Information
KCM Inspection - Harm from Mobile Plant (Rev4)
-
Origin Operations Area: ( i.e. Combabula)
-
Detailed Location:
-
Contractor:
-
Conducted on
-
Inspection Team
-
Describe Task or Activity being Conducted:
KCM Inspection - Harm from Mobile Plant (Rev3)
-
Vehicle Movement Plan is in place and effective?<br><br>( A high score here indicates an effective TMP- workers could explain TMP requirements & how they are implemented )
-
Plant/ traffic signage in place and effective?<br><br>( A high score here indicates clear signage with correctly named operator and barricade fully extended across ROW. Team can explain access to Plant Operation Zone)
-
Evidence of positive communications for traffic matters?<br><br>( A high score indicates positive communication = when both parties participate - the work team can explain when Positive Communication is required)
-
Only trained and competent persons operate mobile equipment?<br><br>(A high score here indicates workers have the correct training/licence for the work being undertaken- workers could explain the training and/or VOC process as it applies to the task being undertaken)
-
SWMS identify mobile plant risks and offer suitable controls?<br><br>( A high score indicates SWMS are correctly filled out, recently reviewed by work team, all task risks included. Controls identified in SWMS are in place & known by work crew .)
-
Additional Controls for ' On the Job / On the Day' risks ?<br><br>( A high score here indicates additional controls are listed in permits and/or Job Start Cards. E.g. Hot Day= Drink fluids. Workers can explain why additional controls have been implemented)
-
Work team has the ability to effectively respond to an emergency ? <br><br>( A high score here indicates workers could explain/describe - Communication, Emergency Contacts, First Aiders and First Aid kits, Muster Points etc)
-
Work Team demonstrates knowledge of the Life-Saving Rules / CPB Safety Essentials and the application of those to the task at hand?<br><br>(A high score here indicates the team know the specific lifesaving rules that apply to the task.
Comments
Additional Comments
-
Comments
-
Photo of Task being performed
Inspection Team
Contractor Representative
-
Name:
-
Role:
Origin Energy Representative
-
Name:
-
Role: