Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Shift

  • Crew

Shift Audit

  • Truck Utilization Actual Vs Target

  • Actual vs Target (24hr plan):

Shift Audit

Loading units

  • Loading Units

  • Ramp

  • operators on dig unit

  • Add media

  • Last first Load times: (Off going on coming)

  • Are you following correct plan for dig unit? (HW, Crest, Toe, Limits & Floor)

  • Have hazards identified in your work area been made safe? EG Sumps bunded and demarcated as per SWI. JSA conducted where required or barriers erected, or persons withdrawn from the area to prevent exposure to the hazard?

  • Is the dump on plan? (Limits with compliant toe bunding, floor & RL

  • Are all hot seating and refuelling bays compliant? (Temporary v-drains removed, aligned with slops and crest procedure and adequate signage, delineation and lighting?)

  • Road at correct width and in good order (789= 28m, 793 = 32m, 797 = 35m)

  • Road at correct grade and crossfall – compliant with standard

  • Has the latest Road cross fall report been cross referenced for compliance

  • Does the work area have adequate lighting having regard for shadow, contrast and glare

  • Is dust being controlled effectively?

  • Genral Comments:

HSEC

  • How many people on annual leave sick leave

  • Any safety issues / incidents / injuries?

  • JSA in place and signed off by operators and OCE? (Enter location in notes.)

  • Seatbelt compliance and functionality checked in at least 2 vehicles. (Enter vehicle details in notes.)

  • CCO/PTO/TTT completed and entered?

Exposed Edge Confirmation

  • Work area inspected for open faces?

  • Any edge bunding that has been altered or removed has been made safe. EG New bunding reinstalled to standard or no longer required (ramp pushed through edge bund) Capture details

  • Is the reinstalled bund compliant and been checked by Supervisor/OCE?

  • If bund not reinstalled what action has been passed on to the oncoming Supervisor? (Enter details in notes.)

  • General Comments:

Active Area Inspection

  • Hazardous Tyre Bay in place and signed correctly

  • Area setup to standard? (Equipment location & circuit entry signs correctly positioned & AMA signs correct)

  • Positive Communication checked and to standard?

  • LV park up areas set up with correct bunding?

  • Geotech controls are in place and adhered to?

  • TMP in place and adhered to?

  • SHE / DRE Cable Delineated by green cones?

  • Is there a potential for an in-rush of water or pooling water in the work area?

  • Has an area inspection been conducted above and below the work area? EG Adequate catch bunding above or below?

  • Are crib hut and go line areas up to standard? Bunding, access roads, parking bays compliant, ground condition good?

  • Have any sumps in the work area been bunded or demarcated?

  • Is reject dump work area compliant? (EG On plan, bunding to standard, AMA in place when active)

Compliance

  • Has an intersection checklist with TMP been completed for any new intersections?

  • Has friction testing been carried out this shift on circuit?

Monitoring Berms

  • Drainage breakthroughs when required, are no greater than 1m wide and angled away from the direction of travel

  • Bunding is to required standard? (Height and Width)

  • Has the monthly Bund compliance report been cross referenced to verify

  • Are berms constructed as steep as practicable? Ideally achieving a 1V:1H 45* inner and batter angle)

  • Is the toe of berms clear of debris, mud or build-up

  • Bund base width – inspect the tip head bunding to determine if undercutting has occurred and the base widths are adequate

  • Bund construction material - determine the category of bund material used at the tip head (Identify if it is CAT1,2 or 3)

  • Has the berm compliance report been used to identify inadequate windrows and berms in the work area?

  • Has actions been taken to address any inadequate windrows/berms identified?

ROM Area / Stockpiles

  • Stockpile areas to standard

  • Are the ramps up on to coal stockpiles compliant? (EG Correct width, Grade is 10% or less, the ramp exit is square to any through traffic)

  • Does the ROM work areas have adequate lighting, having regard for shadow, contrast and glare?

  • ROM area set up, is to standard? (EG running tracks graded, dust controlled effectively, appropriate signage in place)

Enabling Activities / Dozer working near High Wall Crests (High Risk Activity)

  • Have you completed any other enabling activities?

General / Additional Information

  • undefined

Supervisor Hand Over Notes

  • undefined

Incoming / Out going Supervisor Sign Off

  • Out going

undefined

  • Incoming

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.