1.0 - Previous inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there no outstanding actions?
2.0 - Fire Prevention
-
2.1 - Evacuation plan displayed and understood by all employees?
-
2.2 - Evacuation procedures and training regularly through FSA?
-
2.3 - Extinguishers in place, clearly marked for type of fire?
-
2.4 - Extinguishers recently serviced? (Check 6 monthly punch mark on tabs.)
-
2.5 - Extinguishers clear of obstructions?
-
2.6 - Extinguisher no more than 1200 mm max height & base not lower that 100 mm?
-
2.7 - Indicator signs 2.1 m above floor level?
-
2.8 - Adequate direction notices for fire exits?
-
2.9 - Exit doors easily opened from inside?
-
2.10 - Exits clear of obstructions?
-
2.11 - Fire alarm system functioning correctly?
-
2.12 - Are all fire hose reel cupboards from from rubbish and adequate signage displayed in doors?
-
2.13 - Is the sprinkler and hydrant pump room clean and in good order?
-
2.14 - Have all the hose reels been serviced in the last 6 months?
-
2.15 - Are there any damaged or missing fire penetrations?
-
2.16 - Are all fire doors free from damage and close properly?
3.0 - General Lighting
-
3.1 - Good natural lighting?
-
3.2 - All common area lighting in good order?
-
3.3 - Light fittings clean and in good condition?
-
3.4 - Emergency exit lighting operable?
4.0 - Building Safety
-
4.1 - Floor surfaces even and uncluttered?
-
4.2 - Entry and walkways kept clear?
-
4.3 - Walkways adequately and clearly marked?
-
4.4 - Intersections kept clear of boxes etc?
-
4.5 - Stair and risers kept clear?
-
4.6 - Are liquid spills removed quickly?
-
4.7 - Are railings in good condition?
-
4.8 - Are fall preventive measures in place and used where gaps occur in railings?
-
4.9 - Are footpaths in good condition?
-
4.10 - Furniture in sound condition?
-
4.11- Are all fire escape clearly marked?
-
4.12 - Is the base build security operating correctly?
5.0 - Building Exterior
-
5.1 - is the front of the building free of rubbish?
-
5.2 - Is there any graffiti on exterior walls or doors?
-
5.3 - is landscaping at rear and balcony level 5 maintained and in good condition?
-
5.4 - Is the glass canopy clean above the main entrance to the property?
-
5.5 - Is there appropriate smoking bins and signage in place?
-
5.6 - Are high level windows clean?
6.0 - Rubbish Removal
-
6.1 - Bins located at suitable points around site?
-
6.2 - Bins emptied regularly?
-
6.3 - Is there appropriate signage on display to ensure waste streams are placed in appropriate bins?
7.0 - Chemical Storage
-
7.1 - Materials stored in racks and bins wherever possible?
-
7.2 - Floors around racking clear of rubbish?
8.0 - Plant rooms
-
8.1 - Are they kept clean?
-
8.2 - Are the floors kept clean?
-
8.3 - Is the lighting in good working order?
-
8.4 - Starting and stopping devices within easy reach of operator?
-
8.5 - Waste/off cuts removed and stored safely?
-
8.6 - Drip trays on floor to prevent spillage?
-
8.7 - Adequate work space?
-
8.8 - Is lighting adequate?
-
8.9 - Is roof access controlled as per CBRE procedures?
-
8.10 - Are all plant rooms doors in good condition?
-
8.11 - Plant and equipment in good order?
-
8.12 - Warning and instruction signs displayed where necessary?
-
8.13 - What is the overall condition of the plant room (if not satisfactory provide comment)?
9.0 - Electrical Safety
-
9.1 - Are al the electrical risers lockable and secure?
-
9.2 - Have all the base build Safety switches been tested every 6 months and tests recorded?
-
9.3 - Has the base build portable equipment been tested and tagged?
-
9.4 - No broken plugs, sockets or switches?
-
9.5 - No power leads across walkways?
-
9.6 - No frayed or damaged leads?
-
9.7 - Where required are emergency shut-down procedures in place?
10.0 - Chemical Safety
-
10.1 - Hazardous Substance Register complete and available?
-
10.2 - Material Safety Data Sheets available for all chemicals?
-
10.3 - Risk assessments completed for hazardous substances?
-
10.4 - All containers labelled correctly?
-
10.5 - Unused substances disposed of?
-
10.6 - Do special storage conditions apply?
-
10.7 - If applicable are special storage conditions followed?
-
10.8 - Workers trained in the use of hazardous substances?
-
10.9 - If required is PPE available?
-
10.10 - Is adequate ventilation provided?
-
10.11 - Are eye washes and showers easily accessed?
11.0 Roof Access Ladder
-
11.1 - Are all ladders Industrial strength? (Non Household rated, check label.)
-
11.2 - Are ladders in good condition and comply with the current Australian Standard?
-
11.4 - Used according to instructions?
12.0 - First Aid Facilities
-
12.1 - Are cabinets and contents clean and orderly?
-
12.2 - Are contents regularly checked?
-
12.3 - No contents past their expiry date?
-
12.4 - Cabinets clearly labelled?
-
12.5 - Is there easy access to cabinets?
-
12.6 - Employees aware of location of first aid cabinet?
-
12.7 - Are first aid officers accessible?
-
12.8 - Are emergency numbers displayed?
13.0 - Generator
-
13.1 - Is the generator room clean?
-
13.2 - Is there any signs of oil or diesel leaks?
-
13.3 - Is the fire extinguisher in test date?
-
13.4 - Is a spill kit on site and adequately stocked?<br>
-
13.5 - is all site logs, procedures, signage up to date?
-
13.7 - Basement car park fuel tank - is there any signs of diesel leaks and is there appropriate signage on the door?
14.0 - Car Parks
-
14.1 - Is the line marking of bays and road markings in adequate condition?
-
14.2 - Is lighting adequate?
-
14.3 - Is car park ductwork in good condition?
-
14.4 - Is there any damage to the vision mirrors on the tops of the ramps?
-
14.5 - Is the roller shutter in good working order and free from damage?
-
14.6 - Is the concrete stops in good order?
-
14.7 - Is the storage areas clean, secure and tidy?
-
14.8 - Are the lift entrances clean and tidy?
-
14.9 - Are all the sumps operating correctly?
-
14.10 - Are fire escapes from underground ground adequately light and in good condition?
15 - Cleaning
-
15.1 - Are all toilets adequately stocked?
-
15.2 - Entry mats clean and in good order?
-
15.3 - Is the front entry glass doors clean and free from smears and finger marks?
-
15.4 - Are the lift interiors clean and free from rubbish?
-
15.5 - Is all fire stairs free from rubbish and clean?
-
15.6 - Tiled floors scrubbed and polished as required?
-
15.7 - Are the mirrors in all toilets clean and free from smears?
-
15.8 - Is the front entrance free from rubbish and the smoking bans emptied?
-
15.9 - Is the refuse area clean?
-
15.10 - Have all the lift lobby carpets been vacuumed?
-
15.11 - Are common area tea points clean and free from rubbish?
-
15.6 - Are the basement showers clean and free from rubbish?
16 - General overall conditions
-
16.1 - Are there any other areas / equipment that requires attention / repair?
17 - Pest Control
-
17.1 - Is current specification adequate for the site?
-
17.2 - Are the current level of rat boxes adequate for the site?
-
17.3 - Is there any signs of pest activity?
18 - Electrical and Comms Riser cupboards?
-
18.1 - Are the risers secure and keys easily accessible?
-
18.2 - Is there suitable signage placed upon the riser doors and switch rooms?
19 - Items requiring quoting?
20 - Items to consider for Capital Works
21 - Signoff
-