Information
-
Document No.
-
Audit Type
- Site Candidate
- HUB Site
- FAN Site
- Shared Space
- Optus Services
- Commercial Building
- Other
-
Audit Type
-
Site Number
- 1
- 2
- 3
- 4
- 5
- 6
-
Site Name
-
Location
-
Height above Sea Level (m)
-
Height AGL (m)
-
Candidate Name
-
Surveyed by
-
Conducted on
-
Survey Sign-off
Building Details
BUILDING DETAILS
Building Tenant List
-
Enter Tenant Details
Tenant
-
Suite/Unit/Level No.
-
Tenant Name
-
Tenant Contact Number
Building Owner - Specific Requirements
-
Details
Access Summary
-
Pedestrian Access
-
Details
-
Show Photos of Issues
-
Vehicular Access
-
Details
-
Show Photos of Access issues
-
Security
-
Details
Functional Requirements
FUNCTIONAL REQUIREMENTS
Security Access
-
Site Characteristics
- Besser Brick
- Purpose Built
- Double Brick
- Pre-Cast Concrete
- Caged Area
-
Photos of Proposed Equipment Area
-
-
Sketch Floor Plan
-
Vandalism
-
Enter Details
-
Take photos of Vandalism
Access: Pedestrian Stairs, Door Width, Floor Loading, Lift Capacity
-
Pedestrian Stairs?
-
Take photos
Access: Vehicular, Driveway, Bridges, All weather
-
Vehicular Access?
-
Driveway Access?
-
Bridges?
-
All weather access?
-
Fencing (if required or available)
-
Take Photos
-
Bush Fire Risk
Physical
-
Water Ingress, Proofing, Any Risks?
-
Photos of Ingress/Proofing issues
-
Site Level?
-
Details
-
Take Photos
Electricity
-
Location of Mains Supply
-
Location of 3 Phase Power
-
Site has separate Distribution Board?
-
Suggested External generator connect points (only for FAN Sites)
Air Conditioning
-
Existing?
-
Capacity adequate?
-
Details
-
Photo of Air Conditioning
Construction Requirements
CONSTRUCTION REQUIREMENTS
Site Type
-
Roof Top/Existing Structure
- Concrete Slab
- Flat Metal Deck
- Tiled Roof
- Bulk Insulated
- Reflective Insulation
- Corrugated Fibro
- Raised Roof
-
Greenfield - Fit-out required?
- Construct
- Walls
- Demolish
- Door
- Partition
- Cage
- Ceiling
- Insulation
- Block work
-
Co-Locate Private Owner?
-
Co-Locate other Telco?
-
Other Telco
- Telstra
- Uecomm
- Pipe
- Vodafone
- Powertel
- Other
-
Name Other Telco
-
Photos of Proposed Space
-
Sketch of Floor Plan
Construction Access
-
Access Restrictions
-
Access Restrictions/Details
-
Photos of Access Issues
Cable Ladder Run
-
Cable Ladder Details
-
Length of Cable Ladder Run
-
Photos of Existing Cable Ladder
Steel Work
-
Steel work required?
-
Details
Sky Lift
-
Sky-Lift required?
-
Details
Site Condition
-
Needs Rectification?
-
Details
-
Photos of Site Condition
WHS
-
Acceptable?
-
Details
DA/BCC Permitting
-
Permitting Body
-
Permitting Body
Access Road
-
Access Road required?
-
Distance Required?
-
Photos of Access Road
Environmental
ENVIRONMENTAL
Heritage Listings
-
Heritage / Conservation Area?
Sensitive Area
-
Close to sensitive land use?
-
Details
Zoning
-
Zoning Type?
Vegetation Clearing
-
Vegetation Clearing required?
-
Details
-
Photo of Vegetation Issues
Design
DESIGN
Optus Network Requirements
Obstructions/Difficulties
-
Conduit/Route Issues
-
Details
-
Heritage Issues?
-
Details
-
Traffic Management Requirements?
-
Details
Building Entry
-
Type
-
Runway required?
Building Riser
-
Riser / Runway
Commercial
COMMERCIAL
Initial Discussions
-
Statement of Owner / Manager Interest
-
Additional Comments
Unnaceptable Internal "No-Go" Locations
UNACCEPTABLE INTERNAL "NO-GO" LOCATIONS
Internal
Important Notes Relating to Strata Owned Buildings and Adjacent Buildings
Unacceptable External "No-Go" Locations
Contact Details
Contact Details
-
RE Consultant
-
Survey Company Contact
-
Telephone
-
Mobile
-
Optus AE Planner
-
Optus CD Engineer
Optus Site Inspection
-
Optus Site Inspection required?
-
Optus Customer Delivery required?
Site Details
SITE DETAILS
Contacts
Site Manager
-
Contact Name
-
Position
-
Add location
-
Phone
-
e-mail
-
Mobile
-
Fax
Site Owner
-
Contact Name
-
Position
-
Add location
-
e-mail
-
Phone
-
Mobile
-
Fax
Type of Site
-
Details
-
Details
EQUIPMENT DETAILS
Equipment Racks
-
Rack/Equipment Details
Equipment Rack
-
Rack Location Code
-
Installation Status?
-
No Rack Units?
- 9RU (400.45mm)
- 12RU (533.4mm)
- 27RU (1200.15mm)
- 36RU (1600.2mm)
- 39RU (1733.55mm)
- 45RU (2000.25mm)
- 46RU (2044.7mm)
- OTHER
-
Floor Level
- B1
- G0
- R0
- 01
- P1
- OTHER
- GV
- RV
-
Suite Number
- 00
- 01
- 02
- 03
- 04
- Other
-
Rack Number
- F01
- F02
- F03
- F04
- R01
- R02
- R03
- R04
- R05
-
Subrack Equipment
Subrack
-
Equipment Type
- OTHER
- A1642EM (2RU)
- A1642EMC (1RU)
- A1662 (5RU)
- A1692 (9RU)
- ANDREW ACU (1RU)
- AIR GAP REQUIRED (1RU)
- BATTERY STRING
- BLANKING PLATE
- CABLE MANAGER
- CX600-X1 (3RU)
- CX600-X2
- DSX-28
- FLATPACK
- FLM150E
- FLM600
- FLM2400
- FMT(1RU)
- FNTE 1RU)
- HUAWEI S3328-CPE (1RU)
- KATHRIEN CCU (1RU)
- KRONE-150 (3RU)
- KRONE-128 (3RU)
- LGX-12 (1RU)
- LGX-24 (2RU)
- LGX-36 (2RU)
- LGX FPP-36 (3RU)
- MNI RADIO
- NOKIA DM2
- PDU 48v
- SPLITTER/COUPLER (1RU)
- RECTIFIER
- APDP
- FIU 19E EXT (1RU)
- FiU 19E MAIN (1RU)
- PANDUIT CMT (1RU)
-
Height (RU)
- 1RU (44.45mm)
- 2RU (88.9mm)
- 3RU (133.35mm)
- 4RU (177.8mm)
- 5RU (222.25mm)
- 6RU (266.7mm)
- 7RU (311.15mm)
- 8RU (355.6mm)
- 9RU (400.05mm)
- 10RU (444.5mm)
- 11RU (488.95mm)
- 12RU (533.4mm)
-
Position (RU)
- 045 (2000.25mm)
- 044 (1955.8mm)
- 043 (1911.35mm)
- 042 (1866.9mm)
- 041 (1822.45mm)
- 040 (1778mm)
- 039 (1733.5mm)
- 038 (1689.1mm)
- 037 (1644.65mm)
- 036 (1600.2mm)
- 035 (1555.75mm)
- 034 (1511.3mm)
- 033 (1466.85mm)
- 032 (1422.4mm)
- 031 (1377.95mm)
- 030 (1333.5mm)
- 029 (1289.05mm)
- 028 (1244.6mm)
- 027 (1200.15mm)
- 026 (1155.7mm)
- 025 (1111.25mm)
- 024 (1066.8mm)
- 023 (1022.35mm)
- 022 (977.9mm)
- 021 (933.45mm)
- 020 (889mm)
- 019 (844.55mm)
- 018 (800.1mm)
- 017 (755.75mm)
- 016 (711.2mm)
- 015 (666.75mm)
- 014 (622.3mm)
- 013 (577.85mm)
- 012 (533.4mm)
- 011 (488.95mm)
- 010 (444.5mm)
- 009 (400.05mm)
- 008 (355.6mm)
- 007 (311.15mm)
- 006 (266.7mm)
- 005 (222.25mm)
- 004 (177.8mm)
- 003 (133.35mm)
- 002 (88.9mm)
- 001 (44.45mm)
-
Installation Status