Information

  • RID#:

  • Address of RID:

  • Conducted on

  • Prepared by

  • Was any DAMAGE found as the cause of the fault?

  • Submit a PDR. PDR MUST contain photo's proving the damage found and photo must be obtained of the vicinity in which fault was found.

  • PDR number:

  • What is the trouble/issue found onsite:

  • Where was the issue/fault:

  • Select region of location of the fault:

  • What was the cable depth?

  • Was the original install done to the correct height?

  • What was the height? Have you correct it?

  • What is the TFC (Trouble Found Code) for this fault:

  • What have you done to resolve/fix the fault:

  • Supply photos of evidence indicating fault or cause of fault:

  • Photos MUST be supplied to prove your claims if you state that fault was caused due to poor workmanship.

  • Have you completed TechMate

  • Submit a photo of the test

  • Submit photo of the error

  • Where 3rd party Services required?

  • EWP - Show a photo of its use on site

  • Reinstatement - Show photo of location required

  • TMP - Show photo of use on site

  • Ferry - Provide photo of Invoice

  • Other - What was it?

  • Submit a photo

  • Was the customer Service Given when you left site:

  • Is the job coded?

  • Input the code

  • Give a break down of your time on site in units(1 unit = 15min)

  • What non consigned Materials did you use - What was the cost

  • What fibre was used

  • What size and length

  • What size and length

  • What size and length

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.