Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Part Name

  • Drg Rev: - Check against Checksheet vs drawing number

  • BoM Ref: (Bill of Materials)

  • Checksheet Rev (Revision status)

  • PFMEA No (List the PFMEA number)

  • Control Plan No (List the control plan number)

  • Work Instructions Rev: (Checksheet vs Work Instructions)

  • Refer to latest work instruction revision

Product Audit

1 Kit Cutting

  • OP10 Material Cutting Is the operation compliant to the checksheet/work instructions and control plan? (Check for batch numbers/expiry) (WI 009 & Check sheet)

2 Stores

  • OP20 Allocate and issue materials in sage Is the operation compliant to the checksheet/work instructions and control plan? (Check for batch no. and expiry) (WI 009 & Check sheet)

3 Laminating

  • OP30 Clean and release Is the operation compliant to the checksheet/work instructions and control plan? (WI 055 & Check sheet)

  • OP40 Tooling Check Is the operation compliant to the checksheet/work instructions and control plan? (WI 055 & Check sheet)

  • OP50 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet)

  • OP60 Debulk Is the operation compliant to the checksheet/work instructions and control plan? (WI 008 & Check sheet)

  • OP70 Supervisor check Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet)

  • OP80 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet & Layup manual)

  • OP90 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet & Layup manual)

  • OP100 Debulk Is the operation compliant to the checksheet/work instructions and control plan? (WI 008 & Check sheet)

  • OP110 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet & Layup manual)

  • OP120 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet & Layup manual)

  • OP130 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP140 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP150 Debulk Is the operation compliant to the checksheet/work instructions and control plan? (WI 008 & Check sheet)

  • OP160 Aluminium Inserts Is the operation compliant to the checksheet/work instructions and control plan? (Check sheet & Layup manual)

  • OP170 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP180 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP190 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP200 Debulk Is the operation compliant to the checksheet/work instructions and control plan? (WI 008 & Check sheet)

  • OP210 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP220 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP230 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP240 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP250 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP260 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP270 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP280 Debulk Is the operation compliant to the checksheet/work instructions and control plan? (WI 008 & Check sheet)

  • OP290 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP300 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP310 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP320 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP330 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP340 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP350 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007 & Check sheet& Layup manual)

  • OP360 Laminate Is the operation compliant to the checksheet/work instructions and control plan? (WI 007, WI 008 & Check sheet& Layup manual)

  • OP370 Vacuum Drop Test Is the operation compliant to the checksheet/work instructions and control plan? (WI 008 & WI 009)

4 Autoclave Curing

  • OP380 Autoclave Cure Is the operation compliant to the checksheet/work instructions and control plan? (Work Instructions)

  • OP390 Autoclave Cure Is the operation compliant to the checksheet/work instructions and control plan? (WI 025 and Checksheet)

5 Break out Fitting

  • OP400 Demould Is the operation compliant to the checksheet/work instructions and control plan? (WI 21 & WI 070 & Work Instructions)

6 Paint Shop

  • OP410 Paint Prep Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP420 Paint Prep Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP430 Paint Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP440 Paint Prep Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP450 Paint Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP460 Paint Prep Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP470 Paint Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP480 Paint Prep Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP490 Paint Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

  • OP500 Identification Is the operation compliant to the checksheet/work instructions and control plan? (WI 068 Work Instructions)

7 Stage Inspection

  • OP510 Stage Inspection Is the operation compliant to the checksheet/work instructions and control plan? (WI 024)

8 Machining

  • OP10 Machine Is the operation compliant to the checksheet/work instructions and control plan? (WI 004, Skills Matrix)

  • OP20 Tap Holes Is the operation compliant to the checksheet/work instructions and control plan? (WI 047)

  • OP30 Hand Finish Is the operation compliant to the checksheet/work instructions and control plan? (WI 021)

9 Stage Inspection

  • OP40 Stage Inspection Is the operation compliant to the checksheet/work instructions and control plan? (WI 024)

10 Stores

  • OP10 Allocate and Issue Is the operation compliant to the checksheet/work instructions and control plan? (WI 062 and Checksheet)

11 Fitting

  • OP20 Abrade Is the operation compliant to the checksheet/work instructions and control plan? (WI 013, Fitting Manual)

  • OP30 Identification Is the operation compliant to the checksheet/work instructions and control plan? (WI 021, Fitting Manual)

  • OP40 Tap Holes Is the operation compliant to the checksheet/work instructions and control plan? (WI 013, Fitting Manual)

  • OP50 Hand Finish Is the operation compliant to the checksheet/work instructions and control plan? (WI 013, Fitting Manual)

  • OP60 Identification Is the operation compliant to the checksheet/work instructions and control plan? (WI 013, Fitting Manual)

  • OP70 Tap Holes Is the operation compliant to the checksheet/work instructions and control plan? (WI 013, Fitting Manual)

  • OP80 Hand Finish Is the operation compliant to the checksheet/work instructions and control plan? (WI 021, Fitting Manual)

12 Inspection

  • OP90 Final Inspection Is the operation compliant to the checksheet/work instructions and control plan? (WI 024)

13 Despatch

  • OP100 Despatch Is the operation compliant to the checksheet/work instructions and control plan? (Packaging Specification)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.