Title Page
-
Site Address
-
Document No.
-
Conducted on
-
Prepared by
General Site Conditions
-
Is site signage visible & all details completed?
-
Are identified site specific hazards mentioned on the site sign e.g.: overhead power lines, gas lines, open trenches etc?
-
If required, is a cross over appropriately installed and maintained? (no dirt or sand underneath)
-
Are the driveways, footpaths, and nature strips clear of waste and materials?
-
Are roadways free of mud and dirt from our contractor's vehicles?
-
Has all rubbish been placed in the bin provided?
-
Does the bin require emptying?
-
Clear access to front door, meter box & bin?
-
Are there any trip hazards on site outside of normal site conditions?
-
Perimeter fencing complete and in place, open gates secured and not blocking the footpath?
-
Is the meter box RCD test up to date?
-
Is the toilet clean, accessible and in correct operating condition with toilet paper?
-
Is there scaffold on site?
Scaffold Inspection
-
Does the scaffold look to be in good condition?
-
Is the scaftag present and signed off?
-
Are scaffold decks tidy, without waste or materials?
-
Have there been any unauthorised alterations?
-
Are there Contractors on site?
Contractor Compliance
-
Select the type of works being carried out
- Bricklaying
- Ceramic Tiling
- Concreting
- Framing
- Lock up/Fix
- Mobile Plant
- Paint, Plaster, Render
- Roof Works, inc. Fascia/Gutter
- Low Risk Suppliers
Bricklayer
-
Contractor Business Name
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Are ladders in good condition and suitable for purpose, no one is standing on the top tread?
-
Do all tools and equipment have appropriate guarding and are in good condition?
-
Are trestles fully planked, less than 2m in height, have solid stable footings, safe access/egress and a clear fall zone, correct locking pins?
-
If working on second storey has a site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?
-
Are any works being carried out under areas with persons working at height?
Ceramic Tiler
-
Contractor Business Name
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Do all tools and equipment have appropriate guarding and are in good condition?
Concreting
-
Contractor Business Name
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Do all tools and equipment have appropriate guarding and are in good condition?
-
Is a concrete pump on site?
Concrete Pump
-
Pump Company Name
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Has the operator completed a Site Specific SWMS that has been signed by all workers involved with the pour?
-
Does the operator have a Certificate of Competency (class PB)?
-
Have daily and monthly plant checks been completed?
-
Has a pipeline crack test been completed in the last 12 months?
-
Is the pipleine log book current?
Framer
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Are ladders in good condition and suitable for purpose, no one is standing on the top tread?
-
Do all tools and equipment have appropriate guarding and are in good condition?
-
Are Framers working above 2 metres?
Height Safety
-
Site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?
-
Is first floor edge protection in place?
-
Framers installing roof trusses are keeping 1.5 metre back from external top plates
-
Trusses are being fixed to external walls from ladders or trestles?
-
First floor wall openings have temporary baricades in place?
-
Void protection is in place and hatch is closed?
-
Are any works being carried out under areas with persons working at height?
Lock up/Fix
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Are ladders in good condition and suitable for purpose, no one is standing on the top tread?
-
Do all tools and equipment have appropriate guarding and are in good condition?
Mobile Plant
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Does the operator have a valid license for the equipment being used?
-
Has a site specific Safe Work Method Statement been completed for the use of mobile plant?
-
Has the plant operator completed a prestart check on his/her equipment?
-
Are reverse beepers and flashing lights operational?
-
Open pier holes that are left unattended have covers preventing entry and are identified on builders site sign?
-
Excavations deeper than 1.5m are benched or shored
-
Soil pile located minimum 1m from edge of a trench?
Paint, Plaster, Render
-
Has a Pre-start Checklist been completed?
-
Have painters/renderers on site completed the Nostra Homes induction?
-
Have plasterers on site completed the plaster supplier's induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Are ladders in good condition and suitable for purpose, no one is standing on the top tread?
-
Do all tools and equipment have appropriate guarding and are in good condition?
-
Are trestles fully planked, less than 2m in height, have solid stable footings, safe access/egress and a clear fall zone, correct locking pins?
-
If working externally on second storey has a site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?
-
First floor wall openings have temporary barricades in place?
-
Void protection is in place and hatch is closed?
Roof Works
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Do all tools and equipment have appropriate guarding and are in good condition?
-
Site specific Safe Work Method Statement for working at heights has been completed properly and is available to view?
-
Roof access is appropriate and safe?
-
Roof edge protection is in place?
-
If no roof edge protection in place are harnesses being used?
-
Void protection is in place and hatch is closed?
-
Are any works being carried out under areas with persons working at height?
-
Is there a specified drop zone for roof tiler spoils?
Low Risk Suppliers
-
Use this section for any allocated supplier that isn't carrying out High risk works such as; plumbing and electrical rough ins and fit offs, insulation, waterproofing, cabinetry, etc.
-
Contractor Business Name
-
Has a Pre-start Checklist been completed?
-
Have all workers on site completed the Nostra Homes induction?
-
Do all workers have evidence of holding a Construction Induction Card?
-
Does the contractor have a Safe Work Procedure and are they operating in accordance with it?
-
Are all workers using appropriate PPE where required?
-
Are all electrical lead, power tool and equipment test tags in date (all tests must be carried out every 3 months)?
-
Are any leads doubled up or 'piggy-backed' and run less than 35 metres from the power source?
-
Are leads raised off the ground where required (not creating trip hazards or running through water/mud)?
-
Are RCD protected portable power outlets being used? (no domestic powerboards)
-
Are RCD protected portable power outlets being being tested monthly as per the industry standard?
-
Are ladders in good condition and suitable for purpose, no one is standing on the top tread?
-
Do all tools and equipment have appropriate guarding and are in good condition?