CONTROL MEASURES
-
Has a daily risk and hazard assessment (HiDra) been completed prior to starting work
-
Have all employees or visitors signed the HiDra
-
Has the HiDra been completed in full
-
Have all employees and visitors been inducted into the project/site
-
Have any overhead hazards been identified
-
Have any specific traffic hazards been identified
-
Have any other location hazards been identified (school, steep incline, etc.)
-
Are bush fire safety measures in place
-
Have any specific environmental issues relating to the site been identified
-
Is there a controlled and approved copy of the current Safety Management Plan on site
-
Is there a controlled and approved copy of current Safe Working Method Statements on site
-
Are personnel carrying identification tags that are in a reasonable condition
Basic Safety Items
BASIC SAFETY ITEMS
-
Are First Aid Kits readily available and fully stocked
-
Is there a suitable fire extinguisher on site for potential fire risks
-
Is the fire extinguisher within the service tag date
-
Is the fire extinguisher safety pin in place and the lanyard/seal unbroken
-
Is the fire extinguisher stored safely and easily accessible from the work site
-
Is there adequate natural/artificial lighting on site
-
As there any trip hazards such as hoses or cables running across the road or pathway
-
Is there someone on site in charge of monitoring their presence in the path of vehicles or people
-
Are there any fuel containers on site
-
Are the fuel containers correctly stored to allow expansion
-
Are all chemicals stored correctly within the vehicle
Clothing & PPE
CLOTHING & PPE
-
Are regulation helmets worn correctly at all times (within 3yrs of manufacturers date)
-
Are appropriate safety glasses or face shields being worn where necessary
-
Are appropriate respirators or filters being used when necessary
-
Are gloves being worn by all operators
-
Are hand washing/protection products available in the vehicle
-
Are steel toe safety boots being worn by all workers and visitors
-
Is ear protection being used where necessary
-
Are all operators wearing high visibility clothing that is in good condition
Confined Spaces & Associated Hazards
CONFINED SPACE & ASSOCIATED HAZARDS
-
Has a gas monitor been response tested and recorded on the appropriate documentation
-
What is the serial number of the gas monitor on site
-
Is the gas monitor within calibration date
-
Has the testing of the manhole/entry point been recorded on the HiDra or entry permit
-
Is are there any confined space entries on this site
-
Are all operators trained in confined space entry
-
Is the standby person suitably trained in confined space entry
-
Name of nominated person for confined space entry:
-
Name of standby person for confined space entry:
-
Are correct confined space procedures being followed
-
Has the confined space entry permit been filled out
-
Has the entry permit been filled out correctly and signed
-
Is there an approved tripod on site
-
Is the tripod fully extended
-
What is the tripods Serial No.
-
Is there a full parachute type harness on site
-
Is the harness in good condition and within life expectancy date
-
What is the harness Serial No.
-
Is there confined space entry signage on good display
-
Is there an air rescuer on site and within its 10yr life expectancy
-
Is a grate covering any unattended manhole
CCTV & Jetting
CCTV & JETTING
-
What SWMS are in use for this site/project
- CCTV
- CCTV & Jetter
- Dingo
- Combo Cleaning
- Microtraxx
- Patching
-
Are all SWMS on site and easily accessible
-
Is the Jetter hose in good condition
-
Is access to and from the vehicle safe and acceptable
-
Is there a 110mm gap to prevent back-flow from the jetted reservoir
-
Is there a back flow prevention device on the stand pipe
-
Is there a current certificate for the back flow prevention device
Traffic Control
TRAFFIC CONTROL
-
Is traffic control needed/ in use on this site
-
Is there an approved traffic control plan in place
-
What is the traffic control plan number
-
Are advisory signs as per the plan selected
-
Is there a requirement for traffic controllers on site
-
Is there a need for a certified traffic control agency on site
-
What is the name of the traffic controller or company
-
Does the traffic controller hold the required certificate/card
-
Does the agency have an approved plan on site (by council or RTA)
-
Are sufficient advisory signs being used and correctly placed
-
Is access around the worksite safe for the public
-
Are all traffic controllers appropriately dressed
-
Is there an approved police permit on site
-
Is there a current council permit or written authorisation on site
-
Is there a qualified relief person on site
-
Is signage in good condition
-
Do traffic controllers have escape routes away from traffic
-
If at night, are night wands being used
-
Are pedestrian managers required on site
Signage
SIGNAGE
-
As there 2x "pedestrians watch your step" signs on site/stored
-
Photo of condition
-
Are there 2x "part road closure" signs on site or stored
-
Photo of condition
-
Are there 4x "dig man ahead" signs on site or stored
-
Photo of condition
-
Are there 2x "chevron left/right" signs on site or stored
-
Photo of condition
Plant
PLANT
-
Drivers/operators name(s)
-
Are all operators/drivers licensed to do so
-
What class of license does the driver hold
-
Rego expiry date
-
Vehicles Rego number
VISUAL INSPECTION OF
-
Tyres
-
Lights
-
Horn
-
Windscreen & windows
-
Bodywork
-
Hydraulics
-
Towing mechanism
-
Is the vehicle cabin neat and tidy
-
Is there a spare tyre and jack for this vehicle
-
Is there safe access onto or into the vehicle (steps etc.)
-
Is the work area of the vehicle tidy and is all equipment used or stored correctly
-
Does the vehicle have a towed attachment
-
Tyres
-
Lights
-
Towing mechanism
-
What is the vehicles Rego number
-
When does the Rego expire
Electrical
ELECTRICAL
-
Are all electrical leads and portable equipment tested and tagged
-
Are all portable generators, extension leads and power tools protected with earth leakage devices
-
Is an earth lead being used
-
Is an electrical tag and test lo book in the vehicle and completed correctly
House Keeping
HOUSE KEEPING
-
Is the general work area tidy and are materials stored correctly
-
Are noise requirement being adhered to
-
Are bins being used
-
On completion has the site been left as found
-
Have start times (7am earliest) been adhered to
Additional Comments & Signatures
ADDITIONAL COMMENTS & SIGNATURE
-
General comments
-
Are any actions needed
-
Actions needed
Inspection Carried Out By
-
Add signature
-
Select date
Witness
-
Add signature
-
Select date