Information
-
Fill out this Daily Pre-Start & Toolbox Form every morning.
Have all the workers sign it after you have conducted your toolbox talk and all the workers are aware of all activities for the day.
Once completed, email it to safety@nauticalroofing.com.au and to the builder and/or on site safety adviser. -
Project Name and/or Nautical Roofing Job Number
-
Site Address
-
Conducted on
-
Person Conducting Meeting
-
Document No.
Form
TODAY'S INFORMATION
-
Weather forecast
- Fine
- Showers
- Rain
- Windy
- Storm
- Severe Storm
-
Work location / section:
-
List planned work activities for today:
- Battens
- Drilling Wire
- Wiring
- Gutter Brackets
- Gutters
- Downpipes
- Loading Roof
- Laying Roof
- Skylights
- Screwing Off
- Flashings
- Penetrations
- Oversealing
- Cleaning Up
- Removing Old Downpipes
- Wall Cladding
- Removing Old Flashings
- Removing Old Roof
- Removing Old Gutter
- Removing Old Wall Cladding
-
Specific work activities for today not listed above:
-
Any deliveries today?
-
Time of delivery?
-
What type?
- Battens
- Flashings
- Fixings
- Gutters
- Sheets
- Wire
- Wool
GENERAL ITEMS / ACTIVITY CHECKLIST
-
Was the previous day's activities issue free?
-
Were the issues rectified?
-
Is there a SWMS in place for all specific activities commencing today?
-
Has a JSA been filled out for the activity not covered SWMS?
-
Are all site specific permits filled out for today's activities? (Hot works, roof access, working at heights, etc)
-
Are all other trades/public notified of relevant activities in their area?
-
Are all exclusion zones and visual barriers erected and maintained? (High risk activities near public/public places need an exclusion zone)
-
Assessment of work area complete?
-
Work area safe to commence works?
-
Workers adequately trained to complete tasks?
-
EWPs, Fall Protection and Electrical gear inspected, up to date, and safe for use?
-
All workers have suitable gloves and PPE for all tasks?
-
Weather conditions appropriate for commencement of works?
-
All workers instructed in relation to today's work requirements?
-
All workers signed on to Pre-Start / Toolbox form?
TOOLBOX TALK
-
Topics to cover today (press "Select" to choose a few options):
- • Electrical Hazards - test & tag, extension cord safety
- • Evacuation Safety - procedures, assembly points
- • EWPs - awareness, log books, tickets, pre-starts, LOTO
- • Exclusion Zones/Visual Barriers - risks, controls, maintenance
- • Fall Protection Equipment - design, uses, risks, maintenance
- • Falling Objects - dangers, risks, controls, stats
- • Falls From Any Height - dangers, controls
- • Fire - flammable liquids, hot works permits, evacuation procedure
- • First Aid Awareness - positions of kits, contents
- • Manual Handling - team lifting, lifting techniques
- • Noise Limits - Hearing protection for power tools, hearing damage
- • Power Tools - correct use, risks, maintenance
- • PPE - Gloves, hats, glasses, sunscreen, boots
- • Working at Heights - 2m from live edge, visual barriers, fall protection
- • Working Near Power Lines - 3m exclusion for Low Voltage, EWPs and ladders near LV lines
- • Working Near/With Asbestos - identifying, procedures, risks
- • Working Near Public - risks, control methods, dangers
-
Other items:
ATTENDEES - Names and Signatures
-
To add a names and signatures click the "+" or "Add Attendee" button >>
Attendee
-
Name: