Information
-
Customer
-
Store Number & Name
-
Conducted on
-
Location
-
Senior Install Engineer
-
Install Engineers
-
Training Shift
-
Trainee Engineers
-
Document No.
-
Proceed to next section >
Site Start
-
All NCR engineers signed into Store Visitor log and equipped with appropriate PPE
-
Store Plans/Drawings/Scope Of Work checked
-
Store Number & IP info checked
-
Store IP
-
Reason for Not Applicable/Not Available
-
Delivery Checked
-
Delivery checked at
-
All kit delivered as expected
-
Click "Add Part" to record each instance of missing kit/parts
Part
-
Part Description
-
Issue escalated to
-
Date/Time of escalation
-
Reason for delivery not checked/not applicable
-
Proceed to next section >
Work Details
-
What is the Scope of Works?
-
Click "ADD DEVICE/ITEM" to record details of each device/item of work being carried out as required.
*Please check job requirements for serial number capture - if in doubt, capture it*
DEVICE/ITEM
Scope Of EPOS/IMAC Work
-
Description/scope of work carried out on Device/Item
-
Area of Works/Location of Device/Item
Device/Item Details
-
Device Serial Number (if required)
-
Base Unit Serial Number (if required)
-
Display Serial Number (if required)
-
Receipt Printer Serial (if required)
-
Blaster Label Printer (If Required)
-
Endorsement Printer (if Required)
-
Lexmark Printer (If Required)
Network Details
-
Device IP Address (if required)
-
Gateway IP Address (if required)
Completion
-
Work Successfully Completed
-
Image of work completed
-
Reason for Work Not Successfully Completed
-
Comments
-
Have you De-Installed the Controller or 500 Till?
-
Controller or 500 Serial Number
-
Has the Controller been Labelled with Controller Label Supplied
-
Image of Controller Labelled.
-
Why was the Controller not De-Installed?
-
Have you Collected the iPad from the store Manager
-
Enter the Serial number for the iPad
-
Add Picture of iPad
-
Reason for no iPad collected
-
Work Successfully Completed
-
Reason for work not Successfully Completed
-
Click "ADD DEVICE/ITEM" to record details of each device/item of work being carried out as required.
*Please check job requirements for serial number capture - if in doubt, capture it* -
All work details checked and recorded correctly?
Site Sign Off
Senior Engineer Sign Off
-
Date/Time of Completion
-
By ticking the box, the Senior Install Engineer is confirming that all work and tests were completed as per NCR and Customer Requirements
-
Area of work upon completion
Customer Sign Off
-
Please enter any additional comments or notes here
-
The work was successfully completed and all items either work properly or have an acceptable plan to rectify any issues satisfactorily
-
Store Representative Position
-
Store Representative Name & Signature
-
Miscellaneous