Weekly Cleaning Items

Weekly

Skyrise Ground Floor

  • All internal ground floor windows including mullions, mirrored panels and frames to be washed weekly with soapy water and rubber wiper to remove all excess water and dirt.

  • Date completed

  • Why? Please advise when this will be completed.

  • Revolving doors glass roof to be washed weekly top & bottom

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish all letterboxes weekly removing all grease & grime build up

  • Why? Please advise when this will be completed.

  • Date completed

  • Brass feature walls in lift lobby and lift landing polished weekly. Ensure all skirting is cleaned.

  • Why? Please advise when this will be completed.

  • Date completed

  • Lift lobby glass mirrors washed weekly

  • Why? Please advise when this will be completed.

  • Date completed

  • Detail machine scrub of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains, and ensuring no black build up in grout and on skirtings.

  • Date completed

  • Why? Please advise when this will be completed.

Cloudrise Ground Floor

  • All internal ground floor windows including mullions, mirrored panels, and frames to be washed weekly with soapy water and rubber wiper to remove all excess water and dirt. Clean up excess water residue.

  • Why? Please advise when this will be completed.

  • Date completed

  • Revolving doors glass roof to be cleaned weekly top & bottom

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish all letterboxes weekly removing all grease & grim build up

  • Why? Please advise when this will be completed.

  • Date completed

  • Brass feature walls in lift lobby and lift landing polished weekly

  • Why? Please advise when this will be completed.

  • Date completed

  • Lift lobby glass mirrors washed weekly

  • Why? Please advise when this will be completed.

  • Date completed

  • Damp wipe stone walls in lobby areas

  • Why? Please advise when this will be completed.

  • Date completed

  • Detail machine scrub of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains, and ensuring no black build up in grout and on skirtings.

  • Why? Please advise when this will be completed.

  • Date completed

External Paths, Porte Cochere, Bin Room & Loading Bay

Porte Cochere

  • High pressure machine scrub (Min 4000 PSI) ensuring all stains are removed.

  • Why? Please advise when this will be completed.

  • Date completed

  • Wipe all utility cupboards

  • Why? Please advise when this will be completed.

  • Date completed

  • All internal ground floor windows including mullions, mirrored panels and frames to be washed weekly with soapy water and rubber wiper to remove all excess water and dirt.

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish intercom stands

  • Why? Please advise when this will be completed.

  • Date completed

  • Pressure clean wall surfaces

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish glass mirrored panels

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish all alucabond columns

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish stainless-steel bollards

  • Why? Please advise when this will be completed.

  • Date completed

External Paths

  • All ground floor full height external façade (including gold and silver panels) and glass to be washed.

  • Why? Please advise when this will be completed.

  • Date completed

  • Internal laneway glass to be washed to full height

  • Why? Please advise when this will be completed.

  • Date completed

  • Wipe clean all utility cupboards in Porte Cochere including fire escape exits and fire control room door on Fawkner Street

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish external intercoms and stands on Southbank Boulevard and Porte Cochere

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish steel cladded columns

  • Why? Please advise when this will be completed.

  • Date completed

  • Pressure clean the compactors ensuring streak marks and or stains are removed

  • Why? Please advise when this will be completed.

  • Date completed

  • Pressure clean and disinfect all empty bins ensuring any debris inside the bins are removed. Wipe down bins ensure all marks are removed.

  • Why? Please advise when this will be completed.

  • Date completed

  • Clean and disinfect bin lifter ensuring surrounding floor area is clean

  • Why? Please advise when this will be completed.

  • Date completed

  • Detailed machine scrub whole loading bay and walkway including DDA refuge lobby weekly adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains, and ensuring no black build up in grout and on skirtings.

  • Why? Please advise when this will be completed.

  • Date completed

  • Wipe doors, handles and handrails in Loading Bay with damp cloth removing dust and streak marks

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish Cloudrise lift lobby entry door

  • Why? Please advise when this will be completed.

  • Date completed

  • All garage doors to be cleaned and wiped down.

  • Why? Please advise when this will be completed.

  • Date completed

  • Wipe speed panels on the Ground Floor DDA refuge (Goods Lift Lobby) and the white break glass alarm to remove dust and streak marks

  • Why? Please advise when this will be completed.

  • Date completed

  • Remove any oil stains on external footpath.

  • Why? Please advise when this will be completed.

  • Date completed

Car Park Lift Lobbies

  • All entrance doors and frames to be washed with soapy water and rubber wiper to remove all excess water and dirt. Including immediate glass windows to side of all doors

  • Why? Please advise when this will be completed.

  • Date completed

  • Machine scrub floor area

  • Why? Please advise when this will be completed.

  • Date completed

  • DDA refuge area mopped & vacuumed. Any rubbish to be removed.

  • Why? Please advise when this will be completed.

  • Date completed

Staff Amenities

  • Polish Cloudrise lift lobby entry door

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish Cloudrise lift lobby entry door

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish Cloudrise lift lobby entry door

  • Why? Please advise when this will be completed.

  • Date completed

Level 11 Amenities

Corridor & Lift Landings

  • Skirting boards dusted

  • Why? Please advise when this will be completed.

  • Date completed

  • Mirror panels washed weekly with soapy water and rubber wiper to remove all excess water and dirt.

  • Why? Please advise when this will be completed.

  • Date completed

  • Corrugated feature wall dusted & wiped weekly

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish all lift doors, surrounds and associated call buttons

  • Why? Please advise when this will be completed.

  • Date completed

  • Air vent grills wiped clean

  • Why? Please advise when this will be completed.

  • Date completed

  • DDA refuge area mopped & vacuumed. Any rubbish to be removed.

  • Why? Please advise when this will be completed.

  • Date completed

  • Wipe and polish stainless steel feature poles at gym and pool entry

  • Why? Please advise when this will be completed.

  • Date completed

  • Wipe clean service, sauna and steam room, theatre, dining room and apartment corridor cupboards

  • Why? Please advise when this will be completed.

  • Date completed

Sauna, Steam Room & Change Room Areas

  • All glass panels washed with soapy water weekly

  • Date completed

  • Pressure clean steam room tiles and remove foul odours

  • Date completed

  • Machine scrub all tiled areas removing any dirt and grime build up

  • Why? Please advise when this will be completed.

  • Date completed

Pool and Surrounding Areas

  • Machine scrub all floor tiled areas and remove calcification, dirt and grime build up

  • Pressure wash wall tiled areas and remove any calification, dirt and grime build up. Ensure that drains are unblocked and any rust is removed from the grates.

  • Polish alucobond and tiled columns ensuring any stains and calcification are removed

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Air vent grills wiped clean.

  • Wipe and polish stainless steel feature poles

Level 11 Theatre

  • Extend all recliner seats out and vacuum between gaps

Level 11 Recreational Lounge (Dining Room)

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Polish chrome door handles

  • Clean Fridge, remove all items

Level 11 Terrace & BBQ Area

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Clean entry swing doors inside and out

Starburst (Level 70)

Corridor & Lift Landings

  • Skirting boards dusted

  • Date completed

  • Mirror panels washed weekly with soapy water and rubber wiper to remove all excess water and dirt.

  • Corrugated feature wall dusted & wiped weekly

  • Polish all lift doors, surrounds and associated call buttons

  • Air vent grills wiped clean.

  • DDA refuge area mopped & vacuumed. Any rubbish to be removed.

Recreational Sky Lounge, Kitchen & Dining Areas

  • Clean all wall tiled areas in bathrooms ensuring any grime build up in the grout is removed

  • Polish chrome door handles

  • Clean Fridge, remove all items

Skyrise Pool Area

  • Machine scrub all floor tiled areas and remove calcification, dirt and grime build up

  • Polish alucobond and tiled columns ensuring any stains and calcification are removed

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

Sky Dining Room

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Polish chrome door handles

  • Clean Fridge, remove all items

Star Dining Room

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Polish all feature columns

  • Polish mirror panel cupboard

  • Polish chrome door handles

  • Dust TV

  • Clean Fridge, remove all items

Cloudrise Pool, Sauna & Steam Room Areas

  • All glass panels washed with soapy water weekly

  • Pressure clean steam room tiles and remove foul odours

  • Machine scrub all floor tiled areas to remove any dirt and grime build up

Level 71

Corridor/Lift Lobby

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • DDA refuge area mopped & vacuumed. Any rubbish to be removed.

Level 71 Cloudrise Gym Facilities

  • Dust and polish all shelving

  • Wipe and polish stainless steel feature poles at gym entry

  • Polish all feature columns

  • Clean all change room tiled areas including showers ensuring any grime build up in the grout is removed

Cloud Dining Room

  • Polish all feature columns

  • Polish mirror panel cupboard

  • Mircowave & Ovens deep cleaned

  • Polish chrome door handles

  • Clean Fridge, remove all items

Cloud Lounge

  • Polish all feature columns

  • Polish mirror panel cupboard

  • Clean internal cupboards, drawers & pantry shelves

  • Kitchen shelving dusted

  • Mircowave & Ovens deep cleaned

  • Polish chrome door handles

  • Dust TV

  • Clean Fridge, remove all items

Cloud Suite

  • Polish all feature columns

  • Dust TV

  • Clean Fridge, remove all items

Level 71 Theatre

  • Vacuum couches and chairs

Apartment Floors Level 14-67

  • Skirting boards dusted

  • Mirror panels washed weekly with soapy water and rubber wiper to remove all excess water and dirt.

  • Corrugated feature wall dusted & wiped weekly

  • Air vent grills wiped clean.

  • Service corridor mopped & vacuumed

  • DDA refuge area mopped & vacuumed

  • Common area doors wiped clean

Apartment Floors Level 72-86

  • Skirting boards dusted

  • Corrugated feature wall dusted & wiped weekly

  • Air vent grills wiped clean.

  • Service corridor mopped & vacuumed

  • DDA refuge area mopped & vacuumedl

  • Common area doors wiped clean

Apartment Floors Level 87-97

  • Skirting boards dusted

  • Corrugated feature wall dusted & wiped weekly

  • Air vent grills wiped clean.

  • Common area doors wiped clean

  • Service corridor to be vacuumed and mopped

Level 98 Penthouse Lobby

  • Skirting boards dusted

  • feature wall dusted & wiped weekly

  • Corridor timber wall. Wiped / polised weekly

  • Air vent grills wiped clean.

  • signage & apartment number cleaned weekly

  • Common area doors wiped clean

  • Wash all glass panels of the apartment entrance to full height

Other

  • Ensure all graffiti is removed and reported to Building Manager. Graffiti is to be removed within 48 hours.

  • Machine scrub toilets.l

Sign Off

  • Building Management Name:

  • Date and Time:

  • Building Management Signature:

  • Authorised Cleaning Company Representative Name:

  • Date and Time:

  • Authorised Cleaning Company Representative Signature:

Fortnightly

Fortnightly

Lifts

Lifts 1-6

  • Apply leather cleaner to lift panels

  • Polish leather hand rails

Lifts 7-9

  • Apply leather cleaner to lift panels

  • Polish brass hand rails

External Paths, Porte Cochere, Bin Room & Loading Bay

Porte Cochere

  • High pressure machine scrub (Min 4000 PSI) ensuring all stains are removed.

External Paths

  • Organise hard rubbish in preparation for collection the next day by placing items against wall

Level 11 Amenities

Corridor & Lift Landings

  • Air vent grills wiped clean.

Sauna, Steam Room & Change Room Areas

  • Clean all wall tiled areas including showers ensuring any grime build up in the grout is removed

Level 11 Recreational Lounge (Dining Room)

  • Polish dining tables remove scuff marks on legs

Golf Room

  • Spot clean wall areas ensuring no dirt build up on skirtings

Level 71

Cloud Dining Room

  • Polish timber dining tables remove scuff marks on legs

Cloud Lounge

  • Polish timber dining tables remove scuff marks on legs

Sign Off

  • Building Management Name:

  • Date and Time:

  • Building Management Signature:

  • Authorised Cleaning Company Representative Name:

  • Date and Time:

  • Authorised Cleaning Company Representative Signature:

Periodical Cleaning Monthly

Monthly

Skyrise Ground Floor

  • Please note down the date that the cleaning was conducted and take before and after photos.

  • All internal ground floor windows including mullions, mirrored panels and frames to be washed weekly with soapy water and rubber wiper to remove all excess water and dirt.

  • Why? Please advise when this will be completed.

  • Date completed

  • Revolving doors glass roof to be washed weekly top & bottom

  • Why? Please advise when this will be completed.

  • Date completed

  • Polish all letterboxes weekly removing all grease & grime build up

  • Why? Please advise when this will be completed.

  • Date completed

  • Deep clean (using a Polivac) of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains and ensuring no black build up in grout and on skirtings.

  • Why? Please advise when this will be completed.

  • Date completed

  • Steam cleaning of ground floor carpet areas and leather protection applied if applicable

  • Why? Please advise when this will be completed.

  • Date completed

  • Steam cleaning of ground floor carpet areas and leather protection applied if applicable

  • Why? Please advise when this will be completed.

  • Date completed

Cloudrise Ground Floor

  • Please note down the date that the cleaning was conducted and take before and after photos.

  • All internal ground floor windows including mullions, mirrored panels and frames to be washed weekly with soapy water and rubber wiper to remove all excess water and dirt. Clean up excess water residue.

  • Date completed

  • Why? Please advise when this will be completed.

  • Granite / Marble feature walls including all metal skirting to be damp wiped and dusted ensuring scuff marks are removed

  • Date completed

  • Why? Please advise when this will be completed.

  • Deep clean (using a Polivac) of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains, and ensuring no black build up in grout and on skirtings.

  • Date completed

  • Why? Please advise when this will be completed.

  • Damp wipe stone walls in lobby areas

  • Date completed

  • Why? Please advise when this will be completed.

  • All feature lights dusted & wiped monthly

  • Date completed

  • Why? Please advise when this will be completed.

  • Ledge above sliding doors dusted & wiped monthly

  • Date completed

  • Why? Please advise when this will be completed.

Lifts 10-12

  • Polish hand rails

  • Machine scrub floor

External Paths, Porte Cochere, Bin Room and Loading Bay

Porte Cochere

  • Pressure clean wall surfaces

  • Polish all alucabond columns

  • Polish glass mirrored panels

External Paths

  • Wipe clean all utility cupboards in Porte Cochere including fire escape exits and fire control room door on Fawkner Street

  • Scrub and remove any marks on front entry floors or walls.

  • Pressure clean all external ground floor wall surfaces including stainless steel and alucobond Columns. Incorporated with pavement cleaning. Use all chemicals as required.

  • Polish steel cladded columns

  • Pressure clean the compactors ensuring streak marks and or stains are removed

  • Deep clean (using a Polivac) of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains and ensuring no black build up in grout and on skirtings.

  • Wipe speed panels in the Ground Floor DDA refuge (Goods Lift Lobby) and the white break glass alarm to remove dust and streak marks

  • Remove any oil stains on external footpath.

Carpark

  • Clean undneath the car park sliders ensure no dirt/dust build up on the tracks.

  • Sweep all car park levels , check plantar boxes and remove all waste and rubbish

  • Pressure clean steel mesh to exterior of building (C/P gate).

Carpark Lift Lobbies

  • Machine scrub floor area

Bike Room

  • Ensure drains are cleared

  • Date completed

  • Why? Please advise when this will be completed.

  • Detailed machine scrub weekly adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains

  • Date completed

  • Why? Please advise when this will be completed.

Staff Amenities

  • Detailed machine scrub weekly adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains

Corridor and lift landings

  • Detailed machine scrub weekly adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains

Corridor and lift landings

  • Detailed machine scrub weekly adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains

Level 11 Ammenities

Corridor and lift landing

  • All tiles areas machine including the unisex bathroom scrubbed using polivac machine.

  • Wayfinding signage

  • Wipe clean service, sauna and steam room, theatre, dining room and apartment corridor cupboards

Sauna, Steam Room and changeroom areas

  • Polish benches in changerooms

  • Clean sink and shower drains with draino

Level 11 Theatre

  • Wipe clean all cupboards and joinery

  • undefined

Level 11 Recreational Lounge (Dining Room)

  • Dust all feature lights

  • Polish all shelving

  • Polish all decorations

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Machine scrub toilet floors

  • Polish dining tables remove scuff marks on legs

  • Polish all feature columns

  • Clean internal cupboards, drawers & pantry shelves

  • Kitchen shelving dusted

  • Mircowave & Ovens deep cleaned

  • Dishwasher deep clean with dishwasher cleaner

  • Polish chrome door handles

  • Clean Fridge, remove all items

  • Clean sink drains with draino

Level 11 terrace and BBQ area

  • Acid wash tiles

  • Wash internal glass ballustrades

Golf Room

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

Level 70 Skyrise

Corridor

  • Lift lobby floor tiles scrubbed.

Recreational Sky Lounge, Kitchen and Dining Areas

  • Dust all wall backed and ceiling feature light covers

  • Polish all shelving

  • Polish all decorations

  • Machine scrub toilet floors including the back of house airlock, adding recommended to ensure all stains are removed

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Dishwasher deep clean with dishwasher cleaner

  • Clean sink drains with drano

Skyrise Pool Area

  • Pressure wash wall tiled areas including bathrooms and remove any calification, dirt and grime build up. Ensure that drains are unblocked and any rust is removed from the grates.

  • Wipe and polish stainless steel feature poles

  • Polish gold panels

Skyrise Gym Facilities

  • Wash all windows and glass panels including the ledges and frames ensuring any dirt and grime is removed

  • Wipe and polish stainless steel feature poles at gym entry

Sky Dining Room

  • Polish all shelving

  • Polish all decorations

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Polish timber dining tables remove scuff marks on legs

  • Polish all gold feature panels

  • Polish all feature columns

  • Clean internal cupboards, drawers & pantry shelves

  • Kitchen shelving dusted

  • Mircowave & Ovens deep cleaned

  • Dishwasher deep clean with dishwasher cleaner

  • Polish chrome door handles

  • Clean Fridge, remove all items

  • Clean sink drains with draino

Star Dining Room

  • Polish all shelving

  • Polish all decorations

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Polish timber dining tables remove scuff marks on legs

  • Clean internal cupboards, drawers & pantry shelves

  • Kitchen shelving dusted

  • Mircowave & Ovens deep cleaned

  • Dishwasher deep clean with dishwasher cleaner

Cloudrise Pool, Sauna and Steam Room Areas

  • Mop and sweep the sauna and steam plant room

Level 71 Cloudrise

Corridor

  • Damp wipe timber slat wall in seating foyer & corridor

  • Machine scrub toilets and cleaners room floor tiles

  • Damp wipe common area doors

  • Dust all feature lights

Recreational Library

  • Damp wipe common area doors

  • Scotchgard furniture

  • Dust all feature lights

  • Polish all shelving

  • Polish all decorations

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

Platinum Lounge

  • Dust all feature lights

  • Polish all shelving

  • Polish all decorations

  • Polish timber columns & Wallpapper inserts

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

Cloud Dining Room

  • Scotchgard furniture

  • Dust all feature lights

  • Polish all shelving

  • Polish all decorations

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Machine scrub toilet floors

  • Polish timber dining tables remove scuff marks on legs

  • Polish all feature columns

  • Polish mirror panel cupboard

  • Clean internal cupboards, drawers & pantry shelves

  • Kitchen shelving dusted

  • Mircowave & Ovens deep cleaned

  • Dishwasher deep clean with dishwasher cleaner

  • Polish chrome door handles

  • Clean Fridge, remove all items

  • Clean sink drains with draino

Cloud Lounge

  • Dust all feature lights

  • Polish all shelving

  • Polish all decorations

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Machine scrub toilet floors

  • Dishwasher deep clean with dishwasher cleaner

  • Clean sink drains with draino

Cloud Suite

  • Dust all feature lights

  • Polish all shelving

  • Polish all decorations

  • Wash all windows including the ledges and frames ensuring any dirt and grime is removed

  • Polish timber dining,wall table & coffee tables. Remove scuff marks on legs

  • Clean internal cupboards, drawers & pantry shelves

  • Kitchen shelving dusted

  • Dishwasher deep clean with dishwasher cleaner

  • Polish chrome door handles

  • Clean sink drains with draino

Theatrette

  • Wipe clean all cupboards and joinery

  • Dust & wipe screen

Cloudrise Gym Facilities

  • Wipe and polish all timber feature walls

  • Wash all windows and glass panels including the ledges and frames ensuring any dirt and grime is removed

  • Scrub flooring to remove stains on the floor

Apartment Floors Level 98 Penthouse

  • Lift lobby floor tiles scrubbed.

Apartment Floors Level 87-97

  • Corridor timber wall. Wiped / polished weekly

Apartment Floors Level 72-86

  • Corridor timber wall. Wiped / polished weekly

Sign Off

  • Building Management Name:

  • Date and Time:

  • Building Management Signature:

  • Authorised Cleaning Company Representative Name:

  • Date and Time:

  • Authorised Cleaning Company Representative Signature:

Periodical Clean Quarterly

Skyrise Ground Floor

  • Deep clean (using a Polivac) of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains and ensuring no black build up in grout and on skirtings.

  • Steam cleaning of ground floor carpet areas and leather protection applied if applicable

  • Steam clean all couches, lounges, chairs , apply scotch guard and leather conditioner where applicable.

Cloudrise Ground Floor

  • Leather cleaner / protector applied to lobby feature walls

  • Granite / Marble feature walls including all metal skirting to be damp wiped and dusted ensuring scuff marks are removed

All Lifts (Lifts 1-10, 12 &13)

  • Brush and wash lift tracks removing all debris.

  • Clean all lift landings.

External Paths

  • All ground floor full height external façade (including gold and silver panels) and glass to be washed.

  • High pressure clean of all footpaths, pavements & Porte Cochere surrounding the building ensuring all stains are removed

  • Porte Cochere feature rod pendant lights cleaned

  • Dust and wipe bike racks.

Basement 1

  • Deisel pump room

  • Water feature room

  • Water feature room

  • Retail services room

  • Water services room

Staff Ammenities

  • Deep clean (using a Polivac) of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains and ensuring no black build up in grout and on skirtings.

Level 11 Amenities

Pool and Surrounding Areas

  • Steam clean and scotch guard sun lounges

Level 11 Theatre

  • Apply leather conditioner to all seating

  • Dust & wipe screen

Level 11 Recreational Lounge (Dining Room)

  • Scotchgard furniture

Golf Room

  • Damp wipe golf simulator screen

Starburst (Level 70)

Corridor and Lift landings

  • Clean emergency exit signs

Recreational Sky Lounge, Kitchen and Dining Areas

  • Scotchgard furniture

  • Polish dining, coffee, pool and high tables remove scuff marks on legs

  • Apply leather conditioner to all seating where applicable

  • Polish all gold feature panels

  • Polish all feature columns

  • Clean internal cupboards, drawers & pantry shelves

  • Kitchen shelving dusted

  • Mircowave & Ovens deep cleaned

Sky Dining Room

  • Scotchgard furniture

  • Dust all feature lights

Star Dining Room

  • Scotchgard furniture

  • Dust all feature lights

Level 71

Corridor / Lift Lobby

  • Damp wipe wallpaper walls

  • Damp wipe common area doors

  • Scotchgard furniture

Recreational Library

  • Damp wipe wallpaper walls

  • Damp wipe common area doors

  • Scotchgard furniture

Platinum Lounge

  • Scotchgard furniture

Cloud Lounge

  • Scotchgard furniture

Cloud Suite

  • Scotchgard furniture

  • Damp wipe wallpapper walls

Apartment Floor Levels 98-11

  • Lift lobby floor tiles scrubbed.

  • Apartment door number signage

  • Wayfinding signage

Sign Off

  • Building Management Name:

  • Date and Time:

  • Building Management Signature:

  • Authorised Cleaning Company Representative Name:

  • Date and Time:

  • Authorised Cleaning Company Representative Signature:

Periodical Clean 6 Monthly

Cloudrise Ground Floor

  • Deep clean (using a Polivac) of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains and ensuring no black build up in grout and on skirtings.

  • Steam clean all couches, lounges, chairs , apply scotch guard and leather conditioner where applicable.

Carpark

  • Machine Scrub car park floor including thoroughfare and empty car park bays

Car park lift lobbies

  • Service corridor utility cupboards vacuumed and all rubbbish removed

  • Gas riser cupboards vacuumed and all rubbish to be removed

Bike Room

  • Deep clean (using a Polivac) of all floor tiled areas including all lifts adding recommended chemicals to ensure they are maintained to as new condition, removing all grease & oil stains and ensuring no black build up in grout and on skirtings.

Level 11 Amenities

Corridor Lift Landings

  • Clean emergency exit signs

  • Service corridor utility cupboards vacuumed and all rubbbish removed

Pool and surrounding area

  • Clean all ceiling panels

Level 11 Theatre

  • Vacuum padded felt walls

  • Steam clean carpet

Level 11 Recreational Lounge (Dining Room)

  • Polish timber flooring or detail clean as per manufacturers reccomendations

  • Steam clean carpet rugs

Starburst (Level 70)

Corridor and Lift landings

  • Clean emergency exit signs

Recreational Sky Lounge, Kitchen and Dining Areas

  • Polish timber flooring or detail clean as per manufacturers reccomendations

  • Steam clean carpet rug inserts

Skyrise Gym Facilities

  • Scrub flooring to remove stains on the floor

Sky Dining Room

  • Polish timber flooring or detail clean as per manufacturers reccomendations

  • Steam clean carpet inserts

Star Dining Room

  • Polish timber flooring

  • Steam clean Carpet

Level 71

Corridor / Lift Lobby

  • Diamond scrub granite inserts

  • Polish timber flooring or detail clean as per manufacturers reccomendations

  • Steam clean furniture and carpet

Recreational Library, Platinum Lounge, Cloud Dining, Lounge and Cloud Suite

  • Polish timber flooring

  • Steam clean furniture and carpet

Level 71 Theatre

  • Vacuum padded felt walls

  • Steam clean carpet & Furniture

  • Scotchgard furniture

Apartment Floor Levels 97-87

  • Clean emergency exit signs

  • Service rooms to be vacuumed and all rubbish to be removed. Wipe clean the condenser unit

  • Gas riser cupboards vacuumed and all rubbish removed

  • Utility cupboards vacuumed and all rubbbish removed

Apartment Floors Level 72-86

  • Carpet Steam Clean

  • Clean emergency exit signs

  • Service rooms to be vacuumed and all rubbish to be removed. Wipe clean the condenser unit

  • Utility cupboards vacuumed and all rubbbish to be removed

  • Gas riser cupboards vacuumed and all rubbish to be removed

Level 67-14

  • Carpet Steam Clean

  • Clean emergency exit signs

Sign Off

  • Building Management Name:

  • Date and Time:

  • Building Management Signature:

  • Authorised Cleaning Company Representative Name:

  • Date and Time:

  • Authorised Cleaning Company Representative Signature:

Annual Periodical Clean

Skyrise Ground Floor

  • Leather cleaner / protector applied to lobby feature walls

  • Mirrored ceiling panels

Cloudrise Ground Floor

  • Mirrored ceiling panels

Bike Room

  • Remove dust from bike racks

Apartment Floors Level 14-67

  • Service corridor utility cupboards vacuumed and all rubbbish removed

  • Condenser cupboards vacuumed and all rubbish to be removed. Condenser units to be wiped clean

  • Gas riser cupboards vacuumed and all rubbish to beremoved

Sign Off

  • Building Management Name:

  • Date and Time:

  • Building Management Signature:

  • Authorised Cleaning Company Representative Name:

  • Date and Time:

  • Authorised Cleaning Company Representative Signature:

Review report.

Review report by Building Management

  • Name:

  • Date Completed:

  • BM Signature

  • Cleaning Representative Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.