Title Page

  • Site ID & Name

  • What3Words

  • Report Type

  • Visit Date

  • Completed by:

  • Onsite/Offsite

  • Site type

  • FEx/ FAC version

  • FEx phase

  • FEx / FAC serial number

  • Power supply

Witness Testing Report

ORT

Cabin Rooms

  • IT ROOM DOORS OPERATION

  • IT ROOM DOORS - HINGES & LOCKS LUBRICATED

  • PLANT ROOM DOORS OPERATION

  • PLANT ROOM DOORS - HINGES & LOCKS LUBRICATED

  • INTERNAL LIGHTING CHECKED & WORKING - NORMAL AND EMERGENCY

  • EXTERNAL LIGHTING CHECKED & WORKING

  • ROOM CLEAN AND CLEAR OF WASTE MATERIALS INCLUDING ALL EQUIPMENT

  • FLOOR COVERING SAFE AND SECURE

  • WALLS CLEAN WITH NO UNAUTHORISED NOTICES

  • FIRST AID BOXES CHECKED AND COMPLETE

  • ALL CCTV CAMERAS FIELD OF VIEW CHECKED

  • CCTV CAMERA OPERATION CONFIRMED (DAY & NIGHT VISION)

  • ALL INTRUDER PIR SENSORS WORKING

  • FIRE SUPPRESSION GAUGES IN GREEN AREA

  • FIRE SUPPRESSION SOLENOID INSTALLED

  • FIRE SUPPRESSION SOLENOID PIN TAG INSTALLED

  • FIRE ALARM PANEL IN AUTOMATIC WHEN CABIN IS LOCKED

  • FLOOR/FIRE ALARM PLAN PRESENT AND UP TO DATE

  • MCB ALLOCATION SHEETS PRESENT AND UP TO DATE

  • 13A 230VAC SOCKETS ALL WORKING

  • EQUIPMENT RACKS SECURE, OPERATION OF DOORS, BLANKS IN PLACE, PINCODES SET

  • AC DISTRIBUTION BOARDS INSPECTED (NO MCBs TRIPPED)

  • DC DISTRIBUTION BOARDS INSPECTED (NO MCBs TRIPPED)

  • KEY SAFES POPULATED, ALL DOORS ON ALL EQUIPMENT LOCKING/OPENING CORRECTLY

  • ODF RACKS SECURED, OPERATION OF DOORS, PINCODES SET

  • ALL LABELLING IN PLACE AND CORRECT

  • CABLE CONTAINMENT SECURED AND ROUTED CORRECTLY

  • ROXTEC GLANDS INSTALLED CORRECTLY

  • NO MECHANICAL OR PAINT DEFECTS TO CABIN

  • DRIP TRAYS IN PLACE AND POSITIONED CORRECTLY

  • EXTERNAL CABLE DUCTS IN PLACE, SECURE & CORRECTLY ALIGNED

  • GENERATOR VENTILATION AND EXHAUST DUCTING IN PLACE AND FREE FROM LEAKS

  • A/C CONDENSORS CORRECTLY SITED AND SECURITY CAGES IN PLACE

  • ALL A/C PIPEWORK AND CABLING CORRECTLY POSITIONED, SECURED & UNDAMAGED

  • DETAILED ELECTRICAL DRAWINGS & DOCUMENTATION HAVE BEEN PROVIDED

  • ELECTRICAL TESTS HAVE BEEN PERFORMED TO BS7671:2018 & CERTIFICATION PROVIDED

  • ALL SOFTWARE, MANUALS AND ACCESSORIES HAVE BEEN PROVIDED

General (All Sites)

  • FIBRE TRUNKING AND TRAY FITTED CORRECTLY

  • FIBRE OUTLETS CORRECTLY ALIGNED

  • CABLE BASKET CORRECTLY ALIGNED TO ROXTEC GLANDS TO FACILITATE MINIMUM BEND RADIUS

  • EQUIPMENT RACKS CORRECTLY INSTALLED AND DOOR OPERATION VERIFIED

  • BLANKING PLATES INSTALLED IN ALL RACKS

  • GSM ANTENNAS, MOUNTING POLES & CABLING INSTALLED CORRECTLY

  • CABIN SKIRTING INSTALLED CORRECTLY

  • GENERATOR BOLTED DOWN USING ALL FIXING POINTS

  • SECURITY CAGES INSTALLED CORRECTLY

General (Compound Sites)

  • EXTERNAL DUCTWORK FROM ADSL CABINET INSTALLED CORRECTLY

  • ALL EQUIPMENT MOUNTED AND FIXED CORRECTLY AND SECURELY

  • A/C PIPEWORK & CABLING COVERS IN PLACE

  • ALIGNMENT OF DUCTS TO ROXTEC GLANDS INSPECTED - AT LEAST 50% OF DUCT MUST BE IN LINE WITH GLAND

  • ALL DNO/GENERATOR DUCTS SEALED

  • DNO CABINET FLOOR SEALED

General (Warehouse Sites)

  • ALL A/C AND GENERATOR DUCTING SECURE AND SEALED

  • DUCTWORK ENTERING WAREHOUSE ENDS 50mm ABOVE FLOOR LEVEL & IN LINE WITH SITE TRAY WORK

  • ALL WAREHOUSE TRAY WORK INSTALLED TO ENSURE CABLE ROUTES DO NOT OBSCURE OTHER SERVICES

  • NO SHARP EDGES ON TRAY WORK OR ANY OTHER METAL WORK

  • CORRECT ALIGNMENT OF SITE BASKET WORK WITH CONTAINER ROXTEC GLANDS

Alarms testing

  • 1 CONTAINER INTRUDER ALARM UNSET

  • 2 CONTAINER INTRUDER ALARM ACTIVATED

  • 3 CONTAINER INTRUDER ALARM FAULT

  • 4 IT ROOM DOOR OPEN

  • 5 PLANT ROOM DOOR OPEN

  • 6 HOT AISLE DOOR OPEN

  • 7 EM EXIT DOOR OPEN

  • 8 CONTAINER FIRE ALARM FAULT

  • 9 CONTAINER FIRE ALARM ACTIVATED

  • 10 CONTAINER FIRE ALARM MANUAL MODE

  • 11 CONTAINER FIRE SUPPRESSION GAS DISCHARGED

  • 12 PLANT ROOM VESDA FAULT

  • 13 PLANT ROOM VESDA ACTIVATED

  • 14 IT ROOM VESDA FAULT

  • 15 IT ROOM VESDA ACTIVATED

  • 16 SPARE

  • 17 SPARE

  • 18 IT ROOM COOLING SYSTEM 1 FAULT

  • 19 IT ROOM COOLING SYSTEM 2 FAULT

  • 20 IT ROOM COOLING SYSTEM 3 FAULT

  • 21 IT ROOM COOLING SYSTEM 4 FAULT

  • 22 PLANT ROOM COOLING SYSTEM 1 FAULT

  • 23 PLANT ROOM COOLING SYSTEM 2 FAULT

  • 24 UPS 1 LOAD ON BYPASS

  • 25 UPS 1 BATTERY LOW

  • 26 UPS 1 BATTERY ON DISCHARGE

  • 27 UPS 1 POWER MODULE FAULT

  • 28 UPS 1 BATTERY TEST FAIL

  • 29 UPS 1 BYPASS STATIC SWITCH FAIL

  • 30 UPS 2 LOAD ON BYPASS

  • 31 UPS 2 BATTERY LOW

  • 32 UPS 2 BATTERY ON DISCHARGE

  • 33 UPS 2 POWER MODULE FAULT

  • 34 UPS 2 BATTERY TEST FAIL

  • 35 UPS 2 BYPASS STATIC SWITCH FAIL

  • 36 DC SYSTEM A MAINS ALARM

  • 37 DC SYSTEM A LOAD FUSE ALARM

  • 38 DC SYSTEM A MINOR ALARM

  • 39 DC SYSTEM A MAJOR ALARM

  • 40 DC SYSTEM B MAINS ALARM

  • 41 DC SYSTEM B LOAD FUSE ALARM

  • 42 DC SYSTEM B MINOR ALARM

  • 43 DC SYSTEM B MAJOR ALARM

  • 44 MAINS FAIL RELAY

  • 45 SURGE ARRESTOR ACTIVATED

  • 46 LONE WORKER ALARM

  • 47 WATER LEAK ALARM

  • 48 FREE COOLING FAN SYSTEM

  • 49 SPARE

  • 50 SPARE

  • 51 GENERATOR FAULT

  • 52 GENERATOR RUNNING

  • 53 BUILDING FIRE ALARM FAULT

  • 54 BUILDING FIRE ALARM ACTIVATED

  • 55 BUILDING INTRUDER ALARM UNSET

  • 56 BUILDING INTRUDER ALARM ACTIVATED

  • 57 BUILDING INTRUDER ALARM FAULT

  • 58 SPARE

  • 59 SPARE

  • 60 SPARE

  • 61 SPARE

  • 62 SPARE

  • 63 SPARE

  • 64 SPARE

Alarms - Outputs

  • IT ROOM DOOR REMOTE OPEN/CLOSE

  • PLANT ROOM DOOR REMOTE OPEN/CLOSE

  • BUILDING DOOR REMOTE OPEN/CLOSE

  • GENERATOR REMOTE STOP/START

Alarms - Inputs

  • PLANT ROOM TEMPERATURE

  • HOT AISLE TEMPERATURE

  • COLD AISLE TEMPERATURE

  • IT ROOM HUMIDITY

Alarms - Additional Checks

  • MAINS FAIL GENERATOR AUTO START

  • FREE COOLER DAMPER CLOSES ON IT RM VESDA FIRE

  • 4 X IT ROOM ACU ALARMS ON MAINS FAIL OF LG CONTROLLER

CCTV (Named, positioned, cover fitted, picture checked)

  • IP Address

  • Camera 1

  • Camera 2

  • Camera 3

  • Camera 4

  • Camera 5

  • Camera 6

  • Camera 7

  • Camera 8

Air Conditioning Units (ACU's)

  • TEMPERATURE READING FROM LG CONTROLLER

  • FREE FROM ALARMS

  • FILTERS CLEAN AND SERVICEABLE

  • FUNCTIONING NORMALLY

  • TEMPERATURE CONTROL IT ROOM

  • TEMPERATURE CONTROL PLANT ROOM

Generator

  • IP Address and configuration

  • Fuel level

  • Mobile generator connection point- distance to gate/ external location

  • Generator functional test

  • Mains fail on load test

  • Total generator run time at end of testing

TEST SITE & RACK DOOR CODES (& OVERRIDE KEY ACCESS)

  • CONTAINER DATA ROOM DOOR

  • CONTAINER PLANT ROOM DOOR

  • RACK 1

  • RACK 2

  • RACK 3

  • RACK 4

  • RACK 5

  • RACK 6

  • RACK 7

  • RACK 8

  • RACK 9

  • RACK 10

  • HALF RACK 11A

  • HALF RACK 11B

  • HALF RACK 12A

  • HALF RACK 12B

  • KEY BOX 1

  • KEY BOX 2

  • WEST ODF

  • EAST ODF

KEYBOX 1 CHECK

  • Digital code combination tested

  • 1. PLANT ROOM

  • 2. IT ROOM

  • 3. WAREHOUSE FIRE PANEL

  • 4. CABIN FIRE PANEL ENCLOUSURE&AUTO MANUAL KEY

  • 5. MAIN POWER OVERIDE (FIRE PANEL)

  • 6. FIRE SUPPRESSION CUPBOARD

  • 7. UPS RACK

  • 8. BREAK GLASS OVERRIDE

  • 9. HALF RACKS

  • 10. FULL RACKS

  • 11. ODF RACKS

  • 12. GENERATOR ENCLOSURE

  • 13. GENERATOR INTERNAL PANEL

  • 14. CCTV CAB

  • 15. BATTERY ISOLATOR

  • 16. EMERGENCY LIGHT TEST KEY

  • 17. ADJACENT KEY CASE

  • 18. MAIN DOORS WAREHOUSE

  • 19. DNO SUPPLY CUPBOARD

  • 20. OFFICES

  • 21. SHUTTER BOLLARD

  • 22. ROLLER SHUTTER

  • 23. WAREHOUSE DIS BOARD

  • 24. CONTAINER DIS PANEL

  • FOBS

KEYBOX 2 CHECK

  • Digital code combination tested

  • 1. PLANT ROOM

  • 2. IT ROOM

  • 3. WAREHOUSE FIRE PANEL

  • 4. CABIN FIRE PANEL ENCLOUSURE&AUTO MANUAL KEY

  • 5. MAIN POWER OVERIDE (FIRE PANEL)

  • 6. FIRE SUPPRESSION CUPBOARD

  • 7. UPS RACK

  • 8. BREAK GLASS OVERRIDE

  • 9. HALF RACKS

  • 10. FULL RACKS

  • 11. ODF RACKS

  • 12. GENERATOR ENCLOSURE

  • 13. GENERATOR INTERNAL PANEL

  • 14. CCTV CAB

  • 15. BATTERY ISOLATOR

  • 16. EMERGENCY LIGHT TEST KEY

  • 17. ADJACENT KEY CASE

  • 18. MAIN DOORS WAREHOUSE

  • 19. DNO SUPPLY CUPBOARD

  • 20. OFFICES

  • 21. SHUTTER BOLLARD

  • 22. ROLLER SHUTTER

  • 23. WAREHOUSE DIS BOARD

  • 24. CONTAINER DIS PANEL

  • FOBS

IT & Plant Room (Access Control)

  • Keypad Entry/ Exit Serviceable

  • Doors programmed (Paxton)?

  • COSMO NFC tags installed, FSA Entry/ Exit tested

  • All doors operate and close correctly

  • All door hinges, closing mechanisms and locks functional

  • Comments

Key Handover to Securitas

  • Date:

  • Time:

  • Securitas representative:

  • Number of keys handed over:

  • Comments:

Site Overview

  • External Overview building/ compound

  • External Overview gates/ padlocks/ entry routes

  • External Overview FEx

  • External Overview Generator

  • External Overview ACU equipment

  • External Overview DNO

  • Internal Overview IT Room

  • Internal Overview Power Room

  • Internal Overview Gas Suppression Cabinet

Health & Safety

Medical/Fire

  • 1 Eye Wash <br>(if applicable)<br>BUILDING

  • 1 Eye Wash <br>(if applicable)<br>DATA/IT

  • 1 Eye Wash <br>(if applicable)<br>POWER/PLANT

  • 2 First Aid Kit<br>BUILDING

  • 2 First Aid Kit<br>DATA/IT

  • 2 First Aid Kit<br>POWER/PLANT

  • 3 Fire System (Auto to Manual)<br>BUILDING

  • 3 Fire System (Auto to Manual)<br>DATA/IT

  • 3 Fire System (Auto to Manual)<br>POWER/PLANT

  • 4 Fire Extinguishers<br>BUILDING

  • 4 Fire Extinguishers<br>DATA/IT

  • 4 Fire Extinguishers<br>POWER/PLANT

Signage

  • 5 Fire Evacuation <br>ALL AREAS

  • 6 Emergency Evacuation Area (Identified, Safe & Clear) Suite 1 & Suite 2 Emergency Door signage present FEx<br>ALL AREAS

  • 7 Electrical Safety <br>ALL AREAS

  • 8 Suite 1 & Suite 2 FEx designation signage present <br>FEx

  • 9 Suite 1 & Suite 2 IT Room Door signage present <br>FEx

  • 10 Suite 1 & Suite 2 Power Room Door signage present<br>FEx

  • 11 Suite 1 & Suite 2 Generator designation signage present <br>Generator

Miscellaneous

  • 12 Ear plug dispenser<br>BUILDING

  • 13 Earth Tapes/Rod Covers Safe and Flush<br>BUILDING

  • 14 Fibre Chambers, Covers and Locks (intact and servicable)<br>OTHER

  • 15 Fuel Spill Kit Available - Generator <br>BUILDING

  • 16 Lone Worker Alarm (Verify With NOC Whilst Sounding)<br>DATA/IT

  • 17 Disease<br>ALL AREAS

  • 18 Hazardous Substances - Stored or leaking<br>ALL AREAS

  • 19 Non-ionising Radiation<br>ALL AREAS

  • 20 Access / Egress Obstructions & Hazards<br>ALL AREAS

  • 21 Fire Hazards<br>ALL AREAS

  • 22 Infestation (Insects, Rodents, Birds)<br>ALL AREAS

  • 23 Trip and Slip Hazards<br>ALL AREAS

  • 24 Weather<br>ALL AREAS

  • 25 Utility Hazards (Gas/Electric/Water)<br>ALL AREAS

  • 26 Encroaching Vegetation<br>BUILDING

SNAGS

ORT SNAGS

  • SNAG 1

  • Details:

  • Assigned to:

  • Category:

  • SNAG 2

  • Details:

  • Assigned to:

  • Category:

  • SNAG 3

  • Details:

  • Assigned to:

  • Category:

  • SNAG 4

  • Details:

  • Assigned to:

  • Category:

  • SNAG 5

  • Details:

  • Assigned to:

  • Category:

  • SNAG 6

  • Details:

  • Assigned to:

  • Category:

  • SNAG 7

  • Details:

  • Assigned to:

  • Category:

  • SNAG 8

  • Details:

  • Assigned to:

  • Category:

  • SNAG 9

  • Details:

  • Assigned to:

  • Category:

  • SNAG 10

  • Details:

  • Assigned to:

  • Category:

  • OTHER SNAGS

  • Details:

  • Assigned to:

  • Category:

Completion

  • Report Details

  • Engineers Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.