Title Page
-
Conducted on
-
Prepared by
-
Location
Receiving
-
All receipts were done and raised GRNs on valid documents received from the clients
-
If No for above the required approvals were obtained and process mentioned on the manuals was followed
-
Receipt of MSDS or equivalent document to get the storage and handling information of the product
-
Maintaining a document to tally and ensure the quality and the quantity of goods received at the time of unloading
-
All printed GRNs were signed by respective assigned executives or the written direction given by company head authorizing nominated personnel to authorize GRN
-
Copies of the authorized GRNs were filed with required supporting document
-
Supporting documents of consignment were properly filed
Dispatch
-
Availability of specimen signatures or mail addresses list authorized by one of the client's valid officer, from all client's with regards to authorizing of delivery orders to release goods
-
All issues were done and raised GDN on valid delivery orders received
-
No cargo was released on orders received via email if order details can be altered by someone prior to order processing
-
Maintaining a document to tally and ensure the quality and the quantity of goods issued at the time of loading
-
Valid verification is done to identify and certify the truck that comes for collection of cargo from the warehouse
-
Proper acknowledgments were taken and PODs are collected for all goods released / delivered
-
All printed GDNs were authorized by the respective executive or an executive nominated by company head for authorization
-
Supporting documents of outward were properly filed
Value Added Services
-
All VAS activities are started with availability of Client approved sample and guideline documents
-
Specimen sample is displayed on VAS table during the period of performing the particular VAS activity
-
Quality inspections are carried out and maintain quality assurance documents
-
Day end reconciliation is carried out for the products/materials handled in VAS floor and is signed by the officer in charge VAS floor on daily basis
Storage Best Practices
-
All goods are not just kept on the floor
-
Product compatibility is critically considered for storing of Goods
-
100% adherence to cargo labels / instructions on packaging
-
No MHE aisles are blocked disrupting the MHE movement
-
Assign designated area for empty pallet storage, cleaning equipment and MHE parking
-
The required gap of 0.9m is kept from cargo stacks to wall
-
The required gap of 0.5m is kept from light level (roof) to cargo stack
-
Warehouse space occupancy is less than 90% and if beyond 90% appropriate actions are taken to ensure safe work environment
-
Damaged and expired stocks are not kept with salable /approved stock
-
Maintain housekeeping within warehouse and surrounding more than 90%
-
All other storage best practices were adhered 100%
Health, Safety and Quality Best Practices
-
A responsible person nominated by Head of the Company or Head of Compliance is available within the site for health and safety
-
Availability of documents to prove that hazard identification and risk assessment is done for the site
-
Availability of site specific safety/ security/ quality signage , site map and instructions within the site in local language
-
Safety briefing is given for new recruits, contractors, visitors and records are maintained
-
All staff /workers/visitors wear necessary PPE within the site
-
All lifting and other equipment used for handling goods are periodically checked and certified. Certificates are available at site
-
A proper comprehensive fire fighting system is in place with a fire certificate for the site
-
A proper electrical survey is done and certificate is available at site
-
An active fire fighting team is available and names & positions are displayed within the site
-
An active First aid Team is available at site with necessary first aid requirements
-
A properly maintained pest control system in place to prevent damage to goods from termite/rats and birds
-
Driver and truck disciplinary at the dock is maintained as per manual instruction
-
All other quality/health and safety best practices mentioned on the manual were adhered 100%
Inventory Sign off Policy
-
Monthly system /inventory reconciliations were done for all clients whose inventories are managed
-
Cycle count plans for all clients are available
-
100% cycle counts were done as per cycle count plan
-
Stock discrepancies are identified during the cycle count were sorted out as per procedure set
Security Best Practices
-
A proper security survey was conducted and staff assigned to the site is satisfied with existing security system. Survey records available
-
Availability of 24h adequate security service
-
Availability of proper sealing methods/daily sealing certificate as per manual
-
Opening /locking procedure is available approved by Head of Security with 100% execution
-
Security measures mentioned on the manual were adhered 100%
General
-
All active clients are having valid agreement
-
All active suppliers are having valid agreement
-
Monthly HK audits were done and reports are filed
-
Monthly security audits were done and reports are filed
-
Monthly safety audits were done and reports are filed