terms of hinges, alignment, accessories, assets labeling …etc?

  • Are all mirrors and glass partitions in good condition?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Plumping

  • Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?

  • Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?

  • Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking

  • Are drain floor free of clogs, installed in good way and compatible with approved layouts?

Pantry-001

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?

  • Are all cabinets doors in good condition in terms of hinges, alignment, accessories, scratches, assets labeling,..etc?

  • Are all mirrors and glass partitions in good condition?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Plumping

  • Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?

  • Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?

  • Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking

  • Are drain floor and sink trap free of clogs, installed in good way and compatible with approved layouts?

Unit head office -063

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Hard focus room-064

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Huddle room-065

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Soft focus room-040

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Huddle room-041

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Hard focus room-042

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Business center-048

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Long corridor between workstations area and closed rooms

Civil part

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Electrical room-504

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Open Workstation area-053

Civil part

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Phone booth-055

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Store-062

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Huddle room-054

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Soft focus-057

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Open workstation area-058

Civil part

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Phone booth-056

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Soft focus room -059

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Open workstation area-060

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Director office-062

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Majlis

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Area #2

Formal meeting room-031

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

The corridor between formal meeting room & waiter room

  • Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Waiter room -007

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Huddle room-006

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Director office-005

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Long corridor between & formal meeting room & IDF room

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Pantry next of store

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?

  • Are all cabinets doors in good condition in terms of hinges, alignment, accessories, scratches, assets labeling,..etc?

  • Are all mirrors and glass partitions in good condition?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Plumping

  • Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?

  • Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?

  • Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking

  • Are drain floor and sink trap free of clogs, installed in good way and compatible with approved layouts?

POD toilet

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?

  • Are all cubicles doors in good condition in terms of hinges, alignment, accessories, assets labeling …etc?

  • Are all mirrors and glass partitions in good condition?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Plumping

  • Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?

  • Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?

  • Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking

  • Are drain floor free of clogs, installed in good way and compatible with approved layouts?

Store-024

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Huddle room-023

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Corridor between huddled room & rejuvenation lounge

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Rejuvenation lounge-022

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Electrical cabinet-503

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Corridor between rejuvenation room & IDF room

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

IDF room-704

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Director office-020

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Open workstation area-008

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Archive room-004

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Store-003

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Unit head-002

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Phone booth-009

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Phone booth-010

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Director office-019

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Director office-018

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Director office-017

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Director office-016

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Female toilet

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?

  • Are all cubicles doors in good condition in terms of hinges, alignment, accessories, scratches,…etc?

  • Are all mirrors and glass partitions in good condition?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Plumping

  • Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?

  • Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?

  • Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking

  • Are drain floor free of clogs, installed in good way and compatible with approved layouts?

Male toilet

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Are wall and floor tiles in good condition in terms of cleaning, installation, pattern sequence, grouting, slop,…etc?

  • Are all cubicles doors in good condition in terms of hinges, alignment, accessories, scratches,…etc?

  • Are all mirrors and glass partitions in good condition?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Is the exhaust fan working functionally as per approved design and compatible with the approved layouts?

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Plumping

  • Is hand spray, WC full set in good condition in terms of functionality, free of scratches, assets labeling, cleaning,..etc?

  • Are all basins and counter free of scratches or crack, polished, cleaned, labeled, compatible with approved layout?

  • Are all mixtures and pipe fittings in good condition in terms of installation and free of leaking

  • Are drain floor free of clogs, installed in good way and compatible with approved layouts?

Huddle room-012

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Hard focus-011

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Phone booth-014

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Phone booth-015

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

Open workstation area at phon booth 014 & 015

Civil part

  • Are the entrance doors in good condition and labeled as agreed approach and compatible with approved layouts?

  • Is the carpet & tiles/ marble in good condition in terms of cleaning, installation, pattern sequence…etc?

  • Is the ceiling and gypsum , acoustic or glass walls partition in good condition in terms of leveling, painting, cleaning, finishing and installation?

  • Are there access panels on the ceiling for maintenance purposes?

  • Are shelfs, racks, cabinets…etc installed as designed and in goods condition?

  • Is the raised floor in good condition in terms of leveling, installation and finishing?

  • Are glass portions and acoustic wall labeled as per agreed approach and compatible with approved layouts?

  • Drag general photos in this suction.

HVAC

  • Are all FCUs labeled as per agreed approach and compatible with approved layouts in terms of its location and capacity?

  • Are all FCUs in good condition in terms of installation and functionality?

  • Are all supply and return grills cleaned, installed as per designed and compatible with approved layouts in terms of its locations

  • Are all FCU accessories such as actuators, DRV, bypass valve, strainer..etc existed and in good condition?

  • Are all chilled water lines and duct insulated properly and free from any fungus

  • Are all VAV’s are brand new and working functionally?

  • Are all thermostats/ touch screen are brand new and working functionally ?

  • Are all thermostats, VAV’s, chilled water pipelines and ducts compatible with the approved layouts and labeled as per agreed approach?

  • Are all HVAC system interfacing with BMS? If yes, is it working functionally?

  • Drag general photos in this suction

Electric

  • Are all floor boxes in good condition?

  • Are all floor boxes labeled and located as per agreed approach and compatible with approved layouts?

  • Are all lights working functionally?

  • Did all illuminations locate as per design and compatible with approved layouts?

  • Are all lights switch/ screen control is working properly and labeled as per agreed approach?

  • Are all lighting interfacing with BMS? If yes, it working functionally?

  • Drag general photos in this suction

FLS

  • Are all FA detectors in good condition and interfacing with main FACP?

  • Did all FA detectors installed as per approved layouts?

  • Are all FA detectors cleaned and blinking?

  • Did all sprinklers in good condition?

  • Did all sprinklers installed as per approved layouts?

  • Are all FF pipelines and the connections free of leakage and in good condition?

  • Did all FLS assets labeled as per agreed approach?

  • Is zone control valve energized and in good condition?

  • Drag general photos in this suction

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.