Title Page
-
Customer Name:
-
Telephone Number:
-
Site Address:
-
Cylinder Make and Model:
-
Cylinder Serial Number:
-
Engineer Name:
-
Registered Operative ID Number
-
Company Name:
-
Company Address:
-
Service Date:
ALL SYSTEMS PRIMARY SETTINGS (indirect heating only)
-
Is the primary circuit a sealed or open-vented system?
-
What is the maximum primary flow temperature? (°C)
ALL SYSTEMS
-
What is the incoming static cold water pressure at the inlet to the system? (BAR)
-
Has a strainer been cleaned of installation debris (if fitted)?
-
Is the installation in a hard water area (above 200ppm)?
-
If yes, has a water scale reducer been fitted?
-
What is the hot water thermostat set temperature? (°C)
-
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)? (L/min)
-
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?
-
Is the cylinder solar (or other renewable) compatible?
-
What is the hot water temperature at the nearest outlet? (°C)
-
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed
-
Type of control system (if applicable) Y Plan?
UNVENTED SYSTEMS ONLY
-
Where is the pressure reducing valve situated (if fitted)?
-
What is the pressure reducing valve setting? (BAR)
-
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?
-
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations
-
Are all energy sources fitted with a cut out device?
-
Has the expansion vessel or internal air space been checked?
THERMAL STORES ONLY
-
What store temperature is achievable? (°C)
-
What is the maximum hot water temperature? (°C)
ALL INSTALLATIONS
-
The hot water system complies with the appropriate Building Regulations
-
The system has been installed and commissioned in accordance with the manufacturer’s instructions
-
The system controls have been demonstrated to and understood by the customer
-
The manufacturer’s literature, including Checklist and Service Record, has been explained and left with the customer
Signatures
-
Engineer Comments
-
Parts Used
-
Engineer Signature:
-
Customer Signature: