Title Page

  • Site Address
  • Document No.

  • Conducted on

  • Prepared by

General Site Conditions

  • Is site signage visible & all details completed?

  • Are identified site specific hazards mentioned on the site sign e.g.: overhead power lines, gas lines, open trenches etc?

  • If required, is a cross over appropriately installed and maintained? (no dirt or sand underneath)

  • Are the driveways, footpaths, and nature strips clear of waste and materials?

  • Are roadways free of mud and dirt from our contractor's vehicles?

  • Has all rubbish been placed in the bin provided?

  • Does the bin require emptying?

  • Clear access to front door, meter box & bin?

  • Are there any trip hazards on site outside of normal site conditions?

  • Perimeter fencing complete and in place, open gates secured and not blocking the footpath?

  • Is the meter box RCD test up to date?

  • Is the toilet clean, accessible and in correct operating condition with toilet paper?

  • Is there scaffold on site?

Scaffold Inspection

  • Does the scaffold look to be in good condition?

  • Is the scaftag present and signed off?

  • Are scaffold decks tidy, without waste or materials?

  • Have there been any unauthorised alterations?

  • Are there Contractors on site?

Contractor Compliance

  • Select the type of works being carried out

Bricklayer

  • Contractor Business Name

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Are ladders in good condition and suitable for purpose, no one is standing on the top tread?

  • Do all tools and equipment have appropriate guarding and are in good condition?

  • Are trestles fully planked, less than 2m in height, have solid stable footings, safe access/egress and a clear fall zone, correct locking pins?

  • If working on second storey has a site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?

  • Are any works being carried out under areas with persons working at height?

Ceramic Tiler

  • Contractor Business Name

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Do all tools and equipment have appropriate guarding and are in good condition?

Concreting

  • Contractor Business Name

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Do all tools and equipment have appropriate guarding and are in good condition?

  • Is a concrete pump on site?

Concrete Pump

  • Pump Company Name

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Has the operator completed a Site Specific SWMS that has been signed by all workers involved with the pour?

  • Does the operator have a Certificate of Competency (class PB)?

  • Have daily and monthly plant checks been completed?

  • Has a pipeline crack test been completed in the last 12 months?

  • Is the pipleine log book current?

Framer

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Are ladders in good condition and suitable for purpose, no one is standing on the top tread?

  • Do all tools and equipment have appropriate guarding and are in good condition?

  • Are Framers working above 2 metres?

Height Safety

  • Site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?

  • Is first floor edge protection in place?

  • Framers installing roof trusses are keeping 1.5 metre back from external top plates

  • Trusses are being fixed to external walls from ladders or trestles?

  • First floor wall openings have temporary baricades in place?

  • Void protection is in place and hatch is closed?

  • Are any works being carried out under areas with persons working at height?

Lock up/Fix

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Are ladders in good condition and suitable for purpose, no one is standing on the top tread?

  • Do all tools and equipment have appropriate guarding and are in good condition?

Mobile Plant

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Does the operator have a valid license for the equipment being used?

  • Has a site specific Safe Work Method Statement been completed for the use of mobile plant?

  • Has the plant operator completed a prestart check on his/her equipment?

  • Are reverse beepers and flashing lights operational?

  • Open pier holes that are left unattended have covers preventing entry and are identified on builders site sign?

  • Excavations deeper than 1.5m are benched or shored

  • Soil pile located minimum 1m from edge of a trench?

Paint, Plaster, Render

  • Has a Pre-start Checklist been completed?

  • Have painters/renderers on site completed the Nostra Homes induction?

  • Have plasterers on site completed the plaster supplier's induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Are ladders in good condition and suitable for purpose, no one is standing on the top tread?

  • Do all tools and equipment have appropriate guarding and are in good condition?

  • Are trestles fully planked, less than 2m in height, have solid stable footings, safe access/egress and a clear fall zone, correct locking pins?

  • If working externally on second storey has a site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?

  • First floor wall openings have temporary barricades in place?

  • Void protection is in place and hatch is closed?

Roof Works

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Do all tools and equipment have appropriate guarding and are in good condition?

  • Site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?

  • Roof access is appropriate and safe?

  • Roof edge protection is in place?

  • If no roof edge protection in place are harnesses being used?

  • Void protection is in place and hatch is closed?

  • Are any works being carried out under areas with persons working at height?

  • Is there a specified drop zone for roof tiler spoils?

Low Risk Suppliers

  • Use this section for any allocated supplier that isn't carrying out High risk works such as; plumbing and electrical rough ins and fit offs, insulation, waterproofing, cabinetry, etc.

  • Contractor Business Name

  • Has a Pre-start Checklist been completed?

  • Have all workers on site completed the Nostra Homes induction?

  • Do all workers have evidence of holding a Construction Induction Card?

  • Does the contractor have a Safe Work Procedure and are they operating in accordance with it?

  • Are all workers using appropriate PPE where required?

  • Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?

  • Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?

  • Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?

  • Are RCD protected portable power outlets being used? (no domestic powerboards)

  • Are RCD protected portable power outlets being being tested monthly as per the industry standard?

  • Are ladders in good condition and suitable for purpose, no one is standing on the top tread?

  • Do all tools and equipment have appropriate guarding and are in good condition?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.