General information:
-
Which line?
- Floods Creek
- Isis
- Main Line 1
- Woodbury
- Main Line 2
- Kitty's
- Mount Seymour
- Main Line 3
- Main Line 4
- Jordan River Spur
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Exact chainage known?
-
Chainage to: Chainage from:
-
Easting
-
Northing
Safety
-
Is there a JSEA on-site?
-
Is minimum on-site safety standards been maintained e.g. (PPE, flashing beacon, reverse parking)
General
-
Confirm welding operator is suitably qualified
-
Name of Welder
-
If applicable what is the weld number being assessed?
-
Is the welder maintaining weld records on a daily basis?
-
Add media
Pipe quality
-
What is the pipe diameter being installed?
- 450mm
- 800mm
- 1000mm
-
Is the PN rating being installed correct for the specified chainage?
-
What should the correct PN rating be?
-
Is pipe quality acceptable
-
Are the pipes clear of damages
-
Is the pipe damage greater than 10 % of the wall thickness?
-
Add media
Pipe Clamping
-
Are pipe weld clamps fully engaged?
-
Are pipes fully engaged?
-
Does the pipe wall thickness match?
Pipe cleaning
-
Has the pipe been cleaned and planed?
-
Have all scratches being removed from the weld surface?
-
Have all potential surface contaminants been cleaned / wiped off the pipes prior to welding?
-
Has the inside of pipe been checked for debris / foreign material and removed?
Pipe alignment
-
Has the pipe correctly aligned?
-
Are the alignment of weld surfaces acceptable?
Calculation
-
Does pipe weld calculation meet PIPA. PD - 003?
-
Is data input being done accurately?
-
Is pipe weld calculations being performed accurately?
Bead up
-
Has an external bead formed?
Heat Soak
-
Has heat being applied for the full required time?
Surface matching
-
Has the heat plate been removed quickly and cleanly?
-
Have heated surfaces being matched immediately?
-
Has the correct matching pressure being attained
-
Actual pressure attained
Cool down
-
Time cooling commenced
-
Time cooling completed
-
Was pressure maintained during cooling down period?
Waste removal
-
Have off-cuts being removed from inside pipe prior to welding?
-
Have all off cuts being collected and contained for proper disposal?
Visual inspection
-
Add media
-
Has the welder inspected the pipe condition and checked the pipe tolerances prior to welding?
-
Does the completed weld appear to be aligned and good quality?
-
Have welded ends been covered at the end of each shift?
-
Has the weld number being stamped and painted with yellow paint?
Notes
Sketches
-
Add drawing
Photos
-
Add media
Sign Off
-
Add signature