Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Weather conditions: temperature, rainfall, etc.
-
Date of last rainfall (approx)
-
Images of site (attach)
CIVIL COMPONENTS OF BIOFILTER TO INSPECT
INLET
-
Evidence of erosion
- Yes
- No
- Actioned
-
Blockage
- Yes
- No
- Actioned
-
Damage
- Yes
- No
- Actioned
-
Standing water
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
OUTLET
-
Evidence of erosion
- Yes
- No
- Actioned
-
Blockage
- Yes
- No
- Actioned
-
Damage
- Yes
- No
- Actioned
-
Standing water
- Yes
- No
- Actioned
-
Outlet freely draining
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
OTHER STRUCTURES (pits, pipes, access ramps, walls, rock protection)
-
Name the structure(s)
-
Evidence of erosion
- Yes
- No
- Actioned
-
Blockage
- Yes
- No
- Actioned
-
Damage
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
BATTERS & BUNDS
-
Evidence of erosion
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
SEDIMENT ACCUMULATION
-
Sediment forebay less than 75% full
- Yes
- No
- Actioned
-
Major sediment accumulation on surface of biofilter
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
FILTER MEDIA SURFACE
-
Filter media is draining freely
- Yes
- No
- Actioned
-
Water ponding on surface of biofilter for more than 12 hours after rainfall
- Yes
- No
- Actioned
-
Impermeable or clayey surface on the filter media
- Yes
- No
- Actioned
-
Major surface crusting (<3mm depth across less than 10% of the filter area is permissible)
- Yes
- No
- Actioned
-
Surface scour
- Yes
- No
- Actioned
-
Depressions
- Yes
- No
- Actioned
-
Major algal growth (less than 10% of biofilter area is permissible)
- Yes
- No
- Actioned
-
Moss growth present
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
INSPECTION OPENINGS
-
Water level is below filter media level
- Yes
- No
- Actioned
-
Sediment accumulation in underdrain system
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
LANDSCAPE COMPONENTS
MULCH LAYER (where applicable)
-
Even depth and distribution of mulch layer
- Yes
- No
- Actioned
-
Surface of mulch layer is at least 100 mm below the top of the inlet and outlet.
- Yes
- No
- Actioned
-
Mulch is not touching the plant stems.
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
VEGETATION
-
Greater than 90% vegetation cover on filter media
- Yes
- No
- Actioned
-
Greater than 90% vegetation cover
- Yes
- No
- Actioned
-
Less than 10% of the filter media surface covered in weeds.
- Yes
- No
- Actioned
-
Less than 10% of batters covered in weeds.
- Yes
- No
- Actioned
-
Plants healthy, free from disease and vigorously growing
- Yes
- No
- Actioned
-
Damage by pest animals
- Yes
- No
- Actioned
-
Damage by insects
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
LITTER
-
Filter media and batters free of litter (i.e. less than 1 piece per 4 sqm)
- Yes
- No
- Actioned
-
Evidence of dumping (e.g. building waste)
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
OIL SPILLS/INFLOWS
-
Evidence of oil spills/flows
- Yes
- No
- Actioned
-
Maintenance undertaken
-
Further action required
OVERVIEW
-
Overall inspection observations
-
Actions to be undertaken
-
Further comments
-
Time spent at site.