Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Administration

  • Pre-construction meeting with subcontractors re: safe work practices

  • OSHA poster and other warning signs posted

  • Emergency phone numbers posted (if other than 911)

  • Written Safety Program on site including HazCom Program

  • Weekly safety meetings documented

  • MSDS from all subcontractors

  • Hazardous chemical list updated for job

  • Competent Person assigned for site

First Aid and Emergency

  • First aid kit fully stocked

  • Employees aware of personnel trained in first aid

  • Employees aware of emergency procedures

Housekeeping

  • General neat appearance of all work areas

  • Passageways and walkways clear

  • No projecting nails and screws

  • Regular site cleanup and trash disposal

  • Materials stored/stacked in orderly and safe manner

Fire Prevention

  • Proper number of Fire Extinguishers provided and charged

  • "No Smoking" posted and enforced (no cigarette butts in posted areas)

  • Combustibles >10' from building

  • Approved safety cans for gasoline

Electrical

  • Terminal boxes equipped with required covers

  • GFCI's in place

  • All extension cords are 3-wire with ground pin in place and in good condition

  • All electric tools and machinery have ground pin in place on power cable

  • Exposed light bulbs equipped with protective cage

  • Competent person if assured equipment-grounding program used in lieu of GFCI

Tools, Hand and Power

  • GFCI or grounded

  • All guards in place

  • Tools and cords in good condition

  • Inspected and maintained

Stairways and Ladders

  • Inspected and in good condition

  • Properly secured

  • Side rails extend 36" above top of landing

  • Ladder available for access to scaffolding

  • Guardrails provided for stairway landings

  • Handrails provided for stairways with four or more risers

  • Competent person periodically inspect ladders

  • Step ladders fully open when in use

Scaffolding

  • Properly erected and supervised by competent person

  • Scaffolding tied to structure

  • Scaffolding plumb, with cross bracing in place

  • Fully planked with toe boards in place

  • Base plates used (no cinder blocks)

  • Ladder access provided

  • Employees tied-off while working on elevated motorized scaffolding

  • No riding on rolling scaffolding

Motor Vehicles & Heavy Equipment

  • Service brakes and trailer brake connections inspected daily

  • Parking brake and service brake operable

  • Tires, horn, backup alarms, seat belts inspected

  • Lights, windshield wipers, defroster

  • Fire Extinguisher in place and fully charged

  • Weights and loads controlled

  • Personnel carried safely - seat belts provided

Excavation

  • Shoring adequate for soil and depth

  • Support system in place for adjacent structures

  • Spoil bank and equipment sufficient distance from excavation

  • Ladders provided

  • Competent person on site

  • Underground utilities located prior to excavation

  • Air samples taken prior to entry in underground tunnels/openings

Welding and Cutting

  • Screens, shields, goggles, gloves

  • Gas cylinder secured in upright position

  • Fire Extinguisher

  • Electrical equipment grounded

  • Valve protection caps in place when gas not in use

  • Fire watch provided 30 min subsequent to welding near flammable/combustibles

Concrete and Masonry

  • Proper scaffolding

  • Safe hoisting equipment

  • Masonry walls over 8 ft. braced

  • Limited Access Zone established

  • Fall protection used

  • Guard rails on all open floors

  • All protruded rebar guarded

  • Hard hats and safety shoes

Highway/Work Zone

  • Competent Flagmen reflective garments, instructed, posted

  • Adequate warning signs and markers

  • Traffic control through construction area

  • Dust control

  • Work Zone of Heavy Equipment protected from pedestrians and other traffic

  • Equipment inspected daily

  • Back up alarms and horns operational

  • Proper lighting

Fall Protection

  • Floor openings

  • Guardrails in place/replaced after each load received

  • Safety harnesses provided and used

  • Floor holes protected/secured/marked

  • Wall openings guarded

General

  • Hard Hats

  • Proper footwear

  • Ear Protection

  • Eye Protection

  • Potable water

  • Unusual exposures identified and controlled.

  • Select date

  • Onsite representative

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.