Information
-
Audit Title
Prompt: Before commencing the SHES visit, please review the findings and actions from the last visit and note any that are not closed out
-
Project Name
-
Scheduled Month
-
Contractor
-
Visit Type
-
Visit Category
- Construction - Electricity Transmission
- Construction - Gas Transmission and ISS
- Electricity Transmission Asset Management
- ENCC
- Gas Distribution
- Gas Transmission Asset Management
- GNCCg
- Grain LNGS
- Metering
- Offices and Stores
-
Zone/Area
-
Site Address
-
Site Contact
-
Booked By
-
Brief Description of Work
-
Visit Completion Date
Key Risk Areas
Process Safety
-
Has process safety been discussed? Y/N
Please tick which areas have been discussed
-
Maintenance & Inspection
-
Modification Process
-
Fault & Defect Management
-
Work Control & Permits
-
Emergency Plans
-
Competency / Resources
-
Hazard Identification / HAZOP /HAZID
-
Monitoring & Audit
-
What process safety systems did you praise?
-
What process safety behaviour changes were agreed with the individuals?
-
What process safety systems were found to be inappropriate/substandard?
-
Process Safety Comments
Occupational Safety
-
Has occupational safety been discussed?
Please tick which areas have been discussed
-
Slips Trips & Falls
-
Healthy Working
-
Welfare Facilities
-
Working at Height
-
Use of Tools, Equipment & Machinery
-
Confined Spaces including Excavations
-
Manual Handling
-
Security
-
What unsafe/inappropriate behaviours were identified?
-
What SHES behaviours did you praise?
-
What behaviour changes were agreed with the individuals?
-
Occupational Safety Comments
Health & Wellbeing
-
Has health and wellbeing been discussed?
-
What Health & Wellbeing areas did you praise?
-
What areas of health and wellbeing were found to be inappropriate / substandard?
-
Health & Wellbeing Comments
Environmental Management
-
Has environmental management been discussed?
-
What are the main environmental risks for the project?
-
What environmental management areas did you praise?
-
What areas of environmental management were found to be inappropriate /substandard?
-
Environmental Management Comments
Sustainability
-
Has sustainability been discussed?
-
What designs or ways of working did you observe that would improve the sustainability of the construction phase, operation or end of life of this asset? Refer to Our Contribution targets: positive about resources, climate positive, enhancing Eco-systems. (Discussion prompt: Sustainable Options Appraisal Tool, SOAT )
-
What aspect of the construction phase has the most significant impact on the carbon footprint of the project? (Discussion prompt: Carbon Interface Tool, CIT results)
-
Sustainability Comments
Please select which sustainability communication materials are on display and any tools used
-
Hot Topics
-
Z-Cards
-
Tool Box Talks
-
Sustainability Posters
-
Training Presentations
-
Case Studies
-
Good Practice Handbook
-
Materials Exchange Tool
-
Podcasts
Improvement Actions
-
What improvement actions are outstanding?
-
What other improvement actions were taken on site?
-
Additional Notes/ Comments
-
What Health and Safety Triangle score have you given for the site visit?
- 2
- 1
- -1
- -2
- 0
-
What Environmental Triangle Score have you given for the site visit? Meets or exceeds expectations, good practices observed = +2 Generally meets expectations = +1 Average = 0 Some improvements required = -1 Significant improvements required -2
- 2
- 1
- -1
- -2
- 0
-
Please add any photos if applicable
-
Signature