Information
-
Document No.
-
Audit Title
-
Client / Site (displayed on first page)
-
Conducted on
-
Prepared by
More than one auditor?
-
Additional auditors
Weather Conditions
-
Has it rained over previous 24 hours?
-
Is runoff being managed appropriately?
-
Wind direction?
Dust and Air Quality Management
-
Is any dust being generated from works?
-
Are adequate dust management measures in place?
-
Are any odours noticeable?
-
Describe odour
Soil Management
-
Are soils being handled on site?
-
State activity
-
Are soils/materials being adequately segregated during excavation? This includes stained or odorous material and material containing more than 10% waste.
-
Are soils free of inert waste/stains/odours being transported and placed in designated areas?
-
Has any stained, odorous or material containing inert waste been uncovered?
-
Have these been segregated and stockpile in storage pad with adequate controls in place?
-
Is soil tracking documentation being maintained?
-
When was the soil tracking register last updated?
-
Has it been over three days since BMD updated soil tracking?
-
Are there any visible signs of contaminated soil on the excavation walls or floor?
-
Describe and report to BMD for further investigation
Temporary Stockpile Storage Pad
-
Are appropriate stockpile controls in place?
-
Are any cracks or staining observed on the pad?
-
Provide detail including location and size of area stained or cracked
Groundwater spear installation
-
Is groundwater spear installation occurring?
-
Is the installation being undertaken as per the WMS?
-
Is there any odour or anything visible in the water/spill?
Groundwater Management
-
Is groundwater dewatering occurring?
-
Confirm if groundwater, groundwater/stormwater or just stormwater s being pumped
-
Are daily field checks being undertaken? Observe records.
-
Is daily salt load criteria being met?
-
Are any sheens visible or odours noticeable or have they been recorded?
-
Is there capacity in the settlement tanks and is dewatering working effectively?
-
Is the flow meter working?
-
Were the results within acceptable limits?
-
Has the initial sampling been undertaken?
-
We're the results within the acceptable limits?
-
Are volumes released within allowable limits (xx)? Record
-
Is equipment, connections and discharge system in good working order?
-
Are any leaks visible from the tanks pumps or lines?
-
Are daily field checks being undertaken? Observe records
-
Are results compliant with the TWA?
Coating Removal Works
-
Have any removal works commenced? (State activity)
-
Are dangerous goods adequately bundled and segregated?
-
Are SDS available?
-
Are signs of excessive overspray visible?
-
Are there noticeable odours?
General Observations
-
Have concrete works commenced?
-
Is a concrete washout facility in place with capacity?
-
Are any other activities occurring? For example NDD
-
Are dangerous goods stored in the work zone?
-
Are SDS available?
-
Waste facilities in place with capacity?
-
Spill kits available and stocked?
-
ECP displayed and controls implemented as per plan?
-
Are any out of hours occurring/planned?
-
Is Desktop Noise Assessment in place?
-
Are works compliant with this plan?
Action required?
-
Action
-
Allocated to
-
Action due
-
Signed PoMC Representative:
-
Signed Principal Contractor Representative (optional):