Title Page

  • Conducted on

  • Prepared by

  • Name

  • Tech Number

  • Job number

SM3/4 Compliance

  • Is the meter in good condition with correct fly lead & connections?

  • Why

  • Correct Channel Plan and firmware version?

  • Why?

  • Have mini and full data loggers been taken?

  • Why?

  • Has a Wi-fi test been run?

  • Why?

  • Has a throughput test been run?

  • Why?

  • Have files been attached?

  • Why?

Compression Fittings

  • Are these being replaced/installed on every visit?

  • Why?

  • Are the correct tools being used?

  • Why?

  • Have they been fully inspected and fitted correctly?

  • Why?

Chrome App

  • Has the Chrome App been run?

  • Why?

  • Did the engineer allow for auto-mesh?

  • Why?

  • Did the engineer stress test the system?

  • Why?

  • Are the metrics below 9,500 or -82db

  • Why?

  • Is Ethernet required?

  • Why? (How is it run?)

Sky Q connectivity tool

  • Was this used at the start of the visit?

  • Why?

  • Did the engineer ask the customer their viewing habits?

  • Why?

  • Did the engineer check the standby modes?

  • Why?

ETA’s

  • Did the engineer set ETA’s the night before?

  • Why?

  • Has the route been mapped efficiently?

  • Why?

  • Was the engineer on site at 8am?

  • Why?

Box Swap

  • Has the engineer visited the dish and taken loggers?

  • Why?

  • Has the cable been checked?

  • Why?

  • Have all the leads and components been checked?

  • Why?

  • Has all support been referenced? TV status, Iknow2 & Chatter..?

  • Why?

Observations and Customer Engagement

  • Did the engineer listen,show empathy or explain the installation?

  • Why?

  • Was V/C requested,router and download of Apps?

  • Why?

  • Were ACE,VIP and Apps discussed

  • Why?

  • Was SHOP used?

  • Why?

  • Was an adequate showcase provided?

  • Why?

  • Was the quick guide left and survey promoted?

  • Why?

On site efficiency (External)

  • Has the engineer carried out a risk assessment?

  • Why?

  • Are they visually checking the system?

  • Why?

  • Does the engineer have the correct H&S

  • Why?

  • Are they following SSOW?

  • Why?

  • Was a full data and mini logger carried out?

  • Why?

  • Blast plates,eyebolt plugs fitted,rubbish cleared.

  • Why?

On site efficiency (internal)

  • Have compression F connectors been fitted?

  • Why?

  • Have loggers been taken & attached?

  • Why?

  • Why?

  • Has iknow2 or Home hub been referenced?

  • Why?

  • Have a wi-if and throughput test been run?

  • Why?

  • Are all settings and leads compliant?

  • Why?

  • Has a Chrome App been run?

  • Why?

Van Layout

  • Is the van tidy?

  • Why?

  • How often do they visit their lock box?

  • Are all items required each time?

  • Why?

  • Do they group items together?

  • Why?

  • Are items left on display?

  • Why?

Van and stock management

  • Is the engineer managing stock efficiently?

  • Why?

  • Is the engineer correctly allocating stock?<br>

  • Why?

  • Do they keep a record of stock issued?

  • Why?

  • Is the engineer correctly uplifting stock?

  • Why?

  • Are faulty STB’s returned within 48 hours?

  • Why?

  • Has any coaching been given or IDD’s been recorded?

  • What coaching or performance actions have been put in place following the visit?

  • Upload media for any coaching given

  • Team Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.