Information
-
Checklist Title
-
Document No.
-
Station/Hub
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Checklist
Sections Completed
-
A - Daily Checklist
-
B - Operation Checklist
-
C- Load Control
Section A - Daily Checklist
-
Do daily briefing done frequently?
-
Is there any particular before?
-
Do the system (Altea, GFIS, NETLINE) operate properly?
-
Is the connection running well (LAN, Wifi)?
-
Is there a special flight (VVIP, Charter, Extra Flight, Position<br>Flight, Postponed Flight, Innagural Flight, Ferry Flight)?
-
Are all exron aircraft to be dispatched already in apron?
-
Is there any special pax handling?
-
Is there any notice to Airman (NOTAM) and other information related to flights to the destination airport?
-
Do NOTAM and information related to the destination airport was delivered correctly and on time?
-
Are there any existing report for irregularities?
-
Is the delay report has been made correctly and timely?
-
Is the information update block / unblock seat has been passed on to other relevant units?
-
Is the air changes / schedule / route has been informed to other relevant units?
-
Is information changing about reff telex OJ crew rotation has been submitted to the relevant crew?
-
Is the air change in certain flight by telex OM has been informed to the active crew flight?
-
Is the information (Permission Route, Flight Approval, Registration, Aircraft type, Flight Schedule) on the system slotter (chronos) has updated if any changes?
-
Do daily log is created and updated of any changes correctly?
Section B - Operation Checklist
Departure Control
-
Is the flight well monitored?
-
Is the aircraft movement in departure and arrival made with<br>correctly and on time?
-
Is the flight information on GFIS / Altea updated correctly and on time?
-
Is the flight special information / handling are monitored and delivered with the unit well and properly?
-
Is the delay management has been done if irregularities happened?
-
Is the delay code is giving correctly?
-
Is the gate information input and update is done correctly and on time?
-
Is the delay daily report is done correctly and on time?
Load Control
-
Is the special load documented with properly?
-
Do block / unblock seat was updated on the altea system?
Section C - Briefing
-
Select date
-
Location of Briefing:
-
Attendees; Name, Company & Position:
-
Agenda or Reason for Briefing:
-
Items Discussed:
-
Follow Up / Action Points (include responsible person and date action required):
Airport Station Checklist Complete
-
Dipersiapkan oleh