Title Page

  • Conducted on

  • Prepared by

  • Location

Exterior

  • Exterior Signage - Installed & functioning

  • Exterior Lighting - Installed & functioning

  • Landscaping/Hardscaping - complete<br>

  • Parking Lot - Complete & striped

  • Dumpster / Recycle Service - in place & scheduled

Lobby/Bar

  • HVAC / Exhaust - working properly

  • Wall Coverings - installed

  • Finished Floor - fully sealed

  • Beer taps/Bar Equipment - Draft / FOB / Glycol system fully functioning

  • Bar top - installed & fully sealed

  • Ceiling tiles - installed

  • Coke - CO2, Bar guns and soda tower all functioning properly

  • Refrigeration working

  • Lighting - installed and functioning<br>

  • Bar signage - installed

  • Tables and Chairs on site

  • AV Systems & music - installed and functioning

Gallery

  • Wall coverings - installed

  • Floor Carpet/Tile - installed <br>

  • Ceiling fully - installed

  • Lighting - installed

  • Interior Signage - i.e. Auditorium Numbers, Restroom and Directional, Occupancy Signs

Auditoriums

  • Seating - Installed (including power to chairs)

  • Tabletops (Lighting, Menu holders, Table numbers) - All table #’s verified with online map (including ADA/Companion spots)

  • Auditorium Lighting installed and functional

  • Screens - installed & QC’d

  • Image configuration - complete<br>

  • Masking - installed

  • Port Windows - installed

  • Drapes - installed

  • Speakers - installed

  • Wall Carpet - installed

  • Floor Finishes - fully sealed

  • Aisle Lighting - installed and functioning

  • Trim Caps - installed

  • Acoustical Ceilings - installed <br>

  • Exit/Entry Doors - Closers installed, Sealed and Quiet

  • CC/ALD - Installed & QC’d

  • Removable ADA seats - in house

Server Stations

  • FRP/ wall carpet - installed

  • Stainless Countertops - installed

  • Heat Lamps - installed & functioning

  • Lighting - installed

  • Floor Finishes - complete

Mezzanine – Projection

  • Theater Management System - online and fully operational

  • Projectors - online, Picture and Sound checked

  • Projectors - fully operational

  • Projector configuration - complete

  • Server - fully operational

  • Server configuration - complete

  • 3D equipment - operational

  • Sound rack - wiring complete

  • Booth clean and organized

  • TMS Server room/area clean and organized

  • Full playlist run on each machine and all cueing confirmed - light and door cues

Restrooms

  • Fixtures/Partitions/Countertops all 100%

  • Water temperature compliant with code requirements

  • TP/Paper Towels/Soap 100%

Operations

  • Staffing levels achieved by 90%

City Requirements

  • Building inspection sign-off

  • Health inspection sign-off

  • Fire inspection sign-off

  • Liquor license procured

  • Certificate of Occupancy

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.