Title Page
-
Glencore Collinsville Coal on bench audit 1
-
On Bench Inspection Audit
-
Glencore Collinsville Coal
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PPE
-
Helmets worn on bench
-
Gloves carried by crew members
-
Shirts tucked in sleeves rolled down
-
Dust masks and earplugs available
-
Isolation locks available for crew
-
Drinking water available
-
Sunscreen available and used
-
Glencore SLAM completed for task
Shot deliniation
-
Shot delineated with cones, blasting signs and red solar lights
-
Park up area identified with signage
-
Bundling in place where required
-
Evidence of compliance
-
Evidence of issues / hazards
Shot paperwork
-
Traffic management plan
- Completed for bench
- Signed onto by all crew members working on bench each day
- Direction of travel clearly identified for each day
- Park up area identified
- Entry exit points identified
- Hazards identified eg high wall, stand off zones, boggy areas
-
JSA
- Signed off by Glencore representative
- Reviewed and signed on daily by crew
- Crew use full name on sign off
-
Crew members completed Glencore Slam for task
-
On bench TBT checklist completed
- Completed daily for bench
- All crew signed on
- Additional hazards / controls identified added to document
Housekeeping
-
Boxes broken down and removed from bench. Explosives boxes labels spray painted before place in bins
-
Hole savers removed and stacked off bench for drillers to collect
-
Rows cleaned up with loader where required
-
Pegs hammered in securely to hole collars
-
Unused equipment removed eg gas bags, rubbish etc
-
Unloaded holes stemmed off prior to firing eg short holes, redrills etc
Fleet
-
Fleet parked in correct areas
-
All fleet in use prestarted
-
Fault reports completed for any defects
-
Fleet only operated by trained and authorised people
-
Spotters used where required
-
Wheel chocks used where required
Sign off
-
Auditor
-
Shotfirer in charge
-
Blast Tech
-
Blast tech
-
Blast tech
-
Blast tech