Information

  • ITP N248-003:

  • Title (included location of footing)

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Pre-Pour Inspection

  • Position of footing is correct to drawings and survey set out

  • Waterproofing has been applied

  • Reinforcement has been drilled, epoxied and tied correctly

  • Correct concrete cover for reinforcement is achieved (40mm Top Cover. 70mm for External Edges)

  • Formwork has been secured sufficiently

  • Correct concrete placement level has been identified on Formwork

  • Pour area is clean and free from foreign material

  • Approved For Pour

Post - Pour Inspection

  • Concrete placed and compacted correctly

  • Finish levels and locations correct

  • All Formwork has been stripped and bundled correctly

  • Footing free from NCRs (if no please provide details of NCR and NCR form to be filled out)

  • Finish Product Approved

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.