Elevations
-
Elevation
- West Elevation
- South Elevation
- North Elevation
- East Elevation
- South Internal
- South RTN
-
Floor Level
- Level 01
- Level 02
- Level 03
- Level 4
- Level 5
- Level 6
- Level 7
- Level 8
- Level 9
- Level 10
- Level 11
- Level 12
-
Section(s)
- Section 1
- Section 2
- Section 3
- Section 4
- Section 5
Carrier System
-
Are the correct anchor fixings being used for helping hand brackets
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Are the brackets fixed at the correct centres ?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
Vertical & Horizontal Rails
-
Have the vertical been fixed with the correct fixed points and sliding points?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Have the correct fixing been used to fix the rails to brackets
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Have the Horizontal rails been fixed correctly with the spacer guidrail?
Cavity Barriers
-
Have the vertical barrier brackets been fixed with correct spacings? 2 per unit at 600mm spacings. note 300mm in from each end
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Have the horizontal barrier brackets been fixed with correct spacings? 3no per cut length at 400mm spacings? •
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Are the barriers tightly abutted?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Horizontal barrier - is the required air gap of 25 mm correct?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Do all vertical barriers take precedence over horizontal barriers?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
Insulation / Duoslab
-
Has the insulation been fixed correctly with 1 metal fixing & two polypropylene plates per board?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Is the insulation installed tightly / are any gaps filled?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
Completion
-
Are there any other notes relevant to this particular Elevation/Scaffold Level not covered by the previous questions?
-
Are there any other photos relevant to this particular Elevation/Scaffold Level not covered by the previous questions?
-
Sign below to confirm that questions above have been answered truthfully and with all relevant due diligence having been carried out. Please include the person's name.
-
Russell Roofing Signature