Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • What station is being inspected?

Inspection

  • Is the surface clear of all blast rock remnants

  • PKI sign off

  • MH sign off

  • Is the surface thoroughly cleaned of all soil, ice, snow, and other deleterious material?

  • PKI sign off

  • MH sign off

  • Are all joints, cavities, faults and potholes excavated and thoroughly cleaned

  • PKI sign off

  • MH sign off

  • Surfaces requiring dental concrete have been washed with 15,000psi washer.<br><br>Survey is to map all areas designated for dental concrete prior to placement of concrete.

  • PKI sign off

  • MH sign off

  • Holes and depressions filled with concrete or slush grout as directed by the Engineer<br><br>A copy of the completed dental concrete checklist has been verified.

  • PKI sign off

  • MH sign off

  • Final cleaning of surface is complete as per specifications for each zone (class 1, downstream class 3/4, upstream class 3/4, and class 5,6,7,8)

  • PKI sign off

  • MH sign off

  • Surface has been as built by PKI survey<br><br>Survey drawing showing area being signed off and all areas dental concreted outlined

  • PKI sign off

  • MH sign off

Final sign off

  • Field Engineer

  • Superintendent

  • Quality

  • Owner rep

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.