Information
-
ITP N248-003:
-
Title (included location of footing)
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Pre-Pour Inspection
-
Position of footing is correct to drawings and survey set out
-
Waterproofing has been applied
-
Reinforcement has been drilled, epoxied and tied correctly
-
Correct concrete cover for reinforcement is achieved (40mm Top Cover. 70mm for External Edges)
-
Formwork has been secured sufficiently
-
Correct concrete placement level has been identified on Formwork
-
Pour area is clean and free from foreign material
-
Approved For Pour
Post - Pour Inspection
-
Concrete placed and compacted correctly
-
Finish levels and locations correct
-
All Formwork has been stripped and bundled correctly
-
Footing free from NCRs (if no please provide details of NCR and NCR form to be filled out)
-
Finish Product Approved