  • Product Audit - Road & Stream Crossing (Fulton Hogan)

  • Document No.

  • Observer

  • Conducted on

Chainage

  • General information:

  • Chainage to: Chainage from:

  • Easting

  • Northing

Safety

  • Is there a JSEA on-site?

  • Is safety signage been displayed?

  • Are identified hazardous trees been managed?

  • Is minimum on-site safety standards been maintained e.g. (PPE, flashing beacon, reverse parking)

Pre start

  • If required, has the road construction contractor had a Pre-Start FPP briefing by an FPO?

Road Construction Activity

  • Is the road construction corridor clearing a maximum of 20m wide and within the projects design corridor?

  • Has the road construction centre line been flagged on the ground?

  • Has the road construction clearing corridor been routed as far as practical away from the edge of any exclusion zone?

  • Has cleared vegetation been stacked a minimum of 6m away from all exclusion zones and Wildlife Habitat Trees?

  • Is clearing vegetation and stripping topsoil clear of structural earth works?

  • Add media

  • Has clearing vegetation been stockpiled in manner that facilitates any future rehabilitation or timber salvage operation?

  • Are cut batters stable and have acceptable slope?

  • Add media

  • Have table drains been constructed?

  • Add media

  • Is culvert size and spacing in accordance with an approved FPP or minimum standards as per FPC?

  • Have silt traps been constructed where necessary?

  • Add media

  • If required, is the gravel material quality adequate to meet traffic / cartage volume needs?

Stream Crossing Activity

  • Is the disturbance limits within a riparian zone, been minimised and managed as per an approved FPP or in accordance with the contractors CEP or EMP?

  • Add media

  • Has the watercourse crossing been constructed in a manner that minimises sediment release?

  • Add media

  • Has a culvert been installed at the watercourse crossing which allows running water free access through the crossing?

  • Add media

  • Has road drainage been diverted within 20m of stream crossings or as specified in an approved FPP?

  • Add media

  • Has clearing vegetation been stockpiled as far as practicable away from the riparian watercourse zone or as specified within an FPP, CEP or EMP?

  • Area streams clear of turbidity and sediment?

  • Add media

Fire Prevention

  • If required, is there fire fighting equipment on-site as per an approved FPP?

  • Add media

  • If required, is the clearing contractor doing daily fire weather observation and recording?

  • Add media

  • General observations:

Weed Management

  • Has all construction machinery been inspected to confirm they are weed free?

Notes

Sketches

  • Add drawing

Photos

  • Add media

Sign Off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.