Title Page

  • Conducted on

  • Prepared by

  • Location

Aloha

  • Printer routing 100% by work station

  • Menu prices confirmed vs local menu

  • Front bar table numbers established and created

  • Modifier items and prices validated

  • All menu items available per local menu

  • All theater seat numbers confirmed

  • All printers & terminals functional

  • Manager reports ingested in Aloha BOH

Vista

  • Kiosks functional and stocked

  • Ticket monitors operational

Front Bar

  • Table numbers and seating chart printed, laminated and posted

  • Server station location established and stocked

  • Tap handle numbering system established

  • Smallwares stocked

  • Builds and recipes printed and available

  • Training materials posted, printed and available

  • Opening, closing and cut duties printed and available

  • Storage and beverage shelves labeled

Restrooms

  • Soap and hand towels stocked

  • All sensors working

Concierge

  • Opening, closing and cut duties printed and available

  • Training materials printed and available

  • Phones working w/ recordings and phone tree set up

  • Terminals permanently placed

  • Vanguard stamps available

  • Book complete with upcoming Specialty events, Emails, Directions to the hospital, Victory info, Vanguard applications, Employee pass log, etc.

Servers

  • Server stations stocked for guest service

  • Opening, closing and cut duties printed and available

  • Theater assignment, clips and stocking pars posted printed and available

  • Role Play Theater assignments establish per seat booking plan

  • Menu, order cards & pens on tables

Service Bar

  • Prep list and line check printed and available

  • Opening, closing and cut duties printed and available

  • Wells and keg cooler labeled

  • Storage and beverage shelves labeled

  • Ticket rails installed

  • Soda tower functional and brix kit on site

  • Smallwares stocked

  • Draft wall labeled by beer type/vendor

  • Coke machine calibrated and functioning

  • Ice machines burned and cleaned

  • Initial LBW orders established

  • Water filter/softener installed and functioning

  • Builds and recipes printed and available

  • Training materials posted, printed and available

Kitchen

  • Linecheck, prep list, temp log, cooling log, waste log printed and available

  • Opening, closing and cut duties printed and available

  • Smallwares stocked

  • Builds and recipes printed and available Training materials posted, printed and available

  • Initial USFoods and produce orders established

  • USFoods order guide complete

  • Dish machine chemicals in house

  • Storage and food shelves labeled

Operations

  • Verify seating layout for websites; ADA/companion seating, table numbers, sight lines

  • Training Days staff schedules complete

  • Assign job codes to employees for training days

  • Music working in lobby and restrooms

  • Restroom keys available

  • Staffing pars 90% achieved by job code

  • Equipment commissioned; including bar equipment, hood vents, combi, dish machine, draft system, coffee/tea/grinder, air balance

  • Manager office millwork and safe installed

  • Trash removal services scheduled

  • Linen service schedule established

  • Thermostats are functional and set

  • Tip distribution plan by job code established

  • OTT local operations Q&A complete

  • 90% Alamo U completion rate

  • Crash kits and impact plates in house

Required Signage

  • Training materials: Posters / QRG’s / Build books

  • OCC’s (server, bar, specialty bar, concierge, runner, kitchen)

  • Values poster / Food hierarchy

  • Pull thaw chart/perfect dough/cut chart

  • Communication boards

  • Labels for walk ins, coolers, service wells

  • Alamo U learning lab / Break rooms

  • State and Federal required signage

  • Alamo's Approach to Training

  • Beer Profile Poster

  • Fry Oil Rotation

Tickets on Sale Readiness

  • Website ready; admissions, polices, directions, soft opening assets, coming soon, calendar populated

  • Capacity & compensation plan established

  • Seats booked

  • Titles confirmed / booked / DCP’s en-route or on-site

  • Role-play Day schedule mocked up

  • Price cards / Vista entries (“Staff Training Days”) Requested

  • Secret ticket link set up / Movio campaign

  • Media tour invite list, invites, show flow & tentative date established

  • KK approved press release ready for wide release

Presentation

  • Projectionists schedules training days playlist for mock service

  • Theater lighting levels set; track, isle, reel, table, server stations

  • Theater audio levels set

  • Training plan establish for projectionists

Mezzanine – I.T. Install

  • UPS – Running and Commissioned (Powering I.T. racks)

  • Network/Phone running and operational, servers online

  • Security System online

  • ISP equipment installed and confirmed online

  • Network equipment installed

  • Vista server installed

  • Seating layouts and tables confirmed for all theaters

  • Handhheld connectivity confirmed

  • Handheld pre-swipe function confirmed

  • EDC settling CC batches

  • Gift cards and credit cards processing at POS confirmed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.