Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
All buildings secured?
-
Signature upon completion of lockup
Issues and notes
-
Please use to record any issues or ongoing notes for later reference
Kooinda (KOO)
-
Is Building Occupied
-
Time Completed
Lockup
-
External doors and windows
Kintaiba (KIN)
-
Is Building Occupied?
-
Time Completed
Lockup
-
External doors and windows
Industry Development Centre (IDC)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
107 (N)
-
100 (E)
-
100 (S)
-
100 (W)
-
Council Room Doors (x4) 106
-
External doors and windows
-
Building fully secured?
Chancellery (CH)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
Carpark Fire Door
-
113
-
201
-
207 (N)
-
207 (E)
-
Level 2 corridor (a/b)
-
Legal exit
-
243 (E)
-
243 (W)
-
External Gate
-
South Fire Doors (x2)
-
Is building fully secured?
Engineering F (EF)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
EFG01 (E)
-
EFG01 (W)
-
EFG09 (N)
-
EFG09 (S)
-
EFG02 (x3) Lecture Theatre
-
EF111
-
Is building fully secured?
Engineering A (EA)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
EAG00 Main Entry
-
EAG34 N/E + S/E (opp main entry)
-
EAG01 N/W and S/W firedoors
-
EA100
-
EA Level 1 bathroom windows
-
Is building fully secured?
Engineering S (ES)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
Level 1 external (all doors and windows)
-
ES101 (W)
-
ES135
-
ES200 Main Entry
-
ES201 (foyer x2)
-
ES205 (Int & Ext)
-
ES203 (E)
-
Is building fully secured?
Engineering E (EE)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
EEG00
-
EEG01
-
EE100
-
External Ground Windows
-
Is building fully secured?
Engineering C (EC)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
ECG03 Main Entry
-
ECG01 Front Entry
-
ECG01 Rear Entry
-
ECLG01 Rear Entry
-
ECG03a Side Entry
-
Is building fully secured?
Tunra Annexe (TA)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Fully secured - TA101, TA110 (W & E)
Engineering G (EG)
-
Is Building Occupied?
-
Time Completed
Lockup
-
EG (x4)
Engineering B (EB)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
EBLG01
-
EBG00a
-
EBG00b
-
EBG01
-
EBG08 + 08a
-
EB Level 1 ramp door (101)
-
Is building fully secured?
Engineering D (ED)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
Rear roller doors (x5)
-
External ground floor windows
-
EDG06 Rear Door (opp EB ramp)
-
EDG08ae (Machine Room)
-
EDG09a
-
Laser Room fire door
-
EDG08e (under spiral ramp)
-
EDG07e
-
EDG20
-
EDG05
-
EDG01 Main Entry
-
EDG02 (S/W)
-
ED113
-
ED101 (spiral ramp entry)
-
Level 1 ramp
-
Is building fully secured?
Advanced Technology Centre (ATC)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Level 1 external
-
Level 2 external
-
ATC201 (Main Entry)
Central Animal House (AN/AS)
-
Is Building Occupied?
-
Time Completed
Lockup
-
ASG01 & ASG 15
-
AN100 (Main) & AN130
Health and Physical Education (HPE)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Level 1 rear (HPE ST01 Entry)
-
Level 2 main (HPE 201 Level 2 Entry Auto Door)
Nusport Forum (SCH)
-
Is Building Occupied?
-
Time Completed
Lockup
-
External only check
Feed Store (CAH-FS)
-
Is Building Occupied?
-
Time Completed
Lockup
-
External checks/building secure
Gardeners Shed
-
Are both gates secured?
-
Time Completed
Ray Watt Oval and Pavilion (RWOP)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Toilets (x3)
-
Sliding Door to balcony
-
Ground level (Doors/windows/shutters)
Squash Pavilion (SP)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Main Entry Door
-
External of building
Aviation/Psychology (AV)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
AVLG xray entry (x2)
-
AVLG01 (rear entry)
-
AVLG29
-
AVLG17 (near footbridge)
-
AVG14 (near footbridge)
-
AVG01 (main)
-
Door o/s AV23/24
-
Is building fully secured?
Architecture (A)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
External windows
-
AG01 (N)
-
AG01 (S)
-
AG01 (E)
-
AG01 (W)
-
A101 (ramp entry)
-
Level 1 external doors (121, 120, 119)
-
Is building fully secured?
Building Science (BSC)
-
Is Building Occupied?
-
Time Completed
Lockup
-
BSC126, 125, 123, external doors and windows
Architecture Design Studio (ADS)
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
ADS100 Corridor (x2)
-
ADS201 Entry
-
ADS216 Rear Entry
-
ADS209 Fire Door (x2)
-
ADS303 Fire Door
-
Is building fully secured?
Architecture and Built Environment Workshop (ABEW)
-
Is Building Occupied?
-
Time Completed
Lockup
-
ABEW100, 111, 103 rear doors
NIER C Block
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
Main Entry (NIERCG01)
-
Lower Ground Doors (x2)
-
External Stairway Gate Entry (x2)
-
Level 1 external stairway doors
-
Ground level external stairway doors
-
Is building secured?
NIER A Block
-
Is Building Occupied?
-
Time Completed
Lockup
-
Full door list required?
-
U/C carpark (bike hub/109/112)
-
Main reception entry (A273)
-
Entry (A201)
-
Meal room/kitchen
-
A237
-
A250
-
A401
-
A471
-
Is building secured?
NIER (all other)
-
Is Building Occupied?
-
Time Completed
Lockup
-
All external
-
Wire gates (x3)
-
Cardax gate