Information

  • Document No.

  • Waste Facility Site Visit

  • Waste Facility visit day/time

  • Prepared by

  • Waste Facility location details

People present at the time of inspection

  • Name and signature

  • Name and signature

  • Name and signature

  • Name and signature

Waste Facility details

  • Waste Facility License Number

  • Photo of Waste facility

Tour of Waste Facility

  • Are cement returns currently being managed on site?

  • What other waste type does the facility manage?

  • Photos of site tour with detailed annotations

  • Details of photo

  • Photos of site tour with detailed annotations

  • Details of photo

  • Photos of site tour with annotation

  • Details of photo

  • Photos of site tour with annotation

  • Details of photo

  • Photos of site tour with annotation

  • Details of photo

  • Photos of site tour with annotation

  • Details of photo

  • Photos of site tour with annotation

  • Details of photo

  • Photos of site tour with annotation

  • Details of photo

  • Photos of site tour with annotation

  • Details of photo

  • What type of equipment is used on site for management of cement returns

  • List of equipment and explanation

  • Photo of equipment

  • Details of photo

  • Photo of equipment

  • Details of photo

  • Photo of equipment

  • Details of photo

  • Photo of equipment

  • Details of photo

  • Photo of equipment

  • Details of photo

Technical information

  • How long does it take to crush a certain amount of cement? (Eg. One cement ring)

  • What is the average size of 'as received' cement (managed without a crusher and sizer)?

  • What is the current capacity of the equipment on site

  • What is the size of the cement after 5 passes (with a spiked roller/ road roller)

  • What is the size of the cement after 10 passes (with a spiked roller/ road roller)

  • Other details?

Compliance check

  • Is there a logical receiving method eg. Weighing platform where samples are taken and the unloading area decided?

  • Does the person conducting the tour know the daily/annual limits for receiving of drill fluids/grey water?

General information

  • Further information

Commercial information

  • What would it cost for varying levels of service for cement returns management? Eg. Crusher, sizer, transport

  • What is the operational cost of equipment? (Including time) Eg. Price per tonne of cement

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.