Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Area to be inspected:- Packing rooms with AVAPAC 2 and 3 Bin room and airlock and the powder process lab and subsampling room
1.0 Foreign Matter Control
-
1.3 Are the overhead lights covered with shields to prevent contamination of products by broken glass and are free from cracks?
-
1.1 Are product contact areas free from scratchs or burrs in the metal?
-
1.2 Are there any broken pieces of glass or brittle plastic impacting on food safety?
-
1.3 Are there any Perspex guards that are cracked or missing from the production area?
-
Comments/ actions required....
-
Insert relevant photos
2.0 Quality Control Records
-
2.1 Have all log sheets been completed as per frequency required?
-
2.2 Are the CCP records completed and countersigned.
-
2.3 Is the operator trained to sign off log sheets.
-
2.4 Are there obsolete or uncontrolled documents in the area?
-
Comments/ actions required....
-
Insert relevant photos
3.0 Pest Control
-
3.1 Is there any uncontrolled pest infestation or activity in this area?
-
3.2 Have all holes and cracks been filled so as not to provide hiding places or entry points for pests?
-
3.3 Are all insect traps working and free from damage?
-
Comments/ actions required....
-
Insert relevant photos
4.0 Good Manufacturing Practices
-
4.1 Are cleaning tools properly identified, in serviceable condition and stored correctly with the Fonterra brush and broom policy displayed
-
4.1 Are airlocks in clean condition with space around stored pallets for inspections?
-
4.2 Are any open spaces, including under benches that are clear and uncluttered?
-
4.3 Are the hand sanitising equipment full are in good working order?
-
4.4 Are the hand washing sanitisers clean and free from dirt or foreign matter
-
4.5 Are there any machine parts, tools, pipes or hoses on the floor?
-
4.6 Are there any obsolete or unused tools, equipment, pipes etc in the area?
-
4.7 Are wood or cardboard packaging being used for any purpose other than designated?
-
4.7 Are plastic pallets free from cracks and damage and in clean condition?
-
4.8 Is the area clear of powder build ups
-
4.9 Is the area completely clear of ponding water
-
4.11 Floors clean and free from damage? (there should be no cracks or gaps in joins)
-
4.12 Walls clean and free from damage? (there should be no flaking paint)
-
4.13 Ceiling clean and free from damage? (There should be no flaking paint)
-
4.14 is all powder swept from floor contained in dedicated buckets
-
4.15 Are all bag dumps free from plastic and packaging
-
4.16 Rubbish bins are clean, tidy labelled and emptied after each shift?
-
4.17 Operator stations clean, tidy?
-
4.17 Is there evidence of leaks around socks and cans above the pregassers or top of bin room
-
4.18 Are all knives in the area accountable for and undamaged and the register completed and signed?
-
4.18 Are all sample points in clean hygienic condition?
-
4.19 Are all trolleys that pallets are moved on clean and free from damage?
-
Comments/ actions required....
-
Insert relevant photos
5.0 Chemical Control
-
5.1 Are the hazardous chemicals in the area stored properly and away from the process flow?
-
5.2 Are all chemical containers in good condition and clearly labelled to identify internal contents?
-
5.3 Are MSDS's available in the area, and within date?
-
5.4 Is any safety PPE clean and in good condition?
-
Comments/ actions required....
-
Insert relevant photos
6.0 Allergen Control and Stock food Control
-
6.1 Are there any products containing an allergen in the area?
-
6.2 Are these products clearly labelled and stored correctly?
-
6.3 Are the products stored in a dedicated segregated area?
-
6.4 Is there a chance of cross contamination?
-
6.4 Are any stockfood bins or bags clearly dated and labelled?
-
Comments/ actions required....
-
Insert relevant photos
7.0 Summary of Inspection
-
Any additional items not covered in the 5S Inspection:
-
Insert relevant photos
-
The findings of this 5S Inspection were presented to, and discussed with the Process manager on this date:
-
Name and Signature of Team Leader
-
Name and Signature of Process Manager