Title Page
-
Conducted on
-
Prepared by
-
Location
Exterior
-
Exterior Signage - Installed & functioning
-
Exterior Lighting - Installed & functioning
-
Landscaping/Hardscaping - complete<br>
-
Parking Lot - Complete & striped
-
Dumpster / Recycle Service - in place & scheduled
Lobby/Bar
-
HVAC / Exhaust - working properly
-
Wall Coverings - installed
-
Finished Floor - fully sealed
-
Beer taps/Bar Equipment - Draft / FOB / Glycol system fully functioning
-
Bar top - installed & fully sealed
-
Ceiling tiles - installed
-
Coke - CO2, Bar guns and soda tower all functioning properly
-
Refrigeration working
-
Lighting - installed and functioning<br>
-
Bar signage - installed
-
Tables and Chairs on site
-
AV Systems & music - installed and functioning
Gallery
-
Wall coverings - installed
-
Floor Carpet/Tile - installed <br>
-
Ceiling fully - installed
-
Lighting - installed
-
Interior Signage - i.e. Auditorium Numbers, Restroom and Directional, Occupancy Signs
Auditoriums
-
Seating - Installed (including power to chairs)
-
Tabletops (Lighting, Menu holders, Table numbers) - All table #’s verified with online map (including ADA/Companion spots)
-
Auditorium Lighting installed and functional
-
Screens - installed & QC’d
-
Image configuration - complete<br>
-
Masking - installed
-
Port Windows - installed
-
Drapes - installed
-
Speakers - installed
-
Wall Carpet - installed
-
Floor Finishes - fully sealed
-
Aisle Lighting - installed and functioning
-
Trim Caps - installed
-
Acoustical Ceilings - installed <br>
-
Exit/Entry Doors - Closers installed, Sealed and Quiet
-
CC/ALD - Installed & QC’d
-
Removable ADA seats - in house
Server Stations
-
FRP/ wall carpet - installed
-
Stainless Countertops - installed
-
Heat Lamps - installed & functioning
-
Lighting - installed
-
Floor Finishes - complete
Mezzanine – Projection
-
Theater Management System - online and fully operational
-
Projectors - online, Picture and Sound checked
-
Projectors - fully operational
-
Projector configuration - complete
-
Server - fully operational
-
Server configuration - complete
-
3D equipment - operational
-
Sound rack - wiring complete
-
Booth clean and organized
-
TMS Server room/area clean and organized
-
Full playlist run on each machine and all cueing confirmed - light and door cues
Restrooms
-
Fixtures/Partitions/Countertops all 100%
-
Water temperature compliant with code requirements
-
TP/Paper Towels/Soap 100%
Operations
-
Staffing levels achieved by 90%
City Requirements
-
Building inspection sign-off
-
Health inspection sign-off
-
Fire inspection sign-off
-
Liquor license procured
-
Certificate of Occupancy