Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
What station is being inspected?
Inspection
-
Is the surface clear of all blast rock remnants
-
PKI sign off
-
MH sign off
-
Is the surface thoroughly cleaned of all soil, ice, snow, and other deleterious material?
-
PKI sign off
-
MH sign off
-
Are all joints, cavities, faults and potholes excavated and thoroughly cleaned
-
PKI sign off
-
MH sign off
-
Surfaces requiring dental concrete have been washed with 15,000psi washer.<br><br>Survey is to map all areas designated for dental concrete prior to placement of concrete.
-
PKI sign off
-
MH sign off
-
Holes and depressions filled with concrete or slush grout as directed by the Engineer<br><br>A copy of the completed dental concrete checklist has been verified.
-
PKI sign off
-
MH sign off
-
Final cleaning of surface is complete as per specifications for each zone (class 1, downstream class 3/4, upstream class 3/4, and class 5,6,7,8)
-
PKI sign off
-
MH sign off
-
Surface has been as built by PKI survey<br><br>Survey drawing showing area being signed off and all areas dental concreted outlined
-
PKI sign off
-
MH sign off
Final sign off
-
Field Engineer
-
Superintendent
-
Quality
-
Owner rep