Resident Inspection Authorisation & COVID 19 Questions

  • Engineer Name

  • Does the Operative have COVID RAMS, present, signed and in-date?

  • Can the Operative clearly outline the procedure to prevent the spread of COVID?

  • Is the Operative aware of the COVID symptoms?

  • Does the Operative have all COVID PPE available as supplied by the Company (Sanitizer, wipes, disposable gloves, face visor, masks)?

  • Select weather conditions at time of inspection..

Site Safety and Customer Service

  • Do Operatives carry valid ID Cards [I.E Company ID, Gas Safe, OFTEC, NICEIC]

  • Is the works vehicle parked safely?

  • Is the works vehicle tidy?

  • Does the Operative have access to current RAMS? (LearnUpon)

  • Evidence Site Safety Set-Up: Have Operatives set up the work area in an orderly fashion, keeping access/ egress routes free from obstruction?

  • Are the Operatives using the correct floor protection?

  • Has the customer been suitably advised on the repair process and potential hazards associated, including the safe zone and work zone locations?

Electrical Equipment Checklist

  • Earth Loop Impedance Meter / Capture serial number & calibration date

  • Insulation Resistance & Continuity / Capture serial number & calibration date

  • RCD Response Time Test Meter (BG Only) / Capture serial number & calibration date

  • 2-Pole Indicator Condition

  • Personal RCD

  • Any / All Lock Off Equipment & Devices Condition

Electrical - Safe Isolation Process

  • REQUIRED - Engineer MUST Demonstrate Safe Electrical Isolation Process

  • Can the Operative make correct use of the non-contact Volt Detector (Volt Stick x2 available)?

  • Inspector - refer to attached Electrical Safety Training Presentation & Provide Training

  • Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided

  • Can the Operative perform an Earth Loop Impedance Test (ELI)?

  • Inspector - refer to attached Electrical Safety Training Presentation & Provide Training

  • Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided

  • Can the Operative perform an RCD Response Time Test (BG Only)?

  • Inspector - refer to attached Electrical Safety Training Presentation & Provide Training

  • Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided

  • Can the Operative perform an Earth Continuity Test?

  • Inspector - refer to attached Electrical Safety Training Presentation & Provide Training

  • Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided

  • Can the Operative perform an Insulation Resistance Test?

  • Inspector - refer to attached Electrical Safety Training Presentation & Provide Training

  • Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided

  • Can the Operative make use of the 2-Pole Indicator to prove dead?

  • Inspector - refer to attached Electrical Safety Training Presentation & Provide Training

  • Following training given, I "The Operative" can confirm I have read, received and will adhere to all information provided

PPE & Work Equipment

  • Picture of full PPE [Empty Contents and Check Equipment Stock Levels]

  • Does the Operative have the correct PPE /Work Equipment in order to undertake the work safely? [Including COVID PPE]

  • Does the Operative have a fully stocked, in date First Aid Kit including eyewash?

  • PPE / Equipment Checklist

  • Any equipment damaged or missing - arrange replacement

  • Work being carried out in a safe manner using appropriate, serviceable PPE?

  • Operatives Gloves & Work Clothing

  • Is all hand tools / field equipment free from damage?<br>(if at risk, remove from use immediately and replace)

  • Has the defective equipment been immediately removed from site?

  • Personal RCD available

  • Does the engineer understand the correct method of use

  • Does the Operative have X1 1KG Powder Fire Extinguisher Available? [Fully Pressurised and Maintained]

  • Extinguisher Condition

  • Is safety footwear in good condition and of the correct type?

  • Are staff aware of the correct PPE for the tasks they are trained to perform?

  • Access Equipment / Lifting Equipment in good condition and free from any defects? (Check feet, platforms **where applicable)

  • Remove from use immediately and arrange replacements

  • Oven Table

  • Cooker table

  • Hop-Up

  • Does the Operative have correct paperwork [Warning Labels, Electrical and Gas]

Sign Off

  • Auditor Feedback

  • Auditor Sign

  • Operative Sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.