Title Page
-
Conducted on
-
Prepared by
-
Location
Aloha
-
Printer routing 100% by work station
-
Menu prices confirmed vs local menu
-
Front bar table numbers established and created
-
Modifier items and prices validated
-
All menu items available per local menu
-
All theater seat numbers confirmed
-
All printers & terminals functional
-
Manager reports ingested in Aloha BOH
Vista
-
Kiosks functional and stocked
-
Ticket monitors operational
Front Bar
-
Table numbers and seating chart printed, laminated and posted
-
Server station location established and stocked
-
Tap handle numbering system established
-
Smallwares stocked
-
Builds and recipes printed and available
-
Training materials posted, printed and available
-
Opening, closing and cut duties printed and available
-
Storage and beverage shelves labeled
Restrooms
-
Soap and hand towels stocked
-
All sensors working
Concierge
-
Opening, closing and cut duties printed and available
-
Training materials printed and available
-
Phones working w/ recordings and phone tree set up
-
Terminals permanently placed
-
Vanguard stamps available
-
Book complete with upcoming Specialty events, Emails, Directions to the hospital, Victory info, Vanguard applications, Employee pass log, etc.
Servers
-
Server stations stocked for guest service
-
Opening, closing and cut duties printed and available
-
Theater assignment, clips and stocking pars posted printed and available
-
Role Play Theater assignments establish per seat booking plan
-
Menu, order cards & pens on tables
Service Bar
-
Prep list and line check printed and available
-
Opening, closing and cut duties printed and available
-
Wells and keg cooler labeled
-
Storage and beverage shelves labeled
-
Ticket rails installed
-
Soda tower functional and brix kit on site
-
Smallwares stocked
-
Draft wall labeled by beer type/vendor
-
Coke machine calibrated and functioning
-
Ice machines burned and cleaned
-
Initial LBW orders established
-
Water filter/softener installed and functioning
-
Builds and recipes printed and available
-
Training materials posted, printed and available
Kitchen
-
Linecheck, prep list, temp log, cooling log, waste log printed and available
-
Opening, closing and cut duties printed and available
-
Smallwares stocked
-
Builds and recipes printed and available Training materials posted, printed and available
-
Initial USFoods and produce orders established
-
USFoods order guide complete
-
Dish machine chemicals in house
-
Storage and food shelves labeled
Operations
-
Verify seating layout for websites; ADA/companion seating, table numbers, sight lines
-
Training Days staff schedules complete
-
Assign job codes to employees for training days
-
Music working in lobby and restrooms
-
Restroom keys available
-
Staffing pars 90% achieved by job code
-
Equipment commissioned; including bar equipment, hood vents, combi, dish machine, draft system, coffee/tea/grinder, air balance
-
Manager office millwork and safe installed
-
Trash removal services scheduled
-
Linen service schedule established
-
Thermostats are functional and set
-
Tip distribution plan by job code established
-
OTT local operations Q&A complete
-
90% Alamo U completion rate
-
Crash kits and impact plates in house
Required Signage
-
Training materials: Posters / QRG’s / Build books
-
OCC’s (server, bar, specialty bar, concierge, runner, kitchen)
-
Values poster / Food hierarchy
-
Pull thaw chart/perfect dough/cut chart
-
Communication boards
-
Labels for walk ins, coolers, service wells
-
Alamo U learning lab / Break rooms
-
State and Federal required signage
-
Alamo's Approach to Training
-
Beer Profile Poster
-
Fry Oil Rotation
Tickets on Sale Readiness
-
Website ready; admissions, polices, directions, soft opening assets, coming soon, calendar populated
-
Capacity & compensation plan established
-
Seats booked
-
Titles confirmed / booked / DCP’s en-route or on-site
-
Role-play Day schedule mocked up
-
Price cards / Vista entries (“Staff Training Days”) Requested
-
Secret ticket link set up / Movio campaign
-
Media tour invite list, invites, show flow & tentative date established
-
KK approved press release ready for wide release
Presentation
-
Projectionists schedules training days playlist for mock service
-
Theater lighting levels set; track, isle, reel, table, server stations
-
Theater audio levels set
-
Training plan establish for projectionists
Mezzanine – I.T. Install
-
UPS – Running and Commissioned (Powering I.T. racks)
-
Network/Phone running and operational, servers online
-
Security System online
-
ISP equipment installed and confirmed online
-
Network equipment installed
-
Vista server installed
-
Seating layouts and tables confirmed for all theaters
-
Handhheld connectivity confirmed
-
Handheld pre-swipe function confirmed
-
EDC settling CC batches
-
Gift cards and credit cards processing at POS confirmed