Information

  • Conducted on

  • Location
  • Inspection No.

  • Inspection by:

  • Project Title

  • Project No.

  • Client / Site

  • Personnel

  • The field audit is broken into 3 sections, Safety, Environmental and Quality. As a minimum the Safety section should be used.
    Note 1: Positive work practices and behaviours should also be recorded.
    Note 2: The person issuing the corrective action is responsible for ensuring this form is completed prior to sending to the QHSET manager.
    Note 3: return the completed inspection to the QHSET Manager. Zainj@pu.com.au

The following to be completed if the workplace is visited by a Senior Manager.

  • Attended a toolbox talk.

  • Attended a daily pre-start meeting.

  • Task Observation.

  • Training needs identified.

  • Additional comments or observations.

  • Photo record if required.

Safety

Site Personnel.

  • All personnel inducted.

  • Mandatory PPE worn.

  • SMP, SWMS signed and available.

  • HAC completed and site relevant.

  • All people signed onto HAC

  • Access permit on site with all staff signed on.

  • Amenities - toilets, shelter & water available

  • Subcontractor SWMS, HAC and PPE compliant.

  • Spotter available for heavy plant movements and excavations.

  • Competent operators available for plant.

  • Staff appropriately trained and authorised. i.e relevant authority authorisation, licenses, confined spaces etc.

Equipment, Plant & Materials

  • First aid kit, fire extinguisher and low voltage rescue kit available.

  • Perimeter fencing appropriate.

  • Correct fittings used.

  • Flashing lights, motion alarms/reversing beepers operational.

  • Fall protection in place.

  • Handrails and toe boards in place.

  • Emergency equipment in place.

  • Lifting equipment in good order.

  • Excavations deeper than 1.5m benched, battered or shored.

  • Power tools plugged into RCD.

  • Shoring boxes used as per installation instructions.

  • Welding screens erected.

  • Pipes and fittings stored on level ground and choked.

  • MSDS register available.

  • Chemical and hazardous substances stored as per MSDS.

  • Material and equipment stored outside zone of influence.

Permits, Checks & Tests

  • Plant pre start completed.

  • Excavator safety pin installed.

  • Dial Before You Dig and permit to excavate completed and on site.

  • Lifting gear checked and tagged with correct colour tag.

  • Electrical tools tested and tagged.

  • Approved TMP on site.

  • Traffic control setup as per plan.

  • First aid kit items in date.

  • Fire extinguishers checked within last 6 months.

  • Confined space entry permit in place.

Signage

  • P&U and "Keep Out" sings erected.

  • SWL marked on excavator/crane.

  • Overhead signage erected and map completed.

  • Services identified and marked on ground.

  • Emergency assembly point established.

  • Emergency process, hospital and medical centre signage in place.

  • Confined spaces identified.

Environmental

Procedural

  • CEMP & EWMS available.

  • Compliant with working hours for site.

  • Heritage protection issues managed.

  • Tree protection issues managed.

  • Noise & vibration monitoring/control managed.

Spoil, sediment and water

  • Spill kits available.

  • Sediment controls installed and marked.

  • Sediment controls maintained.

  • Storm water protection in place.

  • Pumped water passing through control mechanism.

Waste and spoil

  • Waste in designated bins/areas.

  • Waste records available.

  • Spoil transportation records available.

  • Pumped water tested for pH and turbidity.

  • Contaminated waste controlled and recorded.

Site

  • Clean and tidy work area.

  • Site delineation appropriate.

  • Loads leaving site fully covered.

  • Vehicles leaving site free from dirt, mud and debris.

  • Acceptable level of restoration.

  • Construction plant clear of drip line of trees.

Quality

Procedural

  • Drawing register up to date.

  • Current drawings/documents available on site.

  • Training records up to date and available.

  • NCR, CAR & IR registers up to date and issues registered and closed out within reasonable time.

  • Variation register up to date.

  • "As Built" drawings prepared & checked.

  • Equipment calibrated & registered.

  • Drawings and documents filed appropriately.

Policy and Procedures

  • Actions from previous inspections closed out.

  • Compliant use of Daily Plant Inspection book.

  • P&U policies displayed.

  • Compliant use of HAC

  • ITP & Checklists used adequately.

  • Compliant use of Daily Site Diary

  • Authorised person viewing Hold Point and Witness Points in accordance with ITP.

  • Monthly Project Status reports completed.

Photos/Drawings

  • Add photo

  • Photo description

  • Add photo

  • Photo description

  • Add photo

  • Photo description

  • Add drawing

  • Drawing description

Inspection Findings

Follow up actions

  • Follow up actions required

  • Action
  • Action required.

  • Consequence

  • Date to be implemented.

  • To be implemented by.

  • Add photo if it adds value.

  • Additional comments (record positive actions also)

Inspection sign off

  • Inspection completed by.

  • Site representative.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.