Product Audit - Road & Stream Crossing (Hazel Bros)
-
Document No.
-
Observer
- NJB
- CIT
- GAO
- SHM
- BJP
- LCD
- BSR
-
Conducted on
Chainage
-
General information:
-
Which line?
- Floods Creek
- Isis
- Main Line 1
- Woodbury
- Main Line 2
- Kitty's
- Mount Seymour
- Main Line 3
- Main Line 4
- Jordan River Spur
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Chainage to: Chainage from:
-
Easting
-
Northing
Safety
-
Is there a JSEA on-site?
-
Is safety signage been displayed?
-
Are identified hazardous trees been managed?
-
Is minimum on-site safety standards been maintained e.g. (PPE, flashing beacon, reverse parking)
Pre start
-
If required, has the road construction contractor had a Pre-Start FPP briefing by an FPO?
Road Construction Activity
-
Is the road construction corridor clearing a maximum of 20m wide and within the projects design corridor?
-
Has the road construction centre line been flagged on the ground?
-
Has the road construction clearing corridor been routed as far as practical away from the edge of any exclusion zone?
-
Has cleared vegetation been stacked a minimum of 6m away from all exclusion zones and Wildlife Habitat Trees?
-
Is clearing vegetation and stripping topsoil clear of structural earth works?
-
Add media
-
Has clearing vegetation been stockpiled in manner that facilitates any future rehabilitation or timber salvage operation?
-
Are cut batters stable and have acceptable slope?
-
Add media
-
Have table drains been constructed?
-
Add media
-
Is culvert size and spacing in accordance with an approved FPP or minimum standards as per FPC?
-
Have silt traps been constructed where necessary?
-
Add media
-
If required, is the gravel material quality adequate to meet traffic / cartage volume needs?
Stream Crossing Activity
-
Is the disturbance limits within a riparian zone, been minimised and managed as per an approved FPP or in accordance with the contractors CEP or EMP?
-
Add media
-
Has the watercourse crossing been constructed in a manner that minimises sediment release?
-
Add media
-
Has a culvert been installed at the watercourse crossing which allows running water free access through the crossing?
-
Add media
-
Has road drainage been diverted within 20m of stream crossings or as specified in an approved FPP?
-
Add media
-
Has clearing vegetation been stockpiled as far as practicable away from the riparian watercourse zone or as specified within an FPP, CEP or EMP?
-
Area streams clear of turbidity and sediment?
-
Add media
Fire Prevention
-
If required, is there fire fighting equipment on-site as per an approved FPP?
-
Add media
-
If required, is the clearing contractor doing daily fire weather observation and recording?
-
Add media
-
General observations:
Weed Management
-
Has all construction machinery been inspected to confirm they are weed free?
Notes
Sketches
-
Add drawing
Photos
-
Add media
Sign Off
-