Title Page
-
Site ID & Name
-
What3Words
-
Report Type
-
Visit Date
-
Completed by:
-
Onsite/Offsite
-
Site type
-
FEx/ FAC version
-
FEx phase
-
FEx / FAC serial number
-
Power supply
Witness Testing Report
ORT
Cabin Rooms
-
IT ROOM DOORS OPERATION
-
IT ROOM DOORS - HINGES & LOCKS LUBRICATED
-
PLANT ROOM DOORS OPERATION
-
PLANT ROOM DOORS - HINGES & LOCKS LUBRICATED
-
INTERNAL LIGHTING CHECKED & WORKING - NORMAL AND EMERGENCY
-
EXTERNAL LIGHTING CHECKED & WORKING
-
ROOM CLEAN AND CLEAR OF WASTE MATERIALS INCLUDING ALL EQUIPMENT
-
FLOOR COVERING SAFE AND SECURE
-
WALLS CLEAN WITH NO UNAUTHORISED NOTICES
-
FIRST AID BOXES CHECKED AND COMPLETE
-
ALL CCTV CAMERAS FIELD OF VIEW CHECKED
-
CCTV CAMERA OPERATION CONFIRMED (DAY & NIGHT VISION)
-
ALL INTRUDER PIR SENSORS WORKING
-
FIRE SUPPRESSION GAUGES IN GREEN AREA
-
FIRE SUPPRESSION SOLENOID INSTALLED
-
FIRE SUPPRESSION SOLENOID PIN TAG INSTALLED
-
FIRE ALARM PANEL IN AUTOMATIC WHEN CABIN IS LOCKED
-
FLOOR/FIRE ALARM PLAN PRESENT AND UP TO DATE
-
MCB ALLOCATION SHEETS PRESENT AND UP TO DATE
-
13A 230VAC SOCKETS ALL WORKING
-
EQUIPMENT RACKS SECURE, OPERATION OF DOORS, BLANKS IN PLACE, PINCODES SET
-
AC DISTRIBUTION BOARDS INSPECTED (NO MCBs TRIPPED)
-
DC DISTRIBUTION BOARDS INSPECTED (NO MCBs TRIPPED)
-
KEY SAFES POPULATED, ALL DOORS ON ALL EQUIPMENT LOCKING/OPENING CORRECTLY
-
ODF RACKS SECURED, OPERATION OF DOORS, PINCODES SET
-
ALL LABELLING IN PLACE AND CORRECT
-
CABLE CONTAINMENT SECURED AND ROUTED CORRECTLY
-
ROXTEC GLANDS INSTALLED CORRECTLY
-
NO MECHANICAL OR PAINT DEFECTS TO CABIN
-
DRIP TRAYS IN PLACE AND POSITIONED CORRECTLY
-
EXTERNAL CABLE DUCTS IN PLACE, SECURE & CORRECTLY ALIGNED
-
GENERATOR VENTILATION AND EXHAUST DUCTING IN PLACE AND FREE FROM LEAKS
-
A/C CONDENSORS CORRECTLY SITED AND SECURITY CAGES IN PLACE
-
ALL A/C PIPEWORK AND CABLING CORRECTLY POSITIONED, SECURED & UNDAMAGED
-
DETAILED ELECTRICAL DRAWINGS & DOCUMENTATION HAVE BEEN PROVIDED
-
ELECTRICAL TESTS HAVE BEEN PERFORMED TO BS7671:2018 & CERTIFICATION PROVIDED
-
ALL SOFTWARE, MANUALS AND ACCESSORIES HAVE BEEN PROVIDED
General (All Sites)
-
FIBRE TRUNKING AND TRAY FITTED CORRECTLY
-
FIBRE OUTLETS CORRECTLY ALIGNED
-
CABLE BASKET CORRECTLY ALIGNED TO ROXTEC GLANDS TO FACILITATE MINIMUM BEND RADIUS
-
EQUIPMENT RACKS CORRECTLY INSTALLED AND DOOR OPERATION VERIFIED
-
BLANKING PLATES INSTALLED IN ALL RACKS
-
GSM ANTENNAS, MOUNTING POLES & CABLING INSTALLED CORRECTLY
-
CABIN SKIRTING INSTALLED CORRECTLY
-
GENERATOR BOLTED DOWN USING ALL FIXING POINTS
-
SECURITY CAGES INSTALLED CORRECTLY
General (Compound Sites)
-
EXTERNAL DUCTWORK FROM ADSL CABINET INSTALLED CORRECTLY
-
ALL EQUIPMENT MOUNTED AND FIXED CORRECTLY AND SECURELY
-
A/C PIPEWORK & CABLING COVERS IN PLACE
-
ALIGNMENT OF DUCTS TO ROXTEC GLANDS INSPECTED - AT LEAST 50% OF DUCT MUST BE IN LINE WITH GLAND
-
ALL DNO/GENERATOR DUCTS SEALED
-
DNO CABINET FLOOR SEALED
General (Warehouse Sites)
-
ALL A/C AND GENERATOR DUCTING SECURE AND SEALED
-
DUCTWORK ENTERING WAREHOUSE ENDS 50mm ABOVE FLOOR LEVEL & IN LINE WITH SITE TRAY WORK
-
ALL WAREHOUSE TRAY WORK INSTALLED TO ENSURE CABLE ROUTES DO NOT OBSCURE OTHER SERVICES
-
NO SHARP EDGES ON TRAY WORK OR ANY OTHER METAL WORK
-
CORRECT ALIGNMENT OF SITE BASKET WORK WITH CONTAINER ROXTEC GLANDS
Alarms testing
-
1 CONTAINER INTRUDER ALARM UNSET
-
2 CONTAINER INTRUDER ALARM ACTIVATED
-
3 CONTAINER INTRUDER ALARM FAULT
-
4 IT ROOM DOOR OPEN
-
5 PLANT ROOM DOOR OPEN
-
6 HOT AISLE DOOR OPEN
-
7 EM EXIT DOOR OPEN
-
8 CONTAINER FIRE ALARM FAULT
-
9 CONTAINER FIRE ALARM ACTIVATED
-
10 CONTAINER FIRE ALARM MANUAL MODE
-
11 CONTAINER FIRE SUPPRESSION GAS DISCHARGED
-
12 PLANT ROOM VESDA FAULT
-
13 PLANT ROOM VESDA ACTIVATED
-
14 IT ROOM VESDA FAULT
-
15 IT ROOM VESDA ACTIVATED
-
16 SPARE
-
17 SPARE
-
18 IT ROOM COOLING SYSTEM 1 FAULT
-
19 IT ROOM COOLING SYSTEM 2 FAULT
-
20 IT ROOM COOLING SYSTEM 3 FAULT
-
21 IT ROOM COOLING SYSTEM 4 FAULT
-
22 PLANT ROOM COOLING SYSTEM 1 FAULT
-
23 PLANT ROOM COOLING SYSTEM 2 FAULT
-
24 UPS 1 LOAD ON BYPASS
-
25 UPS 1 BATTERY LOW
-
26 UPS 1 BATTERY ON DISCHARGE
-
27 UPS 1 POWER MODULE FAULT
-
28 UPS 1 BATTERY TEST FAIL
-
29 UPS 1 BYPASS STATIC SWITCH FAIL
-
30 UPS 2 LOAD ON BYPASS
-
31 UPS 2 BATTERY LOW
-
32 UPS 2 BATTERY ON DISCHARGE
-
33 UPS 2 POWER MODULE FAULT
-
34 UPS 2 BATTERY TEST FAIL
-
35 UPS 2 BYPASS STATIC SWITCH FAIL
-
36 DC SYSTEM A MAINS ALARM
-
37 DC SYSTEM A LOAD FUSE ALARM
-
38 DC SYSTEM A MINOR ALARM
-
39 DC SYSTEM A MAJOR ALARM
-
40 DC SYSTEM B MAINS ALARM
-
41 DC SYSTEM B LOAD FUSE ALARM
-
42 DC SYSTEM B MINOR ALARM
-
43 DC SYSTEM B MAJOR ALARM
-
44 MAINS FAIL RELAY
-
45 SURGE ARRESTOR ACTIVATED
-
46 LONE WORKER ALARM
-
47 WATER LEAK ALARM
-
48 FREE COOLING FAN SYSTEM
-
49 SPARE
-
50 SPARE
-
51 GENERATOR FAULT
-
52 GENERATOR RUNNING
-
53 BUILDING FIRE ALARM FAULT
-
54 BUILDING FIRE ALARM ACTIVATED
-
55 BUILDING INTRUDER ALARM UNSET
-
56 BUILDING INTRUDER ALARM ACTIVATED
-
57 BUILDING INTRUDER ALARM FAULT
-
58 SPARE
-
59 SPARE
-
60 SPARE
-
61 SPARE
-
62 SPARE
-
63 SPARE
-
64 SPARE
Alarms - Outputs
-
IT ROOM DOOR REMOTE OPEN/CLOSE
-
PLANT ROOM DOOR REMOTE OPEN/CLOSE
-
BUILDING DOOR REMOTE OPEN/CLOSE
-
GENERATOR REMOTE STOP/START
Alarms - Inputs
-
PLANT ROOM TEMPERATURE
-
HOT AISLE TEMPERATURE
-
COLD AISLE TEMPERATURE
-
IT ROOM HUMIDITY
Alarms - Additional Checks
-
MAINS FAIL GENERATOR AUTO START
-
FREE COOLER DAMPER CLOSES ON IT RM VESDA FIRE
-
4 X IT ROOM ACU ALARMS ON MAINS FAIL OF LG CONTROLLER
CCTV (Named, positioned, cover fitted, picture checked)
-
IP Address
-
Camera 1
-
Camera 2
-
Camera 3
-
Camera 4
-
Camera 5
-
Camera 6
-
Camera 7
-
Camera 8
Air Conditioning Units (ACU's)
-
TEMPERATURE READING FROM LG CONTROLLER
-
FREE FROM ALARMS
-
FILTERS CLEAN AND SERVICEABLE
-
FUNCTIONING NORMALLY
-
TEMPERATURE CONTROL IT ROOM
-
TEMPERATURE CONTROL PLANT ROOM
Generator
-
IP Address and configuration
-
Fuel level
-
Mobile generator connection point- distance to gate/ external location
-
Generator functional test
-
Mains fail on load test
-
Total generator run time at end of testing
TEST SITE & RACK DOOR CODES (& OVERRIDE KEY ACCESS)
-
CONTAINER DATA ROOM DOOR
-
CONTAINER PLANT ROOM DOOR
-
RACK 1
-
RACK 2
-
RACK 3
-
RACK 4
-
RACK 5
-
RACK 6
-
RACK 7
-
RACK 8
-
RACK 9
-
RACK 10
-
HALF RACK 11A
-
HALF RACK 11B
-
HALF RACK 12A
-
HALF RACK 12B
-
KEY BOX 1
-
KEY BOX 2
-
WEST ODF
-
EAST ODF
KEYBOX 1 CHECK
-
Digital code combination tested
-
1. PLANT ROOM
-
2. IT ROOM
-
3. WAREHOUSE FIRE PANEL
-
4. CABIN FIRE PANEL ENCLOUSURE&AUTO MANUAL KEY
-
5. MAIN POWER OVERIDE (FIRE PANEL)
-
6. FIRE SUPPRESSION CUPBOARD
-
7. UPS RACK
-
8. BREAK GLASS OVERRIDE
-
9. HALF RACKS
-
10. FULL RACKS
-
11. ODF RACKS
-
12. GENERATOR ENCLOSURE
-
13. GENERATOR INTERNAL PANEL
-
14. CCTV CAB
-
15. BATTERY ISOLATOR
-
16. EMERGENCY LIGHT TEST KEY
-
17. ADJACENT KEY CASE
-
18. MAIN DOORS WAREHOUSE
-
19. DNO SUPPLY CUPBOARD
-
20. OFFICES
-
21. SHUTTER BOLLARD
-
22. ROLLER SHUTTER
-
23. WAREHOUSE DIS BOARD
-
24. CONTAINER DIS PANEL
-
FOBS
KEYBOX 2 CHECK
-
Digital code combination tested
-
1. PLANT ROOM
-
2. IT ROOM
-
3. WAREHOUSE FIRE PANEL
-
4. CABIN FIRE PANEL ENCLOUSURE&AUTO MANUAL KEY
-
5. MAIN POWER OVERIDE (FIRE PANEL)
-
6. FIRE SUPPRESSION CUPBOARD
-
7. UPS RACK
-
8. BREAK GLASS OVERRIDE
-
9. HALF RACKS
-
10. FULL RACKS
-
11. ODF RACKS
-
12. GENERATOR ENCLOSURE
-
13. GENERATOR INTERNAL PANEL
-
14. CCTV CAB
-
15. BATTERY ISOLATOR
-
16. EMERGENCY LIGHT TEST KEY
-
17. ADJACENT KEY CASE
-
18. MAIN DOORS WAREHOUSE
-
19. DNO SUPPLY CUPBOARD
-
20. OFFICES
-
21. SHUTTER BOLLARD
-
22. ROLLER SHUTTER
-
23. WAREHOUSE DIS BOARD
-
24. CONTAINER DIS PANEL
-
FOBS
IT & Plant Room (Access Control)
-
Keypad Entry/ Exit Serviceable
-
Doors programmed (Paxton)?
-
COSMO NFC tags installed, FSA Entry/ Exit tested
-
All doors operate and close correctly
-
All door hinges, closing mechanisms and locks functional
-
Comments
Key Handover to Securitas
-
Date:
-
Time:
-
Securitas representative:
-
Number of keys handed over:
-
Comments:
Site Overview
-
External Overview building/ compound
-
External Overview gates/ padlocks/ entry routes
-
External Overview FEx
-
External Overview Generator
-
External Overview ACU equipment
-
External Overview DNO
-
Internal Overview IT Room
-
Internal Overview Power Room
-
Internal Overview Gas Suppression Cabinet
Health & Safety
Medical/Fire
-
1 Eye Wash <br>(if applicable)<br>BUILDING
-
1 Eye Wash <br>(if applicable)<br>DATA/IT
-
1 Eye Wash <br>(if applicable)<br>POWER/PLANT
-
2 First Aid Kit<br>BUILDING
-
2 First Aid Kit<br>DATA/IT
-
2 First Aid Kit<br>POWER/PLANT
-
3 Fire System (Auto to Manual)<br>BUILDING
-
3 Fire System (Auto to Manual)<br>DATA/IT
-
3 Fire System (Auto to Manual)<br>POWER/PLANT
-
4 Fire Extinguishers<br>BUILDING
-
4 Fire Extinguishers<br>DATA/IT
-
4 Fire Extinguishers<br>POWER/PLANT
Signage
-
5 Fire Evacuation <br>ALL AREAS
-
6 Emergency Evacuation Area (Identified, Safe & Clear) Suite 1 & Suite 2 Emergency Door signage present FEx<br>ALL AREAS
-
7 Electrical Safety <br>ALL AREAS
-
8 Suite 1 & Suite 2 FEx designation signage present <br>FEx
-
9 Suite 1 & Suite 2 IT Room Door signage present <br>FEx
-
10 Suite 1 & Suite 2 Power Room Door signage present<br>FEx
-
11 Suite 1 & Suite 2 Generator designation signage present <br>Generator
-
Miscellaneous
-
12 Ear plug dispenser<br>BUILDING
-
13 Earth Tapes/Rod Covers Safe and Flush<br>BUILDING
-
14 Fibre Chambers, Covers and Locks (intact and servicable)<br>OTHER
-
15 Fuel Spill Kit Available - Generator <br>BUILDING
-
16 Lone Worker Alarm (Verify With NOC Whilst Sounding)<br>DATA/IT
-
17 Disease<br>ALL AREAS
-
18 Hazardous Substances - Stored or leaking<br>ALL AREAS
-
19 Non-ionising Radiation<br>ALL AREAS
-
20 Access / Egress Obstructions & Hazards<br>ALL AREAS
-
21 Fire Hazards<br>ALL AREAS
-
22 Infestation (Insects, Rodents, Birds)<br>ALL AREAS
-
23 Trip and Slip Hazards<br>ALL AREAS
-
24 Weather<br>ALL AREAS
-
25 Utility Hazards (Gas/Electric/Water)<br>ALL AREAS
-
26 Encroaching Vegetation<br>BUILDING
SNAGS
ORT SNAGS
-
SNAG 1
-
Details:
-
Assigned to:
-
Category:
-
SNAG 2
-
Details:
-
Assigned to:
-
Category:
-
SNAG 3
-
Details:
-
Assigned to:
-
Category:
-
SNAG 4
-
Details:
-
Assigned to:
-
Category:
-
SNAG 5
-
Details:
-
Assigned to:
-
Category:
-
SNAG 6
-
Details:
-
Assigned to:
-
Category:
-
SNAG 7
-
Details:
-
Assigned to:
-
Category:
-
SNAG 8
-
Details:
-
Assigned to:
-
Category:
-
SNAG 9
-
Details:
-
Assigned to:
-
Category:
-
SNAG 10
-
Details:
-
Assigned to:
-
Category:
-
OTHER SNAGS
-
Details:
-
Assigned to:
-
Category:
Completion
-
Report Details
-
Engineers Name and Signature