Title Page
-
Customer
-
Date works were Conducted on
-
Who prepared this report
-
Location
Job description
-
Work title
-
Type of work
-
Who requested the works
-
Time and date of when these works were requested
-
Emergency stop buttons
-
Action required
-
Hoist limits
-
Action required
-
Hoist brake
-
Action required
-
Load / chain condition
-
Action required
-
Load anchor point
-
Action required
-
Anti-collision system
-
Action required
-
Bottom block assembly
-
Action required
-
Shelves / sprockets
-
Action required
-
Hoist motor / gearbox
-
Action required
-
Shafts / coupling / bearings
-
Action required
-
Rope drum
-
Action required
-
Chain / rope guides
-
Action required
-
Hoist Electrical components and limits
-
Action required
-
Hoist Lubricant and grease points
-
Action required
-
Wheels
-
Action required
-
Pinions and wheel racks
-
Action required
-
Shafts / couplings / bearings
-
Action required
-
Cross travel motor / gearboxes
-
Action required
-
Long travel wheels
-
Action required
-
Pinions and wheel racks
-
undefined
-
Shaft / couplings / bearings
-
Action required
-
Motor / gearbo
-
Action required
-
Brakes
-
Action required
-
Electrical / limits
-
Action required
-
Lubrication / grease points
-
Action required
-
Electrical panels
-
Action required
-
Cables / festoon
-
Action required
-
Collector / bussbar
-
Action required
-
Pendant / remote contols
-
Action required
Tasks and attendees
- Task
-
Detailed report
Inspection details
-
Safety critical
-
Additional engineers on site
-
Name or engineers
- Daniel Vern
- Kyle longden
- Declan mcmanus
- Other
-
Name of others in attendance
-
Any recommendations
-
Detailed description of work recommendation
-
Is the job / area left a safe condition
-
What measures have been put in place to protect others from the unsafe job / area / equipment
-
Sketch
-
Photo
Signatures
-
Lead engineer attending
- Paul Plasted
- Lee Fletcher
-
Engineers Signature
-
Engineer’s signature
-
Customer signature
-
Customer notes
-
Engineer’s notes