Fill out this Daily Pre-Start & Toolbox Form every morning.
Have all the workers sign it after you have conducted your toolbox talk and all the workers are aware of all activities for the day?
Once completed, email it to safety@nauticalroofing.com.au -
Job Number (Or Address)
-
Site Location
-
Conducted on
-
Person Conducting Meeting & Nominated Person In Charge (PIC)
Form
TODAY'S INFORMATION
-
COVID 19 - I acknowledge that I or any workers at work today do not identify themselves to have or have signs of cold or flu like symptoms and do not have any COVID symptoms described by QLD Health/Government. Workers have confirmed that they are not a close contact as defined by the Government. If anyone has any symptoms or are classified as a close contact they must be sent home immediately and notify the office. Where possible maintain social distancing, wash hands regularly, limit car pooling. Do any workers identify themselves with any COVID symptoms and are not a close contact?
-
Weather forecast
- Fine
- Showers
- Rain
- Windy
- Storm
- Severe Storm
-
Work location / section:
-
List planned work activities for today:
- Measaure & Inspect
- Removing Old Roof & Flashings
- Battens
- Laying Roof
- Gutters
- Downpipes
- Skylights
- Screwing Off
- Flashings
- Penetrations
- Oversealing
- Cleaning Up
- Removing Old Downpipes
- Wall Cladding
- Removing Old Gutter
- Removing Old Wall Cladding
-
Specific work activities for today not listed above:
-
Any deliveries today?
-
Time of delivery?
-
What type?
- Battens
- Flashings
- Fixings
- Gutters
- Sheets
- Wire
- Wool
GENERAL ITEMS / ACTIVITY CHECKLIST
-
Was the previous day's activities issue free?
-
Were the issues rectified?
-
Is there a SWMS in place for all specific activities commencing today?
-
Has a JSA been filled out for the activity not covered SWMS?
-
Assessment of work area complete?
-
Work area safe to commence works?
-
Are all working at heights and safety procedures in place to commence works?
-
Is edge protection or scaffold installed to all areas being worked on?
-
Has the supervisor been informed if any areas are missing/incomplete?
-
If the area without rail is under 3m and less than 26° - have the following items been assessed?
- Works in this area can be performed from platforms, mobile scaffolds
- Works will need to be performed from Fall Restraint - and the worker/s are trained in Working at Heights that will be completing the works
- Area has been assessed and fall zones are clear of clutter
-
Has the power been isolated and roof tested with voltage tester to confirm?
-
Why has the power not been isolated and what controls have been put in place?
-
Are all other trades/public notified of relevant activities in their area?
-
Are all exclusion zones and visual barriers erected and maintained? (High risk activities near public/public places need an exclusion zone)
-
Workers adequately trained to complete tasks?
-
EWPs, Fall Protection and Electrical gear inspected, up to date, and safe for use?
-
Do All workers have suitable PPE for all tasks ?
-
Weather conditions appropriate for commencement of works?
-
All workers instructed in relation to today's work requirements?
-
All workers signed on to Pre-Start / Toolbox form?
TOOLBOX TALK
-
Topics to cover today (press "Select" to choose a few options):
- • Electrical Hazards - test & tag, extension cord safety
- • Evacuation Safety - procedures, assembly points
- • EWPs - awareness, log books, tickets, pre-starts, LOTO
- • Exclusion Zones/Visual Barriers - risks, controls, maintenance
- • Fall Protection Equipment - design, uses, risks, maintenance
- • Falling Objects - dangers, risks, controls, stats
- • Falls From Any Height - dangers, controls
- • Fire - flammable liquids, hot works permits, evacuation procedure
- • First Aid Awareness - positions of kits, contents
- • Manual Handling - team lifting, lifting techniques
- • Noise Limits - Hearing protection for power tools, hearing damage
- • Power Tools - correct use, risks, maintenance
- • PPE - Gloves, hats, glasses, sunscreen, boots
- • Working at Heights - 2m from live edge, visual barriers, fall protection
- • Working Near Power Lines - 3m exclusion for Low Voltage, EWPs and ladders near LV lines
- • Working Near/With Asbestos - identifying, procedures, risks
- • Working Near Public - risks, control methods, dangers
-
Other items:
ATTENDEES - Names and Signatures
-
Attendee Acknowledgement:
NOTE: by signing below you agree to the following points:
I have read and understand this Daily JSEA and will work in accordance with this JSEA.
I will consult with the Supervisor / PIC if changes are required and assist in re-issuing this form if required.
I have been consulted on the specific safety and environmental requirements of the activity.
I understand that I am responsible for my own and fellow worker’s safety.
I am acknowledging that I am indeed fit for work and not affected by fatigue, alcohol or prescription or other drugs. I agree to abide by the advice provided by QLD Health/Australian Government in regards COVID 19 including but not limited to mask wearing, COVID 19 social distancing recommendations, reporting and not coming to work when sick or showing signs of Covid or being a close contact to a confirmed COVID case. -