Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Plumber
-
Shower mixers sealed to wall
-
Al fixtures sealed where necessary
-
Plugs for all basins/baths etc.
-
Seal waste & fit bends
-
Final test on all fittings completed
-
Pipes straight, correct heights
-
Check final kitchen plan
-
Relief drain from HWS ok
-
Pipes lagged where necessary
-
Pipe locations checked & correct
-
Waste pipes located inside walls
-
Solar panels on roof
-
Solar unit commissioned
House Keeping
-
Bin in place
-
Site left in a safe manner
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit