Title Page

  • Site conducted

  • Name of project

  • Name of Onward Project Manager

  • Type of Project

  • Region

  • Type of property

  • Date and Time

  • Site inspection completed by

  • Job title

  • Principal Contractor Company

  • Name of person on site who is in control of the work being carried out

  • Job title

  • Works being carried out at time of inspection

  • Details of contractors on site

  • Site address

Administration

  • 1 Statutory documents - F10 notice, construction phase plan, insurance certs - current and available on site?

  • 2 Are arrangements in place for site personnel to book on / off site?

  • 3 Do site personnel receive a site induction, including site-specific hazards & risk controls?

  • 4 Site personnel – are all relevant individual competency records available on site?

  • 5 For all activities - is a suitable & sufficient risk assessment in place and has it been communicated to site staff?

  • 6 Are there copies of all issued work permits (e.g. hot works) held on site?

  • 7 Personal safety equipment – are inspection records for safety harnesses available on site?

  • 8 Is there adequate information regarding asbestos readily available on site, including emergency procedures?

  • 9 If a scaffold is on site, has it been installed by competent CSCS / CISRS scaffolders?

  • 10 If a scaffold is on site, are all inspections by a competent person up to date? (initial inspection, 7 day inspection, etc)

  • 11 If lifting equipment (e.g. hoist) is on site has it been installed, certified & checked by a competent person?

  • 12 Is all documentation available to show lifting operations (cranes, HIABS, hoists, etc) are properly planned & managed?

  • 13 If plant / equipment is on site is there accompanying documentation to show that it is inspected & safe to use?

  • 14 Is traffic / pedestrian management installed / located safely and as per the planned arrangements?

  • 15 Is there evidence that the Principal Contractor / Contractor has been monitoring / inspecting H&S performance on site?

  • 16 Is all waste management documentation available? (Licence, completed Waste Transfer Notes, Consignment Notes)

Operational

  • 17 On site is there an identified person who has overall H&S responsibility for all activities?

  • 18 Is there safe access & egress to the place of work?

  • 19 Temporary works - site hoarding / fencing, excavations etc - is it safely installed, protected & inspected?

  • 20 Is lifting equipment (cranes, HIABS, hoists, etc) being used in a safe manner?

  • 21 Are site personnel aware of the safe system of work described in the RA/MS above?

  • 22 Are site personnel complying with the safe system of work described in the site RA/MS?

  • 23 Are adequate controls in place to ensure public / tenant health & safety?

  • 24 Where appropriate, is an adequate & effective works exclusion zone demarcated?

  • 25 Is traffic / pedestrian management installed / located safely and as per the planned arrangements?

  • 26 Is the site / workplace / work area (as appropriate) secure against unauthorised access?

  • 27 hazardous materials, substances, liquids - are they stored securely & safely?

  • 28 hazardous materials, substances, liquids - are they used safely, including appropriate PPE?

  • 29 Are suitable protective measures being used to prevent or reduce exposure to dust?

  • 30 Are suitable protective measures being used to prevent or reduce exposure to noise?

  • 31 Are suitable protective measures being used to prevent or reduce exposure to hand arm vibration?

  • 32 Is plant / equipment installed / located safely so as not to expose the user, and others, to risk?

  • 33 Are power tools / equipment cordless?

  • 34 If electrically powered tools / equipment is being used is the power supply stepped down to 110v?

  • 35 When working with electricity, has the power supply first been isolated / made safe and checked?

  • 36 When working with gas, has the gas supply first been isolated / made safe and checked?

  • 37 Is the site / work area tidy? (including waste materials, materials storage, trailing cables, use of dust sheets, etc)

  • 38 Is there adequate provision for welfare on site?

  • 39 Is there adequate provision for fire & other emergency on site?

  • 40 Is there adequate provision for first aid on site?

  • 41 Is appropriate PPE being worn and used correctly?

  • 42 Ladders (fixed and portable) – are they fit for purpose, safe to use and being used safely?

  • 43 Is there adequate edge protection to protect against falls from height and falling materials (e.g. roof edges, skylights)?

  • 44 Are site vehicles parked safely & legally such that they do not cause obstruction / hazard to others?

  • 45 Is there adequate warning signage appropriately positioned on site?

  • 46 Are there any other site specific issues that require attention? (including unsafe actions)

  • 47 Do workers on site have any comments / observations to make regarding health and safety?

Sign Off

  • Prepared by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.