Information
-
Job Number
-
Customer Name
-
Location
-
Date of Visit
-
Engineer name and Tech Code
-
Job Type
-
Post Visit Conducted on
-
Completed by:
-
Comments
ETA Procedure
-
Did the Engineer call with an ETA?
-
Was this in the morning or Night before visit?
-
Did the engineer arrive within agreed ETA
-
Updated ETA given - If Applicable
Customer Interaction
-
Did the Engineer introduce himself and show his Name Badge?
-
Uniform Worn - Was it Clean and Tidy?
-
Did the Engineer confirm the job details with you?
-
Did the Engineer show you the work that was going to be carried out?
-
Did the Engineer offer to show you completed work?
Service Only
-
Did the engineer discuss the Fault History with you
-
Has the fault now been rectified
-
Did the Engineer carry out a physical check on the dish
Dish and Cable Installation
-
Dish position and cable routing agreed with customer
-
Dish and Cable Installed to best practises<br><br>
-
Were any necessary escalations made<br>
-
Cable entry hole sealed and brick burst plate used
-
Internal bush used
On Demand
-
Was On Demand connected up and demonstrated?
-
If not was it explained how to connect and the advantages of having it connected?
Customer Demonstration
-
Demonstration completed to your satisfaction
-
RCU programmed to work the customer TV
-
Was an HD Customer Demonstration leaflet left on-site and explained
Job Closure
-
Did customer sign MFT Device?
-
Site left clean and tidy
-
Any customer issues outstanding
NPS / CSAT
Pictures of Visit
-
Picture of dish
-
Picture of eyebolt hole
-
Picture of sealed cable entry hole
-
Any other pictures