Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Have all visitors signed the visitor log.
-
Are hazards and controls discussed with visitors prior to entering the site?
-
Hazard ID identifies current hazards relating to the site activities
-
Hazard ID controls relevant to the hazards and have assigned responsibilties?
-
Plant and equipment register complete and on site?
-
Incident report register on site and up to date?
-
Measuring and test equipment calibration register complete and on site?
Worksite Management
-
Hazardous substance register completed and/or related MSDS's sheets on site?
-
PPE selected, used and adequate for the activity and environmental hazards present?
-
Is the work site (including footpaths and roadway) clear and free from debris, rubbish and obstructions?
-
Are slip and trip hazards being adequately managed?
-
Are unattended excavations backfilled, plated or fenced?
-
Dust and noise on site is minimised or elimiinated
-
Are facilities for workers available e.g Portaloos, Hand Washing Facilities
Excavation and drilling
-
Excavation and drilling permit completed and available
-
Permit is current for the location?
-
Have all current proximity permits been obtained from utility owners?
-
Close approach permit if plant or people are working within 3 metres of overhead cables?
-
Are current utility clearance plans onsite?
-
All relevant services marked?
-
All relevant services located?
-
Service plans have locators, site managers, site supervisors, and contractor crews signatures?
-
Only techniques approved on the permit being used?
-
Excavations deeper than 1.5 metres are notified to MBIE.
-
Has a services spotter been allocated to excavator?
-
Are trenches greater than 1.5 metres deep (or where appropriate) battered, benched or supported?
Traffic Management
-
Copy of the traffic management plan maintained on site?
-
Traffic management setup is correct and according to the approved TMP?
-
Is there are escape route for the traffic controller?
-
STMS contact number listed?
-
After hours TMP in place?
-
Cones and barriers in good condition?
Plant and equipment (including mobile plant)
-
All mobile plant and machinery maintained within the confines of the established TMP under COPTTM requirements?
-
Safe reversing procedures are being followed?
-
Vehicles are parked safely?
-
FOPS,ROPs,COPS,OPS certification (if required) for mobile plant? <br>
-
WOF/COF/Registration/RUC current?
-
Drivers/Operator licences and endorsements available?
-
Are machinery operators wearing sear belts
Public safety and pedestrian access
-
Is safe pedestrian access maintained on site at all times?
-
Trenches are cordoned off?
-
Are appropriate barriers in place?
-
Manholes and pits are made safe?
-
Does TMP cater for people with disabilities and also for children?
-
When plant and machinery (e.g diggers, drills etc) are in operation these are isolated from the general public?
-
Are ramps compliant?
Emergency planning and equipment
-
Is the site able to call for emergency assistance - Fire, Police, Ambulance?
-
Emergency assembly point identified
-
Are first aid kits readily available and well stocked?
-
Are appropriate Fire Extinguishers available on site?
-
Has an emergency plan been prepared to cover a line strike and any other emergencies?
-
Are spill kits available?
Confined spaces (If present on site)
-
Is there a Confined Space Management (CSM) plan on site
-
Is there a competently trained CSM Supervisor on site?
-
Entry permit system in use to manage CS work?
-
Is there a standby person stationed outside the CS while work in progress?
-
Does the CSM plan describe the emergency rescue procedures?
-
Is emergency rescue equipment at or near the entry?
-
Before entry to CS, is atmospheric testing carried out?
-
During work in CS, is atmospheric testing carried out?
-
Oxygen monitors available if required?
Environmental management
-
Site specific tree plan on site and signed off by local authority?
-
Spill response plan available and understood?
-
Spoil containment and removal (including stockpiles) managed?
-
No backfill stored on roads within 50 cm of environmentally sensitive areas i.e drains, streams and/or dumps leading to storm water pits?
-
Storm-water sediment traps and gutter guards for water run off in place (50 metres down run of any excavation site or stockpiles)?
-
Drop sheets under backfill on the ground?
-
Fibre offcuts and ribbonet off cuts being recycled?
Summary - If any of the following areas are not compliant then work at the site should be halted until the area of concern is addressed
-
If any of the following safety critical areas are not compliant then work at the site should be halted until the area of concern is addressed
-
A permit to work exists for drilling and excavation
-
A traffic management plan is in place?
-
Pedestrian safety is being maintained?
-
Hazards have been identified for the site and appropriate controls are in place
Agreement
-
Required corrective/preventative actions
-
Agreed date of completion
-
Select date
-
Auditor
-
Site representative