Title Page
-
Customer
-
Job Number
-
Lot Number
-
Product
Product Inspection
-
Packing Date
-
Delivery Date
-
BB/DU Date
-
Pack Size
-
Site code
-
Variety
-
Origin
-
Start of Production
-
Have you checked and approved the labels on the Label Sign Off sheet?
-
Have you taken shelf life samples
PRODUCT INSPECTION
-
QUALITY
-
Size/Weight
-
For Prepacked product with a weight stated on the pack - Weigh 50 packs/Punnets. Where an "e" weight is used, check that all samples are over T2. Otherwise check 10 weights and increase if issues are found.
-
Weights measured.
-
For sizing, please check 10 fruit minimum. If issues are found increase the sample size. Check the smallest or largest fruit to check whether in specification.
-
Size measurements
-
Acceptable
-
Issue found
-
Corrective Action
Label check
-
Please take pictures of box end label and finish product
POSITIVE RELEASE
-
Label and packaging check - Labels correct, packaging correct, correct promo correct?
-
Issue found
Defects found during production (Raw material)
-
Attach photos of defects removed during production (P25 and LRP)
-
Overall Quality (Finished Product)
-
Defects Found in finished product (Quote percentages)
-
Defects found
-
Defects found
END OF PRODUCTION
-
End of Production
-
QC Signature: