Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Task Hazard Analysis
-
Was a THA completed for all tasks being performed?
-
Add media
-
Was a new or revised THA completed if the job scope changed?
-
Have all known hazards in the work area been identified and listed on the THA?
-
Are the appropriate control measures in place and listed on the THA?
-
Have all employees signed the THA?
-
Does the contractor review the THA with all visitors to the job site?
Mechanical Equipment
-
Have pre-use inspections been completed for all equipment in use at the site?
-
Is the equipment in satisfactory condition?
-
Do operators have current training in the operation of their equipment?
-
Is there a fire extinguisher present on the equipment and readily available?
-
Has the equipment been properly grounded?
-
Is there a backup alarm or is a spotter being utilized for backing equipment?
-
Are outrigger pads being used on all lifting equipment including cranes and buckets?
Housekeeping
-
Has the contractor addressed all housekeeping issues on the job site?
-
Are flammable liquids stored in approved containers or tanks?
Communications
-
Is a complete Emergency Action Plan documented and on site?
-
Has the plan been reviewed with all employees?
-
Are there at least 2 CPR/First Aid trained per crew?
-
Are adequate first aid supplies available?
-
Are MSDS's readily available?
-
Is a copy of the company safety manual on site?
Hand Tools
-
Are all electrical tools in good working condition?
-
All guards in place?
-
All cords in good condition?
-
Double insulated or properly grounded?
-
Plugged into a GFCI?
-
Are all ladders in good working order?<br>
Personal Protective Equipment
-
Are all employees wearing at minimum a hard hat, ANSI approved safety glasses w/sideshields, safety toed boots, and a highly visible top?
-
Are employees wearing work gloves appropriate for the hazard?
-
Are all employees wearing 100% fall protection when required?
-
Is PPE in good condition?
-
Are test dates on rubber goods current?
-
Are test dates on hot sticks current?
-
Is all PPE being stored properly to prevent damage?
Work performed under an operating order
-
Do the foreman and crew know who holds the clearance, non-reclose order or hold order for the facilities being worked?
-
Do the foreman and crew know and understand clearance points?
Working on or Near Energized Equipment
-
Are all employees maintaining appropriate approach distances?
-
Are all energized facilities covered or guarded to prevent contact?
-
Has the foreman been advised of equipment under an NRO?
-
Has the contractor logged in with dispatch?
Work Zone Protection
-
Are the workers properly protected from vehicle traffic?
-
Have all permits been obtained for any public road crossings?
-
Been guarded?
-
Have all hotline crossings been properly guarded?
-
Have utilities been located and marked if any digging or excavating activities are being performed?
Grounding
-
Have all lines and equipment been de-energized, tested, and grounded when required?
-
Have all sources of energy been considered including induced voltage?
OSHA Training
-
Has supervisors completed OSHA 30 hour training?
-
Have all employees completed OSHA 10 hour training?
Rigging
-
Is all rigging equipment in satisfactory condition?
-
Is the rigging being protected from sharp edges?
-
Add media
-
Foreman
-
Safety
-
Supervisor