Information
-
Product Audit - Clearing & Grubbing (Hazel Bros)
-
Document No.
-
Observer
- NJB
- CIT
- GAO
- SHM
- BJP
- LCD
- BSR
-
Conducted on
Chainage
-
General information:
-
Which line?
- Floods Creek
- Isis
- Main Line 1
- Woodbury
- Main Line 2
- Kitty's
- Mount Seymour
- Main Line 3
- Main Line 4
- Jordan River Spur
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Chainage to: Chainage from:
-
Easting
-
Northing
Safety
-
Is there a JSEA on-site?
-
Is safety signage been displayed?
-
Are identified hazardous trees been managed?
-
Is minimum on-site safety standards been maintained e.g. (PPE, flashing beacon, reverse parking)
Pre-start requirements
-
If required, has the clearing contractor had a pre-start FPP briefing be an FPO?
-
Has the pipeline construction corridor been marked on ground and maintained?
-
Have all Machinery Exclusion (NO GO) Zones been flagged and maintained.
-
Add media
-
Have all identified weeds been managed in accordance with the contractors Weed Management Plan?
Landowner Access Agreement
-
Have property / land tenure boundaries been identified and marked?
-
If required or stipulated, has clearing and grubbing activity been conducted as per landowner access agreement?
Clearing and grubbing activity
-
Is the pipeline clearing corridor width a maximum of 25m and within the projects design corridor?
-
Has the pipeline clearing corridor been routed as far as practical away from the edge of any exclusion zone?
-
Has cleared vegetation been stacked a minimum of 6m away from all exclusion zones and Wildlife Habitat Trees?
-
If required, are designated lay down area or landings been cleared and managed as per FPP?
-
Has clearing and grubbing been minimised, as far as practicable, at watercourse crossing?
-
Add media
-
Has cleared vegetation been stockpiled in a manner that facilitates the respreading or salvage of timber?
-
Add media
Fire Prevention
-
Does clearing and grubbing complying with the contractors Fire Management Plan?
-
If required, is there fire fighting equipment on-site as per an approved FPP?
-
Add media
-
If required, is the clearing contractor doing daily fire weather observation and recording?
-
Add media
-
General observations:
Weed Management
-
Has all equipment entering the work site been inducted and certified as weed free?
-
Is the contractor using a designated wash down station to clean machines entering / leaving the works site?
Notes
Sketches
-
Add drawing
Photos
-
Add media
Sign Off
-
Add signature