APLNG - Field CSG Projects Permit to Work Inspection .

  • Origin Operations Area: ( e.g. Combabula )

  • Detailed Work Location:

  • Contractor:

  • Conducted on

  • Prepared by

  • Inspection Team:

  • Describe the Task or Activity being Conducted:

  • Do the details on the permit adequately describe the work location, the equipment an the exact scope of works?

  • Is the permit correctly dated and all mandatory sections filled in and signed where applicable?

  • Is the permit within the validity period?

  • Is the permit within the validity period?

  • Has Permit Issue and Acceptance section been completed by the Permit Authority , Permit Issuer and Permit Holder?

  • Are all signatories suitably trained and competent in the relevant Permit to Work Procedure?

  • Is the permit located within the vicinity of the work group on site ?

  • At work completion are the permit holder's copy of the permit and applicable records e.g. Gas Monitoring returned to the permit issuer?

Involvement

  • Is the permit holder available at the work place ?

  • All required additional certificates and supporting documentation referenced and accompanying the permit e.g. Gas Testing

  • Are Isolations correctly specified, tagged and verified by the Permit Holder prior to starting the task?

  • Is Gas Monitoring being conducted by trained persons and results recorded?

  • If Gas monitoring is required has the Gas Detector been bump tested ?

Communication

  • Are additional controls referenced on the permit e.g. (Gas Test, Isolation etc)

  • Have the controls been communicated to the work crew?

  • All persons required to work under the permit are Permit Worker trained and understand the Permit to Work Procedure?

  • Where underground services exist have the service locations been located, marked and communicated to the work team?

  • Where overhead services exist is the exclusio zone and the height of operational plant documented ? Are signs and spotter in place if required?

Risk Management

  • Is the risk assessment approved and documented as part of the permit or attached permit?

  • Does the Risk Assessment (TRA/ SHEWMS etc.) description match the permitted task description?

  • Are appropriate hazards identified in the risk management document?

  • Are effective controls listed for each hazard and are these controls being carried out?

  • Does the risk assessment provide details of the competence required of persons conducting the task?

  • Have possible conflicts with other teams in the area been identified ( SIMOPS) ?

  • Have the work party members read, understood and signed onto the Risk Assessment Tool. ( e.g. TRA, SHEWMS of JHA)?

  • Have personal risk assessments been conducted e.g. ( Take 5, Job Start Cards) ?

Comments

Additional Comments

  • Comments

Signoff

Contractor Representative

  • Role:

  • Signature

Origin Energy Representative

  • Role:

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.