Information
-
BRQ number:
-
Time and date of the Validation
-
Prepared by (your name)
-
Company Name
-
What is the End Users Address ?
Scope and Photos
On-Site
-
Multiport, SMP, TAP, DPU, Joint, located
-
Developers LIC present
-
Can we install a PCD to the Premises with a clear build Path
- Yes- Yes PCD can be installed and Pathway available
- No
-
Can we construct As Per Plan
-
Site Photos
-
Is a CRQ Required
- Yes - Service Effecting CRQ
- Yes - Non Service Effecting CRQ
- No
-
Is there a builders/Developers Plan
- Yes - Indicates Driveway and LEAD-In Location
- No - Get in touch with EU at time of Construction
- Yes - Does not indicate driveway location but shows LEAD-In location
Aerial Works
-
Is Aerial Works Permit Required
-
Is an EWP Required due to Tap distance from pole
Civils
-
Is LAAN Required
- No -Civils are 9m and Under and LAAN does not apply
- Yes- Civils are over 10m or over, LAAN applies
- Unidentified- Request LAAN as backup
-
Are Major Civils Required
- No
- Grundo
- Concrete Cut
- Bore
- Vac
- Open Cut
-
Is ACM Identified
-
Is Pit de-watering required
- Yes -De- Watering required, non asbestos
- Yes - De- Watering required, asbestos
- No
-
Is there 50m or more new build and/ or 4 new pits or pit upgrades required
- Yes - More than 50m of Civils required
- Yes - 4 or more pits to be installed
- No
-
Is a Dig Permit Required
Zero Harm
-
EPR ZONE
-
High Voltage
-
Gas
-
Other Hazards
-
TC Required
- Yes- Second site visit required
- No
-
Onsite Parking