Title Page

  • Site conducted

  • Quality Control Check Name

  • Conducted on

  • Location
  • Account used

  • Elevations

    0524-019-Newlife Apartments-IAUDITOR-combined2.jpg
  • Elevation

  • Floor Level

  • Section(s)

Carrier System

  • Are the correct anchor fixings being used for helping hand brackets

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Are the brackets fixed at the correct centres ?

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

Vertical & Horizontal Rails

  • Have the vertical been fixed with the correct fixed points and sliding points?

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Have the correct fixing been used to fix the rails to brackets

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Have the Horizontal rails been fixed correctly with the spacer guidrail?

Cavity Barriers

  • Have the vertical barrier brackets been fixed with correct spacings? 2 per unit at 600mm spacings. note 300mm in from each end

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Have the horizontal barrier brackets been fixed with correct spacings? 3no per cut length at 400mm spacings? •

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Are the barriers tightly abutted?

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Horizontal barrier - is the required air gap of 25 mm correct?

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Do all vertical barriers take precedence over horizontal barriers?

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

Insulation / Duoslab

  • Has the insulation been fixed correctly with 1 metal fixing & two polypropylene plates per board?

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Is the insulation installed tightly / are any gaps filled?

  • Please describe the nature of the issue

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

Completion

  • Are there any other notes relevant to this particular Elevation/Scaffold Level not covered by the previous questions?

  • Are there any other photos relevant to this particular Elevation/Scaffold Level not covered by the previous questions?

  • Sign below to confirm that questions above have been answered truthfully and with all relevant due diligence having been carried out. Please include the person's name.

  • Russell Roofing Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.